Amendment 04 signed.pdf
PDF 686 KB Posted
- Attached to
- Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. Federal contract opportunity
- Solicitation number
- 80KSC021R0023
About this file
This is a summary of a federal contract solicitation for Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. The National Aeronautics and Space Administration at the John F. Kennedy Space Center is seeking proposals to replace five existing 15kV load break switches and two substations at Operations Support Building 1 with new equipment. The work includes removal and replacement of electrical equipment, installation of switchgears, transformers, load break switches, and vacuum fault interrupters along with control wiring and sensing devices. Existing equipment contains hazardous materials requiring abatement. The period of performance is 730 calendar days with an anticipated award value between $1-5 million. This is a small business set-aside solicitation issued under NAICS code 237130 with a size standard of $39.5 million. Daily coordination will be required to perform the work while keeping critical facilities operational. Proposals are due by May 24, 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 06 signed.pdf | ||
| Amendment 05 signed.pdf | ||
| Amendment 03 signed.pdf | ||
| Amendment 02 signed.pdf | ||
| Amendment 01 signed.pdf | ||
| 80KSC021R0023 - RFP.pdf | ||
| Section L Appendix 1 - KSC Form 28-889 Visitor Badge Request.pdf | ||
| Section L Appendix 3 - Pre-Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Section L Appendix 4 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment J-C Wage Determination FL20210001 Mod 3.pdf | ||
| Attachment J-D Certification of Progress Payments.doc | DOC document | |
| Attachment J-A Project Deliverables.pdf | ||
| Attachment J-B KSC Project Specific Requirements.pdf | ||
| Section L Appendix 2 - Acceptable Identity Guide.docx | DOCX document | |
| Section L Appendix 5 - Badging Request Form (Secure Area).docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
NASA/KSC SOLICITATION 80KSC021R0023
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 CONSTRUCTION SERVICES AND PRICES
CLIN DESCRIPTION UNIT UNIT PRICE
0001 TASK 1- Replacement of OSB 1 Building 1 JOB $____________________ (K6-1096) SS-1127 A/B and SS-1128 A/B
(Identified in Specification 79K40868 and Package 2 – Drawing 79K40870).
0002 ADDITIVE 1 – Replacement of LBS-46 1 JOB $____________________ (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
0003 ADDITIVE 2 - Replacement of LBS-36 1 JOB $____________________ (Identified in Specification 79K40868 and
Package 1 – Drawing 79K40869).
0004 ADDITIVE 3 – Replacement of VFI-777 1 JOB $____________________ (Identified in Specification 79K40868 and
Package 1 - Drawing 79K40869).
0005 ADDITIVE 4 – Replacement of LBS-736 1 JOB $____________________ (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
0006 ADDITIVE 5 – Replacement of LBS-735 1 JOB $____________________ (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
TOTAL $____________________
(End of Clause)
B. 2 NFS 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is TBD.
B. 3 PROJECT DELIVERABLES
Contract deliverables (manuals, reports, plans, and other written documentation) to be provided under this contract are identified in Section J, Attachment J-A, Project Deliverables. The costs associated with providing the data in Attachment J-A are included in the firm-fixed price of the awarded contract. Nothing contained in Attachment J-A will relieve the Contractor from furnishing data called for by, or under the authority of, other provisions of this contract, which are
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C. 1 SCOPE OF WORK
The Contractor must furnish all management, supervision, labor, transportation, facilities, materials, tools, equipment, disposal, and documentation (except any property, including utilities, specified in the Schedule to be Government-Furnished) to perform all work for the Task(s) named below, and defined in the contract drawings and specifications.
CLIN DESCRIPTION
0001 TASK 1- Replacement of OSB 1 Building (K6-1096) SS-1127 A/B and SS-1128 A/B
(Identified in Specification 79K40868 and Package 2 – Drawing 79K40870).
0002 ADDITIVE 1 – Replacement of LBS-46 (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
0003 ADDITIVE 2 - Replacement of LBS-36 (Identified in Specification 79K40868 and
Package 1 – Drawing 79K40869).
0004 ADDITIVE 3 – Replacement of VFI-777 (Identified in Specification 79K40868 and
Package 1 - Drawing 79K40869).
0005 ADDITIVE 4 – Replacement of LBS-736 (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
0006 ADDITIVE 5 – Replacement of LBS-735 (Identified in Specification 79K40868 and
Package 1 -Drawing 79K40869).
C. 2 CONTRACT DRAWINGS, MAPS, SPECIFICATIONS, AND/OR STATEMENTS OF
WORK
(a) Five sets of full scale contract drawings, maps, specifications, and/or statements of work (excluding publications incorporated into the technical provisions by reference), plus one CD or DVD containing electronic, portable document format (PDF) versions, will be furnished at award to the Contractor without charge. The work must conform to the following contract drawings, maps, specifications, and/or statements of work, attached to this contract.
Drawing Number 79K40869, Titled “Replacement of 10 Load Break Switches”, Dated 12/16/2020, Sheets 1 through 35.
Drawing Number 79K40870, Titled “Replacement of SS-1127 A/B AND SS-1128 A/B”, Dated 12/28/2020, Sheets 1 through 22.
Specification Number 79K40868, Titled “Safety and Reliability Upgrade, KSC Institutional
ATTACHMENT J-B – KSC PROJECT SPECIFIC REQUIREMENTS
Collection Yard (DARCY) located at Schwartz Road Landfill. Follow the guidelines in KNPR 8500.1 Chapter 26, Section 4 which will be provided to the Contractor at the Pre-Work Conference.
ASPHALT, LAND CLEARING DEBRIS, DIMENSIONAL LUMBER
(NON-PRESSURE TREATED), WOODEN PALLETS, BLAST MEDIA
(NON-CONTAMINATED)
Asphalt, Non-contaminated blast media, Non-pressure treated and unpainted wood, lumber, plywood, green waste and land clearing debris from C&D operations must be taken to the Schwartz Road Landfill. Instructions on where to stockpile these items in the landfill will be given by personnel located inside the scale house at the entrance to the landfill.
CARDBOARD, ALUMINUM CANS, PLASTIC BEVERAGE BOTTLES,
GLASS (NON-INDUSTRIAL), WHITE PAPER / MIXED PAPER
These items require coordination with NASA recycling manager. NASA has recycling containers placed throughout KSC. The contractor shall collect, segregate and transport these materials to the closest receptacle. NASA may provide containers to contractor site for projects generating large volumes of materials in this category.
ELECTRICAL, OFFICE, AND OTHER EQUIPMENT
These items require inspection by RRMF/Environmental Management Branch recycling personnel to provide proper disposition of material. Electrical equipment (transformers / switchgear / panels / disconnects…..) disposition will be made on a case by case basis based on level of contamination and value. NOTE: LBS 46 shall be turned in to the government after being removed.
METALS: ALUMINUM, BRASS, COPPER, REBAR, STAINLESS
STEEL, STEEL, OTHER FERROUS, OTHER NON-FERROUS, SCRAP
METAL
All metals coated with non-liquid PCB paints with levels below 50 parts per million shall be recycled by the contractor. Any metals coated with non-liquid PCB paints with levels above 50 ppm shall utilize the Schwartz Road Landfill after Government approval.
CONTRACTOR PROPERTY
All materials and real property items checked below shall become property of the contractor at the NTP. The Contractor may, at his discretion, assume ownership of and recycle all
| Amendment 04 unsigned |
| Page 6 Section B Slip Sheet |
| Page 8 Section C Slip Sheet |
| Page 23 J-B-36 Slip Sheet |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 04 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: N/A |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Anthony M. Caruvana |
| Description[0]: The purpose of this amendment is to change the order of the Additives in Section B and Section C of the solicitation and change J-B-36 to identify that the existing LBS-46 is to be turned into the Government (if awarded). The attached slip sheets for Section B, Section C, and J-B-36 shall replace the existing pages in the solicitation |
The proposal due date remains unchanged - May 24, 2021 at 2:00:00 PM EDT.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NASA/John F. Kennedy Space Center |
Mail Code OP-CS, Attn: Anthony Caruvana Kennedy Space Center, FL 32899
| NameandAddress[0]: |
| AdministeredBy[0]: NASA/John F. Kennedy Space Center |
Mail Code OP-CS, Attn: Anthony Caruvana Kennedy Space Center, FL 32899
| ContractIDCode[0]: | |
| ReqNumber[0]: N/A | |
| AmendmentNo[1]: 80KSC021R0023 | |
| ModificationNo[0]: | |
| ProjectNo[0]: 98966.4 | |
| Page[0]: 1 | |
| Pages[0]: 4 | |
| EffectiveDate[0]: See Block 16C | |
| Dated9B[0]: 4/22/2021 | |
| Dated10B[0]: | |
| CheckBox9[0]: Off | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2021-05-12T14:15:55-0400 | |
| ANTHONY CARUVANA |
| DateSigned[0]: |
| DateSigned[1]: 5/12/2021 |
| Copies[0]: 1 |
| CopiesReturned[0]: |