13800 South Mountain View Corridor Sewer Project

Closed State & local contract opportunity Posted

Solicitation number
JBID971
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

The Jordan Basin Improvement District is requesting sealed bids for the 13800 South Mountain View Corridor Sewer Project in Salt Lake County, Utah, with bids due October 13, 2026 at 2:00 p.m. — a restrictive prequalification requirement limits bidding to six named contractors: Newman Construction, Inc., Nix Construction, Red Pine Construction, LLC, Silver Spur Construction, LLC, Spade Excavating, Inc., and Whitaker Construction Co. Inc.

The scope includes installing approximately 500 linear feet of 18-inch sanitary sewer pipeline, constructing 3 sanitary sewer manholes, and executing a 434-foot-long guided bore with a 36-inch minimum casing crossing under the Mountain View Corridor, along with associated site work and appurtenances. Contractors performing the trenchless guided bore work must submit additional qualification and experience information per Specification 31 71 00 Tunnel Excavation and Initial Support.

Bidders must hold current Utah State Department of Commerce contractor licensure and provide comprehensive information including company name and contact details, years of experience, ownership and management structure, documentation of site inspection, proposed project superintendent and manager with resumes, proposed site safety representative, surety bonding information, and current job listings with completion status. Subcontractors performing more than 5% of the total bid price and suppliers or manufacturers for specified items must be listed; no changes or substitutions are permitted after bid opening without written owner approval. All bidders must submit a sworn statement before a notary public certifying that provided information is true and complete.

The bid bond must identify a penal sum and list a surety company appearing on the U.S. Department of the Treasury's current list (Circular 570, as amended) and authorized to conduct business in Utah. Bid prices must be firm for 60 days from the bid opening date. Work must commence within 10 days of receiving the Notice to Proceed, with substantial completion required by June 1, 2027, and final completion by July 1, 2027. Liquidated damages are $600 per day. A pre-bid conference was held September 24, 2026. Written questions are due by 5:00 p.m. on October 8, 2026, via https://utah.bonfirehub.com. Tentative award is scheduled for October 27, 2026, at the JBID Board Meeting.

Opportunity text

Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. The work includes installing approximately 500 linear feet of 18-inch sanitary sewer pipeline, 3 sanitary sewer manholes, a 434-foot-long guided bore (36-inch minimum casing) crossing under the Mountain View Corridor, and associated items to construct the new sewer lines.