This document contains responses to pre-proposal questions (PPQ) for solicitation number N4008420B6502 to overhaul Caisson Dry Dock No. 2 at Commander, Fleet Activities Sasebo in Japan. The Navy seeks a contractor to perform two construction sequences - overhauling the hydraulic operation system of the sluice valve, and overall overhaul of the caisson. The PPQ responses provide clarification that the contractor may attach pad eyes to the caisson by welding for towing purposes with an approved install plan. The responses also state the tentative schedule for work on the hydraulic pumps from August to December 2021, and lists the relevant equipment in the solicitation attachments. The quay fee for berthing the caisson during towing and repair work should be included in the contractor's price.

View the file

Other files for this federal contract opportunity

Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (4) PPI Response N4008420B6502-Amend 0003

PPI Responses-N4008420B6502-Amend 0003

NO Reference Question Government Response

1 N/A

We have received information that the drain valve actuator for Dock #1 and #2 are interlocked.

Would it be possible to obtain the schedules for Dock 1 and 2 and possible time frames of when to conduct the removal and landing of hydraulic pump.

At the moment the Government can provide a tentative schedule but it is subject to change. Work for the hydraulic pump can be performed tentatively during the period of 3 August 2021 – 7 December 2021.

2 N/A

What would be the range of related equipment to hydraulic pumps? We have in mind the whole set including the pipings. Please clarify the specific range.

See pages 45-58 of the Attachment (2) for specific range for hydraulic pump equipment. Sheet M-018 (pdf page 56) has a “Remove and Provide Equipment List”. Sheet M-019 (pdf page 47) has a “Hydraulic Cylinder System Work List”. Sheet M- 022 (pdf page 50) has a “Parts List of Hydraulic Pump for Replacement List.”

Section 01 11 00. 00 33, 1.4.1.2 a.

Is it possible to attach necessary number of Pad Eye by welding on this barge, which is for the purpose of towing and dock-in and out at Dry Dock for repairing?

Yes, it is possible to attach pad eyes to the caisson for towing purposes. Prior to attaching the Contractor will need to submit an install plan to include strength calculation, position, etc. and it will need to be approved by the Contracting Officer.

Additionally there are for rigging points on the top of the Caisson. See photos DSC_0298, DSC_0300, & DSC_0301 for these locations.

Section 01 11 00. 00 33, 1.4.1.2 a

It is necessary to berth Caisson for ballast adjustment at a quay when the barge is towed to Dry Dock where it is repaired and also brought back to a specified place after repairing. Can we expect that the quay fee is paid by fund of this job?

Yes, the quay fee should be included in the Contractor’s price to do the work.