This is Mechanical Addendum No. 1, issued by the Division of Facilities Construction and Management (DFCM) on behalf of the Capitol Preservation Board for the Utah State Capitol Central Utility Plant Boiler Replacement project (DFCM Project #25255050, U3P Event #DA27006). The addendum, dated July 21, 2026, provides modifications to the construction documents prior to the bid submittal deadline and must be acknowledged by all bidders upon submission. Changes include clarifications and modifications to the flue vent system on drawing sheets MD100 and MH100.1, specifically: four keynotes added to existing drawings calling out flue vent modifications, demolition of existing flue risers, and adjustments to flue riser elevations and connections. The mechanical work involves removing existing boiler CPB-5, capping ends, and managing four individual existing 8-inch flue vents located within a 32-inch flue riser shell, with the stack to be preserved and reused with new inserts to support the new flue vent. Updated mechanical drawings for the boiler room demolition plan and remodel plan phases are attached to the addendum.
The addendum notes that there are no changes to the solicitation schedule, and bidders are required to ensure all addendum additions and changes are incorporated into their bids under penalty of potential disqualification. The original project has a construction cost estimate of $351,000.00 and is limited to prequalified general contractors currently on the DFCM Prequalified Contractors list as of the solicitation date. The addendum references attachments including updated drawing sets dated June 24, 2026, prepared by Lynk Engineers, Inc., with design approval from Hansel Halverson.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Addendum Cover Page, 2.26.2026
DFCM Addendum #1 Reference: Capitol Complex Utility Plant Boiler Replacement
Capitol Preservation Board DFCM Project #25255050 U3P Event #DA27006
Date: July 27, 2026
To: Prequalified General Contractors
From: The Division of Facilities Construction and Management
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.
Addendum Items
Solicitation Schedule Changes: There are no changes to the Solicitation Schedule in this addendum.
DFCM Addendum Items: N/A
Click to enter text Click to enter text Click to enter text
A/E Addendum Items: A/E Addendum # 1, dated July 21, 2027 Click to enter text
Total Attached Pages: 3
324 STATE STREET, SUITE 400, SALT LAKE CITY, UT 84111 / 800.678.7077 / LYNKENGINEERS.COM
MECHANICAL ADDENDUM NO. 01
To: Levi Waldron From: Hansel Halverson
Company: Division of Facilities Construction & Management
Date: July 21, 2026
Project: Utah State Capitol Central Utility Plant Boiler Replacement
The following changes as described below are issued as an addendum to the construction documents prior to bid submittal due date. The contractors are responsible to ensure all addendum additions and/or changes are included in their bid.
Drawings
Sheet MD100
1. Added keynote 3 for existing flue vent clarification.
2. Added keynote 4 to call out flue vent modification.
3. Added flue vent demo.
4. Added elevation of flue riser demo.
5. Added existing flue vent photos for clarification.
Sheet MH100.1
1. Added keynote 5 to call out flue vent modification.
2. Added flue riser modification.
3. Adjusted elevation view to show flue riser modification.
4. Adjusted flue connection to riser.
Specifications
Attachments
CUP Boiler_Drawings_Addendum 1_260721
End of Addendum
D D
E E
F F
STORAGE
EXTRACTION BAY
BOILER ROOM
CPB-1
CPB-3
CPBCP-1
CPBCP-2
CPSHWP-1
CPSHWP-2
CPSHWP-3
PET-7
PET-6
PET-5
PET-4
(E) 8"ø HWR(E) 10"ø HWR(E) 10"ø HWR
CPB-5 CPB-4
(E) 24"Ø FV
(E) 32"Ø FV
(E) 32"Ø FV
(E) 32"Ø FV UP
(E) 32"Ø FV UP
(E) 32"Ø FV UP
(E) 8"Ø FV (E) 8"Ø FV
(E) 10"ø HWR
(E) 10"ø HWR
(E) 10"ø HWS
(E) 10"ø HWS
(E) 8"ø HWS
(E) 6"ø HWR
(E) 10"ø HWS (E) 8"ø HWS
(E) 8"ø HWR
(E) 32"Ø FV UP1
MH100.1
MD100
E E
(E)CPB-4
(E)CPB-3
(E)CPAE-2
CPB-5
(E) 6"ø HWS
(E ) 6
"ø H
W R
LEVEL 1
0' - 0"
BASEMENT
-18' - 0"
LEVEL 1
0' - 0"
BASEMENT
-18' - 0"
(E) 8"Ø FV3
(E) 32"Ø FV4
STACK INSERT
TWO EXISTING 8"
FLUES TO BE DEMOED
AND REPLACED WITH
NEW SINGLE 12" FLUE.
767601
6HANSEL H.
HALVERSON
E
ED
P ROF E S S
ENG
I ONA L
IN
E
E R
S N
CI
L
S T A T E O F T A H U
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 www.lynkengineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2026 Lynk Engineers, Inc.
SHEET TITLE
PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
CONSULTANTS
E
DFCM PROJECT NO: 25255050
2026.06.24
C :\R ev it
Pr oj ec ts
\2
5-
9.
-L yn k- M ec h
C en tra l-V
_R us se ll.
J.
Fo st er .rv t
7/
/2
3:
:3
PM
RJF
HHH
RJF
2025-139.02
06/24/2026
PERMIT SET
BOILER ROOM MECHANICAL
DEMO PLAN
MD100
DFCM
UTAH STATE
CAPITOL CENTRAL
UTILITY PLANT
BOILER
REPLACEMENT
20 E 500 NORTH
SALT LAKE CITY, UT 84103
MECHANICAL GENERAL NOTESSHEET KEYNOTES
NORTH
SCALE: 1/4" = 1'-0"1 BOILER ROOM MECHANICAL DEMOLITION PLAN - PHASE 1
1.
2.
3.
4.
5.
ALL ITEMS SHOWN LIGHT ARE EXISTING.
ALL ITEMS SHOWN DARK AND DASHED ARE TO BE DEMOLISHED.
PATCH AND REPAIR ALL ITEMS DAMAGED DURING DEMOLITION.
WHERE SYSTEMS ARE PARTIALLY DEMOLISHED, SEE NEW WORK PLANS FOR INFORMATION ON NEW
CONNECTIONS. WHERE NO NEW CONNECTIONS ARE SHOWN ON NEW WORK PLANS, CAP PARTIALLY
DEMOLISHED SYSTEMS SO THE SYSTEM CAN BE RETURNED TO SERVICE.
CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK.
1 REMOVE EXISTING CPB-5.
2 CAP END.
3 FOUR INDIVIDUAL EXISTING 8" FLUE VENTS LOCATED WITHIN 32" FLUE RISER SHELL.
4 REMOVE STACK AS REQUIRED FOR DEMOLITION. PRESERVE AND REUSE. PROVIDE NEW INSERTS TO
SUPPORT NEW FLUE VENT.
SCALE: 1/4" = 1'-0"2 BOILER ROOM MECHANICAL DEMOLITION PLAN - PHASE 2
Mark: Date: Description 1 07/21/2026 Addendum 1
SCALE: 1/8" = 1'-0"3 FLUE RISER DEMO
SCALE: NTS4 EXISTING FLUE VENT PHOTOS
D D
E E
F F
(E)CPBCP-1
(E)CPBCP-2
(E)CPSHWP-1
(E)CPSHWP-2
(E)CPSHWP-3
(E)CPB-4
(E)CPB-3 (E)CPB-1
(E) 24"Ø FV
(E) 32"Ø FV
(E) 32"Ø FV
(E) 24"Ø FV
(E) 8"Ø FV
(E)PET-4
(E)PET-5
(E)PET-6
(E)PET-7
(E) 32"Ø FV UP
(E) 32"Ø FV UP
(E) 32"Ø FV UP
(E) 10"ø HWR
(E) 10"ø HWR
(E) 10"ø HWS
(E) 8"ø HWS
(E) 10"ø HWS
(E) 10"ø HWR
(E) 10"ø HWS (E) 8"ø HWS
(E) 8"ø HWR(E) 10"ø HWR
(E) 8"ø HWR
STORAGE
EXTRACTION BAY
BOILER ROOM
6"ø HWR
6"ø HWS
6"ø HWR
(E)CPAE-2
8" ø
HW
R
8" ø
HW
S
6"ø HWS
12"Ø FV
ME601
CPB-5
(E) 10"ø HWR (E) 10"ø HWS
(E) CV-1
MH100.1
(E) 8"Ø FV UP
(E) CV-2
(E) 8"Ø FV
MD100
32"Ø FV 5
12"Ø FV UP
LEVEL 1
0' - 0"
BASEMENT
-18' - 0"
LEVEL 1
0' - 0"
BASEMENT
-18' - 0"
12"Ø FV
32"Ø FV
12"Ø FV
767601
6HANSEL H.
HALVERSON
E
ED
P ROF E S S
ENG
I ONA L
IN
E
E R
S N
CI
L
S T A T E O F T A H U
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 www.lynkengineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2026 Lynk Engineers, Inc.
SHEET TITLE
PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
CONSULTANTS
E
DFCM PROJECT NO: 25255050
2026.06.24
C :\R ev it
Pr oj ec ts
\2
5-
9.
-L yn k- M ec h
C en tra l-V
_R us se ll.
J.
Fo st er .rv t
7/
/2
3:
:3
PM
RJF
HHH
RJF
2025-139.02
06/24/2026
PERMIT SET
BOILER ROOM MECHANICAL
REMODEL PLAN - PHASE 1
MH100.1
DFCM
UTAH STATE
CAPITOL CENTRAL
UTILITY PLANT
BOILER
REPLACEMENT
20 E 500 NORTH
SALT LAKE CITY, UT 84103
MECHANICAL GENERAL NOTESSHEET KEYNOTES
SCALE: 1/4" = 1'-0"1 BOILER ROOM MECHANICAL REMODEL PLAN
NORTH
1.
2.
COORDINATE FLUE ROUTING WITH PLUMBING AND MECHANICAL PIPING. PROVIDE OFFSETS AS
NECESSARY.
SLOPE FLUE TOWARD BOILER.
1 SLOPE FLUE TOWARD BOILER.
2 INSTALL NEW BOILER ON EXISTING HOUSEKEEPING PAD. PROVIDE NEOPRENE PAD AND ANCHOR TO
HOUSEKEEPING PAD AS DESCRIBED BY THE SEISMIC ENGINEER HIRED BY THE MECHANICAL
CONTRACTOR.
3 CONNECTION FOR PHASE 2 CONNECTION OF CPB-4.
4 INSTALL NEW ISOLATION VALES TO FACILITATE PHASE 2 DEMOLITION.
5 REMOVE STACK AS REQUIRED FOR DEMOLITION. PRESERVE AND REUSE. PROVIDE NEW INSERTS TO
SUPPORT NEW FLUE VENT.
SCALE: 1/8" = 1'-0"2 FLUE RISER
Mark: Date: Description 1 07/21/2026 Addendum 1
| Addendum 1 (2).pdf |
| CUP Boiler_Drawings_Addendum 1_260721.pdf |
| MD100 - BOILER ROOM MECHANICAL DEMO PLAN |
| MH100.1 - BOILER ROOM MECHANICAL REMODEL PLAN - PHASE 1 |
File details come from the government source that posted it. Updated .