XTLF 20-1018 Replace Outside Runway PAPIs Submittal Register.pdf
PDF 86 KB Posted
- Solicitation number
- XTLF20-1018
About this file
This is a Submittal Register form (XTLF201018) dated January 1996, designed to track the submission, review, and approval of construction-related submittals for a federal contract project. The form serves as a management tool for documenting contractor submittals and government approvals throughout a construction project lifecycle.
The register covers a comprehensive range of construction submittals organized by specification sections, including preconstruction items (baseline construction schedule, QC plan, construction waste management plan), product data (backflow preventers, concrete materials, electrical components, airfield lighting systems), shop drawings (lighting and visual navigation aids, precast underground structures), test reports (concrete compressive strength, electrical continuity, cable installation), certificates of qualification, manufacturer's instructions, and operation and maintenance documentation. Specific technical submittals include concrete mix design and testing, electrical conduits and wiring, airfield lighting control systems (Type L-823, precision approach path indicator systems), isolation transformers, constant current regulators, control cables, frangible couplings, photometric testing, counterpoise system testing, low-voltage and high-voltage insulation tests, precast concrete structures with manhole and handhole frames and covers, and cable splicer and installer qualifications. The form includes columns for tracking submission dates, approval authority, material delivery requirements, contractor action dates, government receipt and review dates, and reviewer comments, enabling systematic management of preconstruction, construction, and closeout submittals throughout the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q-A 1.xlsx | XLSX spreadsheet | |
| Sign in Sheet PAPI.pdf | ||
| Vendor Authorization Request Template 1.2025.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPI Plans.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPIs Bid Form.xlsx | XLSX spreadsheet | |
| Wage Determination Rev 18 12-3-25.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPI Specifications.pdf | ||
| Q-A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES
XTLF201018
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2Baseline Construction Schedule
01 45 00.10 20 SD-01 Preconstruction Submittals
GQC Plan
01 50 00 SD-03 Product Data
1.4 GBackflow Preventers
01 74 19 SD-01 Preconstruction Submittals
GConstruction Waste Management
Plan
SD-06 Test Reports
1.6.2Quarterly Reports
1.6.3Annual Report
SD-11 Closeout Submittals
1.7 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.4.1Warranty Management Plan
1.4.4Warranty Tags
SD-10 Operation and Maintenance
Data
3.1 GOperation and Maintenance
Manuals
01 78 23 SD-10 Operation and Maintenance
Data
O&M Database
03 30 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES
03 30 00 2.3.4Joint Sealants
2.2.1Cementitious Materials
2.5Reinforcement
2.3.2Nonshrink Grout
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
Aggregates
3.11.2.3 GCompressive Strength Tests
3.11.2.4Air Content
SD-07 Certificates
2.5.1Reinforcing Bars
26 05 00.00 40 SD-03 Product Data
2.1.1 GConduits and Raceways
2.2.1 GWire and Cable
3.2.6 GSplices and Connectors
GCircuit Breakers
SD-06 Test Reports
3.4 GContinuity Test
3.4 GPhase-Rotation Tests
3.4 GInsulation Resistance Test
3.4 G600-Volt Wiring Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 56 20 SD-01 Preconstruction Submittals
1.4.5Protection plan
3.14.2Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES
26 56 20 SD-02 Shop Drawings
2.1Lighting and visual navigation aids
3.14.4Posted instructions
SD-03 Product Data
GAirfield lighting control and monitoring system
GType L-823
2.2.1.1 GPrecision approach path indicator
system
2.3 GLight bases
2.5 GIsolation transformers
2.5.1 GEncapsulated isolation
transformers
2.8 GConstant current regulators
3.9 GConstant current regulators
3.12.1 GConstant current regulators
2.9.1.5 GControl cable
2.9.2.7 GFrangible couplings
2.9.6 GType P-605
2.9.6 GType P-606
1.4.2 GMaterials and equipment
SD-06 Test Reports
3.11 GVisual inspection
3.11.1 GVisual inspection
3.12 GPhotometric testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES
26 56 20 GPAPIs
3.11.5 GProgress testing for series
lighting circuits
3.11.4 GCounterpoise system test and
inspection
3.11.2 GOperating test
3.11.3 GDistribution conductors, 600-volt
class
3.11.6 GElectrical acceptance tests
3.11.7 GLow-voltage continuity tests
3.11.8 GHigh-voltage insulation resistance
tests
2.8 GConstant current regulators
3.9 GConstant current regulators
3.12.1 GConstant current regulators
SD-07 Certificates
1.4.3 GQualifications of contractor
1.4.4 GQualifications of photometric
tester
2.10.1 GSpecial tools
3.14.2 GSpecial tools
3.1.6 G4-Jack positioning jig
3.1.6.1 GElevated light level
3.2.3.2 GCrimping tool
3.2.3.3Cable penciler
3.15.1 GList of parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES
26 56 20 SD-08 Manufacturer’s Instructions
3.14.4 GPosted instructions
SD-10 Operation and Maintenance
Data
2.8 GConstant current regulators
3.9 GConstant current regulators
3.12.1 GConstant current regulators
2.2 GApproach lighting systems
3.15.2 GMaintenance and repair
instructions
3.15.3Posted operations and maintenance instructions
SD-11 Closeout Submittals
3.14.3As-built drawings
31 23 00.00 21 SD-06 Test Reports
1.6 GBorrow Site Testing
3.9.2.4Density tests
33 71 02 SD-02 Shop Drawings
1.4.1 GPrecast underground structures
SD-03 Product Data
2.9.2.1 GPrecast concrete structures
2.9.2.4Sealing Material
3.4.3Pulling-In Irons
2.9.3 GManhole frames and covers
2.9.4 GHandhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES
33 71 02 GFrames and Covers for Airfield
Facilities
2.9.5 GDuctile Iron Frames and Covers
for Airfield Facilities
2.9.7 GComposite/fiberglass handholes
2.10 GCable supports
SD-06 Test Reports
3.14.1 GField Acceptance Checks and
Tests
3.3 GCable Installation Plan and
Procedure
SD-07 Certificates
GCable splicer/terminator
1.4.2 GCable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .