Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 80KSC021R0023
- Agency
- Kennedy Space Center National Aeronautics and Space Administration
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Orlando FL 32899 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the replacement of five 15kV load break switches and two substations at various Kennedy Space Center locations. The National Aeronautics and Space Administration is seeking these safety and reliability upgrades through Request for Proposal number 80KSC021R0023. The work includes removal and replacement of electrical equipment, installation of new switchgears and transformers, load break switches and vacuum fault interrupters. Daily coordination will be required to perform the work while keeping the operational facilities online. The solicitation is anticipated for mid to late April 2021, with a period of performance of approximately 730 calendar days.
The opportunity is set aside as a total small business and has a NAICS code of 237130 for power and communication line construction with a $39.5 million size standard. The estimated award amount is between $1,000,000 and $5,000,000 to replace the specific electrical equipment and customize two new substations at the Operations Support Building 1. Access to any released solicitation documents will require certification through the Defense Logistics Agency Joint Certification Program due to export controls.
Notice text
PRE-SOLICITATION NOTICE
Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. Project Control Number (PCN): 98966.4
INTRODUCTION
The National Aeronautics and Space Administration (NASA) at the John F. Kennedy Space Center (KSC) plans to issue Request for Proposal 80KSC021R0023, a construction requirement for Safety and Reliability Upgrades, KSC Institutional Power Systems, Phase 4.
The North American Industry Classification System (NAICS) code for this procurement is 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $39.5 million.
Estimated solicitation release date for this requirement is mid to late April 2021, with a project period of performance of approximately 730 calendar days. Estimated award amount is anticipated to be between $1,000,000 and $5,000,000.
SCOPE OF WORK
- Replacement of 5 (five) existing 15KV Load Break Switches (LBS-736, VFI-777, LBS-735, LBS-46 and LBS-36) located at various locations in KSC with brand new 15KV Vacuum Fault Interrupters.
- The replacement of existing Operations Support Building 1 (OSB1) (Building K6-1096) substations “SS-1127A/B” and “1128A/B”. Both substations, are indoor double-ended M-T-M configuration supplied by four (4) 1500 KVA pad mounted transformers. The original building substations are approximately 29 years old and are obsolete. The two (2) new substations will be customized as a M-T-M configuration and will be customized to match the dimensions of the existing layout. The new substations will share a separate control panel that will have PLC controls integrated in.
Where used below, “removal” means selective demolition and potential storage of items removed, “replacement” means installation of new components/systems, and “reinstallation” means reuse of existing equipment removed in a new configuration.
The work includes, but is not limited to, the following:
- Removal of existing electrical equipment and installation of new substation switchgears, associated transformers, Load Break Switches (LBS), and Vacuum Fault Interrupters (VFI) including installation of PLCs at locations in the new substations, installation of equipment racks at locations in the substations, installation of control and power wiring, installation of sensing devices, connection to PLCs for the circuit, and LBSs, and VFIs.
- Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities.
This project includes working in a fully operational facility that cannot have any significant duration of downtime due to launch and launch vehicle processing schedules. The facilities and buildings must remain operational. Phasing of work around daily operations of the OSB1 and other facilities is critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the OSB-1 and other facilities operational and perform the work specified.
No solicitation exists at this time; therefore, do not request a copy of the solicitation. If a solicitation is released it will be synopsized in the Beta.Sam.Gov Website. It is the potential offeror’s responsibility to monitor this site for the release of any solicitation or synopsis.
NOTE: If a solicitation is issued, it is anticipated that Specifications and Drawings for this project will have an Export Determination of EAR 99 – EAR Controlled – ITAR Controlled - and will be considered controlled documents. Therefore, download of documents won’t be permitted until requesters have been cleared through the Defense Logistics Agency (DLA). Please begin DLA registration immediately since clearance could take a couple of weeks. All contractors that will be interested in receiving drawings and specifications for this project will have to ensure they have been screened by the Defense Logistics Agency (DLA) Joint Certification Program (JCP) by completing a DD Form 2345. To complete the DD Form 2345, go to the website at
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/SpecificDD2345Instructions.aspx. This process does take time and the Government encourages contractors to start as soon as possible.
If a contractor has been previously screened by DLA they can verify if their status is still active by utilizing their cage code at: https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
Notice is hereby provided that access to the drawings and specifications will be limited to offerors certified by DLA.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Award Notice | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Solicitation | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Pre-Solicitation | |
| Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity