Overhaul Caisson DD2 at CFAS

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N4008420B6502
Agency
Naval Facilities Engineering Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2PZ Repair Or Alteration Of Other Non-Building Facilities
Place of performance
Sasebo 85700 JPN

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to overhaul Caisson Dry Dock No. 2 and the hydraulic operation system of a sluice valve at Commander, Fleet Activities Sasebo in Japan. The Naval Facilities Engineering Command seeks a contractor to perform the work in two construction sequences to be completed on-site with only one sequence worked at a time. Construction Sequence 1 requires overhaul of the hydraulic operation system, followed by Construction Sequence 2 which requires overhaul of Caisson Dry Dock No. 2. Proposals were due by specified dates with work to be completed according to schedules outlined in amendments and attachments. Evaluation criteria include technical qualifications, past performance, and price factors.

There is no set-aside designation for this opportunity. The NAICS code is 237990 and PSC code is R499. The work locations are specified as Sasebo, Nagasaki, Japan and Camp Foster in Okinawa, Japan. The contractor must perform on-site work for approximately 420 days for the hydraulic system overhaul and 210 days for the dry dock overhaul, with the potential for schedule adjustments. Attachments provide design documents, equipment lists, and responses to questions specifying responsibilities for items like quay fees and rigging plans during the work.

Notice text

10 versions

Update #10 · Latest ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Amendment 0005: Provide Government response to PPI, and provide revised specification, dated 25 Aug 2020  

Amendment 0006:  Provide Government response to PPI, dated 26 Aug 2020

Amendment 0007:  Provide revised specification, dated 01 Sep 2020

Amendment 0008: Provide Revised Page for Attachment 07, dated 04 Sep 2020 

Amendment 0009:  Provide Government response to PPI, dated 09 Sep 2020

Update #9 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Amendment 0005: Provide Government response to PPI, and provide revised specification, dated 25 Aug 2020  

Amendment 0006:  Provide Government response to PPI, dated 26 Aug 2020

Amendment 0007:  Provide revised specification, dated 01 Sep 2020

Amendment 0008: Provide Revised Page for Attachment 07, dated 04 Sep 2020 

Update #8 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Amendment 0005: Provide Government response to PPI, and provide revised specification, dated 25 Aug 2020  

Amendment 0006:  Provide Government response to PPI, dated 26 Aug 2020

Amendment 0007:  Provide revised specification, dated 01 Sep 2020

Update #7 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Amendment 0005: Provide Government response to PPI, and provide revised specification, dated 25 Aug 2020  

Amendment 0006:  Provide Government response to PPI, dated 26 Aug 2020

Update #6 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Amendment 0005: Provide Government response to PPI, and provide revised specification, dated 25 Aug 2020  

Update #5 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Amendment 0004:  Provide Government response to PPI, dated 18 Aug 2020 (Bid Opening is 10:00 AM on 28 Aug 2020 as shown in SF1442.)

Update #4 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Amendment 0003:  Provide Government response to PPI, dated 14 Aug 2020

Update #3 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Amendment 0002:  Provide Government Response to PPI, dated 07 Aug 2020 

Update #2 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Amendment 0001:  Provide video for the site, dated 05 Aug 2020

Update #1 ·

The Contractor must perform on-site work on one sequence at a time. They may not perform on-site work on both sequences simultaneously. The order in which the Construction Sequences must be performed is subject to discussions with the ContractingOfficer:

Construction Sequence No.1 – Overhaul Hydraulic Operation System of Sluice Valve

Construction Sequence No.2 – Overhaul Caisson Dry Dock No.2

Attachments

Show all 27

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Overhaul Caisson DD2 at CFAS Award Award Notice
Overhaul Caisson DD2 at CFAS This notice · Latest solicitation Solicitation
Overhaul Caisson and Hydraulic Operation System of Sluice Valve Original Pre-Solicitation