Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

CNP PIJAOS POTABLE AND SEWAGE

01 32 16.00 20 SD-01 Preconstruction Submittals

1.3Construction schedule

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

01 78 00 SD-10 Operation and Maintenance

Data

3.3Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

03 11 13.00 10 SD-02 Shop Drawings

2.2.1Formwork

3.1.1Formwork

SD-03 Product Data

2.2Form Materials

SD-05 Design Data

2.1Calculations

03 15 00.00 10 SD-02 Shop Drawings

2.4Waterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

03 20 00.00 10 3.1Reinforcement

SD-03 Product Data

2.2Reinforcing Steel

SD-07 Certificates

2.2Reinforcing Steel

03 30 00.00 10 SD-03 Product Data

2.2Cementitious Materials

2.11Vapor Retarder

2.12Vapor Barrier

2.9Floor Hardener

2.4Chemical Admixtures

SD-05 Design Data

2.1.1Mixture Proportions

SD-06 Test Reports

2.1.1Mixture Proportions

3.7Testing and Inspection for CQC

3.7.5.4Compressive Strength

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-08 Manufacturer’s Instructions

2.1Curing Compound

05 12 00 SD-02 Shop Drawings

1.3.2Fabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

05 12 00 2.4.2Non-Shrink Grout

SD-06 Test Reports

3.7.1.2Weld Inspection Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

05 51 33 SD-03 Product Data

2.3Stairs and Ladders

07 13 53 SD-03 Product Data

2.1Elastomeric Waterproofing Sheet

Material

SD-07 Certificates

1.5Special Warranties

07 41 13 SD-02 Shop Drawings

1.3.5Roofing Panels

SD-03 Product Data

2.1Roof Panels

1.3.5Factory-Applied Color Finish

2.3Accessories

1.3.5Fasteners

SD-04 Samples

1.3.5Factory-applied Color Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

07 41 13 SD-07 Certificates

2.1Roof Panels

1.3.2Qualification of Applicator

SD-08 Manufacturer’s Instructions

1.3.5Installation Manual

SD-11 Closeout Submittals

1.7Warranties

22 14 29.00 40 SD-02 Shop Drawings

2.1Connection Diagrams

2.1Control Diagrams

SD-03 Product Data

2.1Manufacturer's Catalog Data

2.1Pump Performance Curve

2.2.1Water Pumps

SD-06 Test Reports

3.2.1Hydrostatic Leak

SD-08 Manufacturer’s Instructions

2.1Manufacturer's Installation

Instructions

26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings

SD-03 Product Data

2.1.1Panelboards

26 56 00 SD-01 Preconstruction Submittals

1.7.1 GLED Luminaire Warranty

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

26 56 00 2.2 GLED Luminaires

2.3.1 GPhotocell

2.4.1 GConcrete poles

2.5Brackets

SD-06 Test Reports

3.2Operating test

SD-08 Manufacturer’s Instructions

2.4.1Concrete poles

31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

1.3.2 GDewatering Work Plan

SD-03 Product Data

3.9 GUtilization of Excavated Materials

1.3.1.2Rock Excavation

3.4Opening of any Excavation or

Borrow Pit

SD-06 Test Reports

3.17Testing

SD-07 Certificates

3.17Testing

31 05 19 SD-07 Certificates

2.1.1Geotextile

31 11 00 SD-03 Product Data

3.5.1 GNonsaleable Materials

32 11 23 SD-06 Test Reports

2.3.1Initial Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

32 11 23 3.12.1In-Place Tests

32 93 00 SD-03 Product Data

2.3.5Peat

2.3.8Composted Derivatives

2.3.11Rotted Manure

2.3.9Gypsum

2.6.1.2Ground Stakes

2.4Fertilizer

2.6.1Staking Material

2.6.7Metal Anchors

33 11 00 SD-03 Product Data

2.1.1Pipe, Fittings, Joints and

Couplings

2.1.2Valves

2.1.2.5Valve Boxes

2.2.1Pipe Restraint

3.2.2Disinfection Procedures

SD-06 Test Reports

3.3.1.3Bacteriological Samples

3.2.1.1.5Hydrostatic Sewer Test

3.3.1.2Leakage Test

3.3.1.1Hydrostatic Test

SD-07 Certificates

2.1.1Pipe, Fittings, Joints and

Couplings

2.1.2Valves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

33 11 00 SD-08 Manufacturer’s Instructions

2.1.1.1.1.1PVCO Piping

33 30 00 SD-02 Shop Drawings

3.1.1Installation Drawings

SD-03 Product Data

2.2.8Frames, Covers, and Gratings

2.2.1Gravity Pipe

SD-06 Test Reports

3.3.1.1.1Low-Pressure Air Tests

33 71 01 SD-03 Product Data

2.6Conductors

2.5Insulators

2.2.2Concrete poles

2.2.1Fiberglass poles

2.12Cutouts

2.14Transformer

2.11Surge arresters

2.7Guy strand

2.9Anchors

SD-06 Test Reports

3.6Field Quality Control

1.4.3Ground resistance test reports

SD-07 Certificates

2.3.1Wood crossarms

SD-09 Manufacturer’s Field

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

33 71 01 2.18.1 Groutine and other tests

SD-10 Operation and Maintenance

Data

1.5.1Operation and Maintenance

Manuals

33 71 02 SD-02 Shop Drawings

2.2.1 GAluminum conductors

SD-03 Product Data

2.5 GMedium voltage cable

2.7 GMedium voltage cable joints

2.6 GMedium voltage cable

terminations

2.8 GLive end caps

3.4.2Pulling-In Irons

2.13.2 GManhole frames and covers

2.13.3 GHandhole frames and covers

2.14 GCable supports

SD-06 Test Reports

3.18.1 GField Acceptance Checks and

Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.