This is a COMcheck Mechanical Compliance Certificate issued by the State of Utah's Division of Facilities Construction and Management (DFCM) for a boiler replacement project at the Capitol Complex Central Utility Plant in Salt Lake City. The project involves replacing an existing hot water boiler with a new gas-fired unit with a capacity of 3,999 kBtu/h and proposed efficiency of 87.30%, exceeding the 2021 IECC required efficiency of 82.00%. The mechanical system has been designed by Russell Foster, Sr. Mechanical Designer at Lynk Engineers, and was reviewed for code compliance on July 13, 2026, by Patrick Tomasino of DFCM. The construction site is located at 20 E 500 North, Salt Lake City, Utah 84103, in Climate Zone 5b, and the project has been certified as compliant with 2021 IECC requirements and all applicable mandatory inspection checklist requirements.
The related Stage II Invitation to Bid for this project indicates a construction cost estimate of $351,000. This is a prequalified contractor solicitation, meaning only contractors who have successfully completed Stage I Prequalification and appear on the DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The project was initiated under the State of Utah's procurement process with a project number 25255050, representing the utility plant's central boiler replacement need.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Title:
2021 IECC
Project Type: Alteration
Location: Salt Lake City, Utah Climate Zone: 5b
Construction Site:
20 E 500 North Salt Lake City, Utah 84103
Owner/Agent:
DFCM
350 N State Street Salt Lake City, Utah 84103
Designer/Contractor:
Russell Foster Lynk Engineers 505 East South Temple, Suite 100 Salt Lake City, Utah 84102
Project Information Energy Code:
CUP Boiler Replacement
Mechanical Systems List QuantitySystem Type & Description
Heating: Hot Water Boiler, Capacity 3999 kBtu/h, Gas Proposed Efficiency: 87.30 % Ec, Required Efficiency: 82.00 % Ec
1 CPB-5:
Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
CUP Boiler Replacement 06/24/26Report date:
114 ofPage
06/24/2026Russell Foster - Sr. Mechanical Designer
REVIEWED FOR
CODE COMPLIANCE
07/13/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Patrick Tomasino