Attachment_5_eP1559827S-Revised Page-Amend 0005.pdf
PDF 27 KB Posted
- Attached to
- Overhaul Caisson DD2 at CFAS Federal contract opportunity
- Solicitation number
- N4008420B6502
About this file
This amendment to a Navy specification modifies the construction sequence requirements for a contract to overhaul a caisson dry dock and hydraulic operation system at a naval facility in Japan. The contractor has two options to complete the two construction sequences, with Option 1 allocating 420 work days for the hydraulic system overhaul and 210 days for the dry dock overhaul, while Option 2 allows up to 360 days and 270 days respectively. The sequences must be performed separately and the order will be determined in discussion with the contracting officer.
The related solicitation seeks proposals to perform the on-site overhaul work under the two construction sequences, with the hydraulic system sequence to be completed first followed by the dry dock sequence. The Navy's Naval Facilities Engineering Command is the issuing agency. Offerors must be able to perform the work for one sequence at a time without overlapping the on-site work between sequences.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION NO.
eProject No. 1559827
AMENDMENT NO. 0005
DATE: 24 August 2020
OVERHAUL CAISSON DRY DOCK NO. 2 AND
OVERHAUL HYDRAULIC OPERATION SYSTEM OF
SLUICE VALVE
At the
U.S. FLEET ACTIVITIES, SASEBO, JAPAN
The purpose of this amendment is to update construction sequence work requirements.
PARA. 1.6.2 Construction Sequence work:
Delete the Sentence “This contract has two (2) Construction Sequences.”, and substitute: “This contract has two (2) options to complete two (2) construction sequences. Options shown below:
Option (1) –
WORK SEQUENCE Work Days (Calendar Days)
Construction
Mailing Period 60 As described in para.
1.6.1
Overhaul Hydraulic Operation System of Sluice Valve
Work items described in para. 1.4.1.1.a through 1.4.1.1.e
Overhaul Caisson Dry Dock No. 2
210 Work items described in para. 1.4.1.2.a through 1.4.1.2.s
AMENDMENT NO. 0005 (1/2)
Option (2) – WORK SEQUENCE Work Days (Calendar
Days) Construction
Mailing Period 60 As described in para.
1.6.1
Overhaul Hydraulic Operation System of Sluice Valve
Up to 360
Work items described in para. 1.4.1.1.a through 1.4.1.1.e
Overhaul Caisson Dry Dock No. 2
Up to 270 Work items described in para. 1.4.1.2.a through 1.4.1.2.s
AMENDMENT NO. 0005 (2/2)