PIJAO Utilities and Exterior Works
Award Notice Posted
- Solicitation number
- 19AQMM19R0147
- Agency
-
Office of Acquisition Management
Department of State
- Awarded
- to Constructora Marago S A S
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 19AQMM19C0157 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Colombian National Police training center (Cenop), located near to San Luis town, Tolima, Colombia. Tolima, Colombia
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
This requirement is awarded to Constructora Marago SAS on September 30, 2019. Awarded Vendors: Constructora Marago SAS. Contract Award Dollar Amount: $761,736.18. Contract Award Date: 2019-09-30.
Update #4 ·
This is a Solicitation Notice of the US Government's intent to issue a solicitation for the construction of the Utilities and Exterior Work for the GOER area in the Colombian National Police (CNP) Facilities in CENOP/Pijaos, San Luis (Tolima) Colombia.
The order of magnitude for this requirement is between $500,000 and $1,000,000.
The estimated period of performance is 150 calendar days.
This acquisition will be issued under full and open procedures.
The project consists in the construction of water supply, storm drainage and sewage utilities, as well as electrical utility for connectivity purposes for the Colombian National Police (CNP) in CENOP at Pijaos, San Luis, to support DICAR program at the existing GOER/CNP Facilities area. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.
The facilities consist of water supply, storm drainage and sewage utilities, as well as electrical utilities. The contractor shall also include bathroom facilities, drainage system, earthwork, backfilling, road construction at granular base level, concrete water storage tanks, landscaping and exterior work for containers area. The construction shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10), NTC 2050, RETIE, RETILAP, RAS, INVIAS, ENVIRONMENT STANDARDS, etc. as applied to each case.
Note: The contractor shall be responsible for transportation, meals and lodging for the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.
PLACE OF PERFORMANCE
Colombian National Police training center (CENOP), located near to San Luis town, Tolima, Colombia. It is located at the southwest part of the country in the Andina region. It is located 165 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 400 m. (1312 ft.) above sea level and the weather is dry.
See attached solicitation and its attachments for detail
**IMPORTANT SCHEDULES**
1. Pre-proposal Conference/Site Visit Attendance Request is due May 23, 2019 at 12:00 PM EDT.
2. Pre-proposal Conference/Site Visit will be held on May 29, 2019 at 10:00 AM local time
3. Questions to solicitation submission is due June 07, 2019 at 12:00 PM EDT
4. Proposals are due July 10, 2019 at 12:00 PM EDT
**Amendment 1 (19AQMM19R0147 0001) is hereby posted as of June 26, 2019. See attached Amendment for details.
.
Update #3 ·
This is a Solicitation Notice of the US Government's intent to issue a solicitation for the construction of the Utilities and Exterior Work for the GOER area in the Colombian National Police (CNP) Facilities in CENOP/Pijaos, San Luis (Tolima) Colombia.
The order of magnitude for this requirement is between $500,000 and $1,000,000.
The estimated period of performance is 150 calendar days.
This acquisition will be issued under full and open procedures.
The project consists in the construction of water supply, storm drainage and sewage utilities, as well as electrical utility for connectivity purposes for the Colombian National Police (CNP) in CENOP at Pijaos, San Luis, to support DICAR program at the existing GOER/CNP Facilities area. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.
The facilities consist of water supply, storm drainage and sewage utilities, as well as electrical utilities. The contractor shall also include bathroom facilities, drainage system, earthwork, backfilling, road construction at granular base level, concrete water storage tanks, landscaping and exterior work for containers area. The construction shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10), NTC 2050, RETIE, RETILAP, RAS, INVIAS, ENVIRONMENT STANDARDS, etc. as applied to each case.
Note: The contractor shall be responsible for transportation, meals and lodging for the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.
PLACE OF PERFORMANCE
Colombian National Police training center (CENOP), located near to San Luis town, Tolima, Colombia. It is located at the southwest part of the country in the Andina region. It is located 165 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 400 m. (1312 ft.) above sea level and the weather is dry.
See attached solicitation and its attachments for detail
**IMPORTANT SCHEDULES**
1. Pre-proposal Conference/Site Visit Attendance Request is due May 23, 2019 at 12:00 PM EDT.
2. Pre-proposal Conference/Site Visit will be held on May 29, 2019 at 10:00 AM local time
3. Questions to solicitation submission is due June 07, 2019 at 12:00 PM EDT
4. Proposals are due June 28, 2019 at 12:00 PM EDT
.
Update #2 ·
This is a Pre-solicitation Notice of the US Government's intent to issue a solicitation for the construction of the Utilities and Exterior Work for the GOER area in the Colombian National Police (CNP) Facilities in CENOP/Pijaos, San Luis (Tolima) Colombia.
The order of magnitude for this requirement is between $500,000 and $1,000,000.
The estimated period of performance is 150 calendar days.
This acquisition will be issued under full and open procedures.
The project consists in the construction of water supply, storm drainage and sewage utilities, as well as electrical utility for connectivity purposes for the Colombian National Police (CNP) in CENOP at Pijaos, San Luis, to support DICAR program at the existing GOER/CNP Facilities area. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.
The facilities consist of water supply, storm drainage and sewage utilities, as well as electrical utilities. The contractor shall also include bathroom facilities, drainage system, earthwork, backfilling, road construction at granular base level, concrete water storage tanks, landscaping and exterior work for containers area. The construction shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10), NTC 2050, RETIE, RETILAP, RAS, INVIAS, ENVIRONMENT STANDARDS, etc. as applied to each case.
Note: The contractor shall be responsible for transportation, meals and lodging for the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.
PLACE OF PERFORMANCE
Colombian National Police training center (CENOP), located near to San Luis town, Tolima, Colombia. It is located at the southwest part of the country in the Andina region. It is located 165 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 400 m. (1312 ft.) above sea level and the weather is dry.
The solicitation is expected to be posted around May 06, 2019 and it will be available for 30 days - reference 19AQMM19R0147. Award of a Hybrid (Firm-Fixed Price and Cost Reimbursable) contract is within 120 calendar days from the solicitation response date. A preproposal conference and/or site visit(s) will be scheduled and included in the solicitation.
Contractors shall express their interest in this solicitation by written correspondence to the attention of Joonpil Hwang. All correspondence shall be submitted via email to hwangj2@state.gov and must include the solicitation number 19AQMM19R0147 in the subject line. DO NOT TELEPHONE.
Firms shall be knowledgeable in written and spoken English and possess all appropriate permits and licenses to perform such work in Columbia. Solicitation and award will be subject to the laws and regulations of the United States of America and is being competed utilizing full and open competition procedures.
This is a pre-solicitation notice, otherwise known as a synopsis (summary). The solicitation pertaining to this notice will be available to all interested vendors.
.
Update #1 ·
This is a Pre-solicitation Notice of the US Government's intent to issue a solicitation for the construction of the Utilities and Exterior Work for the GOER area in the Colombian National Police (CNP) Facilities in CENOP/Pijaos, San Luis (Tolima) Colombia.
The order of magnitude for this requirement is between $500,000 and $1,000,000.
The estimated period of performance is 150 calendar days.
This acquisition will be issued under full and open procedures.
The project consists in the construction of water supply, storm drainage and sewage utilities, as well as electrical utility for connectivity purposes for the Colombian National Police (CNP) in CENOP at Pijaos, San Luis, to support DICAR program at the existing GOER/CNP Facilities area. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.
The facilities consist of water supply, storm drainage and sewage utilities, as well as electrical utilities. The contractor shall also include bathroom facilities, drainage system, earthwork, backfilling, road construction at granular base level, concrete water storage tanks, landscaping and exterior work for containers area. The construction shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10), NTC 2050, RETIE, RETILAP, RAS, INVIAS, ENVIRONMENT STANDARDS, etc. as applied to each case.
Note: The contractor shall be responsible for transportation, meals and lodging for the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.
PLACE OF PERFORMANCE
Colombian National Police training center (CENOP), located near to San Luis town, Tolima, Colombia. It is located at the southwest part of the country in the Andina region. It is located 165 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 400 m. (1312 ft.) above sea level and the weather is dry.
The solicitation is expected to be posted around March 29, 2019 and it will be available for 30 days - reference 19AQMM19R0147. Award of a Hybrid (Firm-Fixed Price and Cost Reimbursable) contract is within 120 calendar days from the solicitation response date. A preproposal conference and/or site visit(s) will be scheduled and included in the solicitation.
Contractors shall express their interest in this solicitation by written correspondence to the attention of Joonpil Hwang. All correspondence shall be submitted via email to hwangj2@state.gov and must include the solicitation number 19AQMM19R0147 in the subject line. DO NOT TELEPHONE.
Firms shall be knowledgeable in written and spoken English and possess all appropriate permits and licenses to perform such work in Columbia. Solicitation and award will be subject to the laws and regulations of the United States of America and is being competed utilizing full and open competition procedures.
This is a pre-solicitation notice, otherwise known as a synopsis (summary). The solicitation pertaining to this notice will be available to all interested vendors.
.
Files
| File | Type | Posted |
|---|---|---|
| Attachment__2.2_-_New_Drawings.zip | ZIP file | |
| Attachment__2.1_-_Drawings_(AutoCAD).zip | ZIP file | |
| Attachment__3_-_Bid_Chart_0001.xlsx | XLSX spreadsheet | |
| Section_B-M_19AQMM19R0147_00001_without_track_changes.pdf | ||
| SF30_19AQMM19R0147_0001.pdf | ||
| 19AQMM19R0147_0001_Questions_&_Answers.pdf | ||
| Section_B-M_19AQMM19R0147_00001_with_track_changes.pdf | ||
| 19AQMM19R0147.pdf | ||
| Attachment__2_-_Drawings.zip | ZIP file | |
| Attachment__6_-_Firm_and_Project_Information.pdf | ||
| Attachment__7_-_Offeror_Experience.docx | DOCX document | |
| 19AQMM19R0147_B-M.pdf | ||
| Attachment__1_-_19AQMM19R0147_Specifications.pdf | ||
| Attachment__5_-_Submittal_Register.pdf | ||
| Attachment__4_-_Insurance.pdf | ||
| Attachment__8_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Attachment__3_-_Bid_Chart.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity