Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 80KSC021R0023
- Agency
- Kennedy Space Center National Aeronautics and Space Administration
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Orlando FL 32899, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks replacement of five 15kV load break switches and two substations at various Kennedy Space Center locations. The National Aeronautics and Space Administration is procuring these upgrades to improve safety and reliability of institutional power systems. Offerors must propose removing old electrical equipment and installing new switchgears, transformers, load break switches, vacuum fault interrupters, and integrated control systems. Daily coordination will be required to perform the work while maintaining operational facilities. Proposals are due by May 24, 2021 and will be evaluated based on technical approach, past performance, and price.
This is a total small business set-aside solicited under NAICS code 237130, Power and Communication Line and Related Structures Construction. The small business size standard is $39.5 million. The anticipated award value ranges from $1 million to $5 million to be completed over a 730 calendar day period of performance at the Kennedy Space Center location. Offerors must have experience in construction, demolition, and installation of electrical power distribution equipment.
Notice text
Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. Project Control Number (PCN): 98966.
INTRODUCTION
The National Aeronautics and Space Administration (NASA) at the John F. Kennedy Space Center (KSC) is issuing Request for Proposal 80KSC021R0023, a construction requirement for Safety and Reliability Upgrades, KSC Institutional Power Systems, Phase 4.
The North American Industry Classification System (NAICS) code for this procurement is 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $39.5 million.
The project period of performance is 730 calendar days. The award amount is anticipated to be between $1,000,000 and $5,000,000.
This is a small business set-aside.
SCOPE OF WORK
- Replacement of 5 (five) existing 15KV Load Break Switches (LBS-736, VFI-777, LBS-735, LBS-46 and LBS-36) located at various locations in KSC with brand new 15KV Vacuum Fault Interrupters.
- The replacement of existing Operations Support Building 1 (OSB1) (Building K6-1096) substations “SS-1127A/B” and “1128A/B”. Both substations, are indoor double-ended M-T-M configuration supplied by four (4) 1500 KVA pad mounted transformers. The original building substations are approximately 29 years old and are obsolete. The two (2) new substations will be customized as a M-T-M configuration and will be customized to match the dimensions of the existing layout. The new substations will share a separate control panel that will have PLC controls integrated in.
Where used below, “removal” means selective demolition and potential storage of items removed, “replacement” means installation of new components/systems, and “reinstallation” means reuse of existing equipment removed in a new configuration.
The work includes, but is not limited to, the following:
- Removal of existing electrical equipment and installation of new substation switchgears, associated transformers, Load Break Switches (LBS), and Vacuum Fault Interrupters (VFI) including installation of PLCs at locations in the new substations, installation of equipment racks at locations in the substations, installation of control and power wiring, installation of sensing devices, connection to PLCs for the circuit, and LBSs, and VFIs
- Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities.
This project includes working in a fully operational facility that cannot have any significant duration of downtime due to launch and launch vehicle processing schedules. The facilities and buildings must remain operational. Phasing of work around daily operations of the OSB1 and other facilities is critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the OSB-1 and other facilities operational and perform the work specified.
NOTE: The Specifications and Drawings for this project have an Export Determination of EAR 99 – EAR Controlled – ITAR Controlled - and are considered controlled documents. Therefore, download of documents won’t be permitted until requesters have been cleared through the Defense Logistics Agency (DLA).
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment 06 signed.pdf | ||
| Amendment 05 signed.pdf | ||
| Amendment 04 signed.pdf | ||
| Amendment 03 signed.pdf | ||
| Amendment 02 signed.pdf | ||
| Amendment 01 signed.pdf | ||
| 80KSC021R0023 - RFP.pdf | ||
| Section L Appendix 1 - KSC Form 28-889 Visitor Badge Request.pdf | ||
| Section L Appendix 3 - Pre-Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Section L Appendix 4 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment J-A Project Deliverables.pdf | ||
| Attachment J-B KSC Project Specific Requirements.pdf | ||
| Section L Appendix 2 - Acceptable Identity Guide.docx | DOCX document | |
| Section L Appendix 5 - Badging Request Form (Secure Area).docx | DOCX document | |
| Attachment J-C Wage Determination FL20210001 Mod 3.pdf | ||
| Attachment J-D Certification of Progress Payments.doc | DOC document |
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Award Notice | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Solicitation | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Pre-Solicitation | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity