Center Park Dr. - 6200 S Trail Construction

Closed State & local contract opportunity Posted

Solicitation number
WJPW26070801
State
Utah
Responses due

Opportunity facts

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

The City of West Jordan, Utah Public Works Department is requesting bids for the Center Park Drive – 6200 South Trail Construction project (WJPW26070801), with electronic bids due August 6, 2026 at 2:00 p.m. Mountain Time through the Utah Public Procurement Place (U3P).

Bidders must hold a Utah General Contractor License classification S260 or S400 at the time of bid submission. No mandatory pre-bid conference or site visit is required, though independent site visits are encouraged.

The scope comprises construction of a meandering ten-foot-wide asphalt pavement trail on the west side of Center Park Drive from 6200 South to approximately 6600 South. Work includes mobilization, clearing and grubbing, traffic control, surveying, excavation and site preparation, 10,600 cubic yards of asphalt pavement (3-inch layer), 21,000 cubic yards of existing base course (6-inch layer), installation of 12,000 square feet of fabric, spray park strip with pesticide application (12,000 square feet), installation of rocks along the park strip (12,000 square feet), and striping of 4,200 linear feet of 4-inch solid dashed line. Work must be completed within ninety calendar days after the Notice to Proceed.

Bid security is required, and bid prices must remain firm for sixty calendar days from bid opening. Performance and payment bonds are required prior to contract award. Contract administration includes five percent retainage on payment applications. Liquidated damages are assessed at $560 per day for work remaining incomplete beyond the completion date. The contractor must submit executed contract documents, bonds, and insurance certificates within fourteen days of the Notice of Intent to Award, with the certificate holder listed as an additional insured on general liability and completed-operations coverage.

The contract incorporates APWA 2017 standards and UDOT 2023 specifications. The project is subject to President's Executive Order No. 11246 on federal non-discrimination and Utah workers' compensation insurance requirements.

Opportunity text

The Work comprises the construction of a meandering ten-foot-wide asphalt pavement trail. The project includes a 3" asphalt pavement over a 6" base course.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity