Attachment__3_-_Bid_Chart_0001.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
PIJAO Utilities and Exterior Works
Solicitation number
19AQMM19R0147
Issued by

About this file

Attachment #3 - Bid Chart 0001

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Chart

-8XXXxOFFICIAL BIDDING CHART
-7XXXxPROJECT:UTILITIES AND EXTERIOR WORK FOR CNP GOER FACILIITES
-6XXXxPlace:CNP Facilities in CENOP, San Luis, Tolima, Colombia
-5XXXxDate:3/20/19
-4XXXx
-3XXXx
-2XXXxBASE BID
-1XXXx
StatusLinePHASEDIVSUBDIVSUBDIV ITEMITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
x1AA. GENERAL REQUIREMENTS$ 0.00
x33A11GENERAL REQUIREMENTS$ 0.00
P43A101 30 0001 32 16 00 20Construction Progress Documentation$ 0.00
x44A101 30 00l
x45A101 30 00l
P43A101 30 0001 33 00Submittal Procedures$ 0.00
x44A101 30 00l
x45A101 30 00l
P49A101 50 0001 50 00Temporary Construction Facilities and Controls$ 0.00
x50A101 50 00lTemporary Facilitites
Signage of Construction Work
Removal, relocation and replanting of existing trees
Electrical temporary connection
Temporary Water Supply connection
Dismounting of Temporary facilities
x51A101 50 00l
P61A101 70 0001 78 00Execution and Closeout Submittals$ 0.00
x62A101 70 00l
x63A101 70 00l
x70BB. CONTAINERS AREA$ 0.00
x75B32EXISTING CONDITIONS$ 0.00
D79B303 20 00.00 10Containers removal and relocation$ 0.00
x80B303 20 00.00 10l
x75B33CONCRETE$ 0.00
D79B303 20 00.00 1003 20 00.00 10Concrete Reinforcing$ 0.00
x80B303 20 00.00 10l
D82B303 30 0003 30 00Cast-in-Place Concrete$ 0.00
x83B303 30 00l
x84B303 30 00l
x109B77THERMAL AND MOISTURE PROTECTION$ 0.00
D110B707 21 1607 11 13Supply and installation of Trapezoidal Thermoacoustic Tile$ 0.00
x111B707 21 16l
x196B2223HEATING, VENTILATION AND AIR CONDITIONING$ 0.00
D197B2222 00 0023 00 00Air Conditioning Systems$ 0.00
x198B2222 00 00l
x199B2222 00 00l
x225B2626Electrical$ 0.00
D226B2626 20 0026 00 00Lighting and receptacles$ 0.00
x227B2626 20 00l
x228B2626 20 00l
x253C3131Earthwork$ 0.00
D254C3131 00 0031 00 00Earthwork$ 0.00
Washed Gravel
Exterior works and clean up
x256C3131 00 00l
D257C3131 11 0031 11 00Clearing and Grubbing$ 0.00
x258C3131 11 00l
x259C3131 11 00l
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l
x252CC. EXTERIOR WORKS$ 0.00
x253C3126Electrical Installation$ 0.00
D254C3131 00 0026 00 01Substation Electrical Installation$ 0.00
x255C3131 00 00l
x256C3131 00 00l
D257C3131 11 0026 00 02Panel Boards$ 0.00
x258C3131 11 00l
x259C3131 11 00l
x253C3131Earthwork$ 0.00
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l
x274C3333Utilities$ 0.00
P275C3333 11 0033 00 01Low Voltage Network$ 0.00
x276C3333 11 00l
x277C3333 11 00l
P275C3333 11 0033 00 02Connectors$ 0.00
x276C3333 11 00l
x277C3333 11 00l
P275C3333 11 0033 00 03Exterior Lighting Network$ 0.00
x276C3333 11 00l
x277C3333 11 00l
P275C3333 11 0033 00 04Internal Network$ 0.00
x276C3333 11 00l
x277C3333 11 00l
P275C3333 11 0033 00 05Grounding System$ 0.00
x276C3333 11 00l
x277C3333 11 00l
P275C3333 11 0033 11 00Water Supply Distribution$ 0.00
x276C3333 11 00l
P275C3333 11 00Water Storage Tank$ 0.00
x276C3333 11 00l
P275C3333 11 00Renovation to existing Water Storage Tank$ 0.00
x276C3333 11 00l
P278C3333 30 0033 30 00Sanitary Sewer$ 0.00
x279C3333 30 00l
x280C3333 30 00l
D281C3333 40 0033 40 00Storm Drainage Utilities$ 0.00
x282C3333 40 00l
x283C3333 40 00l
x70BD. BATHROOM 1$ 0.00
x75B33CONCRETE$ 0.00
D79B303 20 00.00 1003 20 00.00 10Concrete Reinforcing$ 0.00
x80B303 20 00.00 10l
D82B303 30 0003 30 00Cast-in-Place Concrete$ 0.00
x83B303 30 00l
x84B303 30 00l
x89B55METALS$ 0.00
D99B505 50 1405 50 13Metal: Metallic Structure$ 0.00
x100B505 50 14l
05 51 33Metal Capentry$ 0.00
x101B505 50 14l
x109B76WOOD, PLASTIC AND COMPOSITE$ 0.00
D110B707 21 1606 10 00Countertop$ 0.00
x111B707 21 16l
x109B79FINISHES$ 0.00
D110B707 21 1609 30 10Ceramic Tiling$ 0.00
x111B707 21 16l
x109B713Special Construction$ 0.00
D110B707 21 1613 34 19Special Building System$ 0.00
x111B707 21 16l
x196B2222PLUMBING$ 0.00
D197B2222 00 0022 00 00Plumbing, General Purpose$ 0.00
x198B2222 00 00l
x199B2222 00 00l
x225B2626Electrical$ 0.00
D226B2626 20 0026 23 00.00 00Internal Electrical Dsitribution System$ 0.00
x253C3131Earthwork$ 0.00
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l
x70BE. BATHROOM 2$ 0.00
x75B33CONCRETE$ 0.00
D79B303 20 00.00 1003 20 00.00 10Concrete Reinforcing$ 0.00
x80B303 20 00.00 10l
D82B303 30 0003 30 00Cast-in-Place Concrete$ 0.00
x83B303 30 00l
x84B303 30 00l
x89B55METALS$ 0.00
D99B505 50 1405 50 13Metal: Metallic Structure$ 0.00
x100B505 50 14l
05 51 33Metal Capentry$ 0.00
x101B505 50 14l
x109B76WOOD, PLASTIC AND COMPOSITE$ 0.00
D110B707 21 1606 10 00Countertop$ 0.00
x111B707 21 16l
x109B79FINISHES$ 0.00
D110B707 21 1609 30 10Ceramic Tiling$ 0.00
x111B707 21 16l
x109B713Special Construction$ 0.00
D110B707 21 1613 34 19Special Building System$ 0.00
x111B707 21 16l
x196B2222PLUMBING$ 0.00
D197B2222 00 0022 00 00Plumbing, General Purpose$ 0.00
x198B2222 00 00l
x199B2222 00 00l
x225B2626Electrical$ 0.00
D226B2626 20 0026 23 00.00 00Internal Electrical Dsitribution System$ 0.00
x253C3131Earthwork$ 0.00
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l
x70BF. BATHROOM RENOVATION$ 0.00
x75B32EXISTING CONDITIONS$ 0.00
D79B303 20 00.00 1002 00 00Preliminaries$ 0.00
x80B303 20 00.00 10l
x89B55METALS$ 0.00
05 51 33Metal Capentry$ 0.00
x101B505 50 14l
x109B76WOOD, PLASTIC AND COMPOSITE$ 0.00
D110B707 21 1606 10 00Countertop$ 0.00
x111B707 21 16l
x109B77THERMAL AND MOISTURE PROTECTION$ 0.00
D110B707 21 1607 41 63Roof Panels$ 0.00
x111B707 21 16l
x109B78OPENINGS$ 0.00
D110B707 21 1608 11 13Steel Doors and Windows$ 0.00
x111B707 21 16l
D110B707 21 1608 11 16Aluminum doors and fames$ 0.00
x111B707 21 16l
x109B79FINISHES$ 0.00
D110B707 21 1609 30 10Ceramic Tiling$ 0.00
x111B707 21 16l
x196B2222PLUMBING$ 0.00
D197B2222 00 0022 00 00Plumbing, General Purpose$ 0.00
x198B2222 00 00l
x199B2222 00 00l
x225B2626Electrical$ 0.00
D226B2626 20 0026 23 00.00 00Internal Electrical Dsitribution System$ 0.00
x253C3131Earthwork$ 0.00
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l
x290DD. MARKUPS$ 0.00
x291DDDTOTAL DIRECT COST PHYSICAL WORKS$ 0.00
x292DDDAdministration%$ 0.00
x293DDDUnforenseens%$ 0.00
x294DDDProfit%$ 0.00
x295DDDTAX(Over the profit value)%$ 0.00
x296DTTOTAL COSTS (Base bid) $$ 0.00
x296DTDBA
x296DTTOTAL COSTS (Base bid) including DBA$$ 0.00
pSpec Pending
DSpec Done
PUSpec Pending Update
xN/A

PSIB Page &P of &N San Jose del Guaviare

Sheet2

Sheet3 image1.emf

File details come from the government source that posted it.