SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closed State & local contract opportunity Posted

Solicitation number
2026-03
State
Florida
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Port St. Joe, Florida is requesting bids on the Workforce Housing Access Road Project under RFP 2026-03, with sealed bids due July 1, 2026 at 3:00 p.m. Eastern time. The project is funded through the Florida Job Growth Infrastructure Grant (Grant Number G0157).

The scope comprises underground utility construction, reconstruction of 915 linear feet of Tenth Street, and construction of a 958 linear foot access road from Tenth Street to Lighthouse Plaza, a new workforce housing development. A single prime contract will be awarded. Substantial completion is required within 90 days of the Notice to Proceed, with final completion within 120 days; liquidated damages are assessed at $750 per day for failure to meet the completion deadline.

All bids must comply with applicable Florida state and local licensing, registration, and contractor regulations. Bid prices must remain firm for 60 days following opening. Prospective bidders must submit a $100 non-refundable deposit to obtain bidding documents from Southeastern Consulting Engineers, Inc. (contact: Clay Murphy, E.I., 850-639-3860, Clay.Murphy@southeasternce.com; weekdays 7:00 a.m. to 4:00 p.m.). Additional charges apply for document delivery via shipping service or email. Sealed bids are to be opened publicly at 3:05 p.m. on July 1 at the City Clerk's office, City Hall, 305 Cecil G. Costin Sr. Blvd., Port St. Joe, Florida 32456.

Bids must include one original, five copies, and a flash drive containing the submission, with the company name and "SEALED RFP 2026-03" clearly marked on the envelope. The City of Port St. Joe reserves the right to waive bid informalities and reject any or all bids, selecting the bid deemed most advantageous to the city.

Opportunity text

7 versions

Update #7 · Latest ·

The services may include, but are not necessarily limited to, furnishing all labor, materials, equipment, tools, and services, and performing all work necessary to provide the Owner with the construction of a new roadway facility as shown on the Drawings and as specified in this solicitation. All work shall be in accordance with the Construction Drawings, Specifications, and Contract Documents.

Update #6 ·

The purpose of this CMAR selection process is to identify the Construction Management at Risk team that can best achieve and is generally responsible for the successful, timely, and economical completion of construction for a new educational Building Number 04, located at the Tallahassee State Colleges, Site 2 Campus - Gadsden Service Center (GSC).

Update #5 ·

The City of Hialeah Gardens ("City") is requesting Statements of Qualifications (SOQs) from qualified firms specializing in municipal water distribution system leak detection and condition assessment services. The selected Consultant shall perform a comprehensive, system-wide assessment of the City's potable water distribution system utilizing advanced leak detection technologies to identify existing leaks, estimate water loss, prioritize repairs, and provide recommendations to improve the efficiency, reliability, and long-term management of the City's water distribution system. Services include, but are not limited to, acoustic leak detection, leak verification, pressure analysis, GIS integration, condition assessment, and preparation of a comprehensive final report.

Update #4 ·

This project primarily consists of roadway and drainage improvements on N 2nd Street from Glenwood Ave to Warren Ave within the City of Chipley. Roadway improvements include complete reconstruction of the existing paved roadway with the addition of concrete shoulder gutter along both sides and new concrete driveways and isolated sections of concrete sidewalk replacement. Drainage improvements consist of replacement and upsizing of existing stormwater culverts along with the addition of concrete end treatments and concrete drainage inlets. Signing and pavement markings are also included with thermoplastic striping being placed on the final asphalt surface. This project also includes utility relocations to facilitate the new drainage improvements. Utility relocations consist of 8 water main, fire hydrants, water services, utility valve and manhole adjustments, and 2 to 2.5 natural gas mains relocated with welded steel gas pipe.

Update #3 ·

The project consists of underground utility construction, reconstruction of 915 linear foot of Tenth Street and the construction of a 958 linear foot access road from Tenth Street to Lighthouse Plaza, a new workforce housing development, in Port St. Joe.

Update #2 ·

The City of Doral is soliciting Bids for The City of Doral is soliciting Bids/Proposals for a qualified General Engineering Construction Contractor to construct NW 66th Street Roadway Widening from NW 102nd Avenue to NW 97th Avenue. The City intends to award a contract for the NW 66th Street Roadway Widening from NW 102nd Avenue to NW 97th Avenue to the Contractor that: possesses qualified manpower, equipment, administrative capabilities, applicable experience, and provides the best price proposal to the City. The NW 66th Street Roadway Widening from NW 102nd Avenue to NW 97th Avenue work generally entails the installation of inlet protection, maintenance of traffic (MOT), clearing and grubbing, roadway reconstruction, asphalt concrete, storm drain inlets, concrete manholes, pipe culvert, french drain systems, concrete curbing, sidewalks, sodding, temporary painted paving markings, thermoplastic paving markings, street lighting, embankment, related demolition of existing structures, guardrails, and milling of existing roadway surface as per approved S & S Plans provide by Gabriela P. Ramirez, P.E. of Kimley-Horn, dated 1/08/2024, all of which is attached hereto as attachment Exhibit F.

Update #1 ·

The City of Palatka is seeking proposals for a qualified and licensed contractor(s) to provide a proposal for services to for the design of deck replacement and rehabilitation of the Memorial Bridge Pedestrian Pier in accordance with applicable provisions of the Base Consultant Agreement, including that Agreements Exhibit A (Scope of Services), which is incorporated herein by reference. Any necessary engineering, drawings, permitting, inspections, materials, and equipment rentals should be included and described in detail for this proposal. The City shall secure the 10 of 117 Certificate of Appropriateness. The Contractor shall obtain all other necessary permits and approvals.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity