MCG API 653 Tank Inspection
Closed Solicitation Posted
- Solicitation number
- W9128F-21-R-0043
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541990 All Other Professional, Scientific, and Technical Services
- Place of performance
- Wrightstown NJ 08562 USA
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Perform multiple external and internal AST inspections on API. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the removal, transfer, or disposal of remaining fuel, replace wiper seals, provide strapping charts, clean the tank, and perform an AST (in service or out of service) inspection on the tank(s) specified in attachment B. The tank Inspection shall be in conformance with applicable industry standards (API 653), NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. Table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Update 3 Feb 2021: Updated Contact Information
Update 4 Feb 2021: Attachments / Question and Answer Post in the Attachments/Links Section
Update 9 Feb 2021: Question and Answer Update from 5 Feb
Update #3 ·
Perform multiple external and internal AST inspections on API. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the removal, transfer, or disposal of remaining fuel, replace wiper seals, provide strapping charts, clean the tank, and perform an AST (in service or out of service) inspection on the tank(s) specified in attachment B. The tank Inspection shall be in conformance with applicable industry standards (API 653), NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. Table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Update 3 Feb 2021: Updated Contact Information
Update 4 Feb 2021: Attachments / Question and Answer Post in the Attachments/Links Section
Update #2 ·
Perform multiple external and internal AST inspections on API. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the removal, transfer, or disposal of remaining fuel, replace wiper seals, provide strapping charts, clean the tank, and perform an AST (in service or out of service) inspection on the tank(s) specified in attachment B. The tank Inspection shall be in conformance with applicable industry standards (API 653), NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. Table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Update 3 Feb 2021: Updated Contact Information
Update #1 ·
Perform multiple external and internal AST inspections on API. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the removal, transfer, or disposal of remaining fuel, replace wiper seals, provide strapping charts, clean the tank, and perform an AST (in service or out of service) inspection on the tank(s) specified in attachment B. The tank Inspection shall be in conformance with applicable industry standards (API 653), NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. Table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
Attachments
| File | Type | Posted |
|---|---|---|
| Q_andA_21R0043_5_Feb_2021_McGuire_AFB.pdf | ||
| McGuire-Fac 1842 (Tank 1)-FINAL-2017.pdf | ||
| MCG-FAC 19-21-FY20-Final.pdf | ||
| Q_andA_21R0043_4_Feb_2021_McGuire (002).pdf | ||
| UFGS 33 56 21.17 - Single Wall Aboveground Fixed Roof Steel POL Storage Tank.pdf | ||
| Q_andA_21R0043_3_Feb_2021_McGuire.pdf | ||
| Attachment B - Fuel Storage Tank List (MCG).xlsx | XLSX spreadsheet | |
| Attachment I - Return To Service Letter.docx | DOCX document | |
| Attachment E - API In-Service Template.docx | DOCX document | |
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| W9128F-21-R-0043.pdf | ||
| Attachment C - Fuel Storage Tank Excel Document.xlsx | XLSX spreadsheet | |
| Attachment F - API Out-of-Service Example.pdf | ||
| Attachment G - API Out-of-Service Template.docx | DOCX document | |
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment H - API Out-of-Service Telecon Briefing Template.docx | DOCX document |