This is a set of bid drawings and design plans for the replacement of Outside Runway Precision Approach Path Indicator (PAPI) systems at Vance Air Force Base in Enid, Oklahoma (Project No. XTLF 20-1018). The drawings, issued in March 2026 and designed for 24" x 36" format, provide detailed specifications for the complete removal of existing PAPI units and installation of new FAA-compliant LED PAPI systems at both the north and south ends of the outside runway.
The project scope includes demolition of existing PAPI equipment, installation of new concrete pads with specific elevations and grading requirements, trenching and installation of new underground electrical conduit and wiring, replacement of control equipment in Building 197 lighting vault (including new 2.5 kW constant current regulators and circuit cutouts), grounding systems with copper counterpoise wire and ground rods, and comprehensive electrical connections. Key technical specifications include a 2.5-degree glide slope angle, concrete pad construction with 4-foot thickness and wire mesh reinforcement, 2-inch PVC conduit for underground runs, LED PAPI Type B light units with L-867 base cans, isolation transformers rated at 200W 20/6.6A, and 5KV shielded cable connections. The contractor must perform all work during non-flying hours (nights, Saturdays, holidays), obtain a dig permit from the construction manager, maintain Foreign Object Debris protocols at airfield pavement crossings, and notify the Operations and Safety office approximately 60 days before completion to coordinate a flight check. Work must follow UFC standards 3-260-02, 3-535-01, 3-535-02, and 3-501-01, with SOD restoration required in all disturbed areas and the site returned to original conditions upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q-A 1.xlsx | XLSX spreadsheet | |
| Sign in Sheet PAPI.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPIs Bid Form.xlsx | XLSX spreadsheet | |
| Wage Determination Rev 18 12-3-25.pdf | ||
| Vendor Authorization Request Template 1.2025.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPIs Submittal Register.pdf | ||
| XTLF 20-1018 Replace Outside Runway PAPI Specifications.pdf | ||
| Q-A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES AIR FORCE AIR EDUCATION TRAINING COMMAND
VANCE AFB, OK 140 Channel St. Suite 205
Vance AFB, OK 73705
(580) 213-7772
CA# 8716 Expires: June 30, 2026
PROJECT INFORMATION:
Project Name: Repair Outside Runway Precision
Approach Path Indicators
Project Location: VANCE AFB, ENID OK
Project No: XTLF 20-1018
MARCH 2026Issue Date:Project Status: BID DRAWINGS
RELEVANT CODE DOCUMENTS
DOCUMENT TITLE
SHEET INDEX
SHEET NUMBER DATE
TITLE & INDEX SHEET
SHEET NAME REVISIONS
GI001
GI002 PROJECT LOCATION & HAUL ROUTE
UFC 3-260-02- 2016 PAVEMENT DESIGN FOR AIRFIELDS
CS101 OUTSIDE RUNWAY SOUTH PAPI PLAN AND PROFILE
CS102
CD101
E100
F197 LIGHTING VAULT PLAN
CS301
E103
E501
CS302
ELECTRICAL DETAILS 1 OF 3
CS401
CS100 OVERALL SITE PLAN
OUTSIDE RUNWAY NORTH PAPI PLAN AND PROFILE
OUTSIDE RUNWAY ENLARGED PAPI PLAN
OUTSIDE RUNWAY GRADING AND CROSS SECTION PLAN SOUTH
OUTSIDE RUNWAY GRADING AND CROSS SECTION PLAN NORTH
OUTSIDE RUNWAY PAPI DEMOLITION PLAN
OVERALL ELECTRICAL PLAN
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
GI001
TI
TL
E
SH
EE
T
IN
DE
X
E101
E102
UFC 3-535-01- 2017 VISUAL AIR NAVIGATION FACILITIES
UFC 3-535-02- 2018 DESIGN DRAWINGS FOR VISUAL AIR NAVIGATION FACILITIES
UFC 3-501-01- 2024 ELECTRICAL ENGINEERING
OUTSIDE RUNWAY SOUTH PAPI WIRING
OUTSIDE RUNWAY NORTH PAPI WIRING
E502 ELECTRICAL DETAILS 2 OF 3
E503 ELECTRICAL DETAILS 3 OF 3
C501 CIVIL DETAILS
1. PRIMARY HAUL ROUTE.
2. SECONDARY HAUL ROUTE TO BE USED ONLY WHEN PRIMARY ROUTE GATE IS CLOSED.
3. PROJECT LOCATION.
4. FACILITY 288 CIVIL ENGINEERING INCLUDING CONSTRUCTION MANAGEMENT.
5. FACILITY 500 CONTRACTING FLIGHT.
6. FACILITY 72 VISITOR'S CENTER, USE FOR PASS APPROVAL PRIOR TO BEGINNING WORK.
7. FACILITY 75 COMMERCIAL VEHICLE INSPECTION.
8. MATERIAL LAY DOWN AREA.
GI002
PR
OJ
EC
T
LO
CA
TI
ON
H
AU
L R
OU
TE
A
GI002
PROJECT LOCATION
LEGEND
KEYNOTES
LOCATION AND HAUL ROUTE
1. APPROVED HAUL AND ACCESS ROUTES ARE NOTED ON THE PLAN. THE CONTRACTOR SHALL USE ONLY ACCESS
ROUTES THAT ARE PREVIOUSLY APPROVED BY CONSTRUCTION MANAGEMENT.
2. ALL NON-HAZARDOUS DEMOLITION WASTE PRODUCTS SHALL BECOME THE PROPERTY OF THE CONTRACTOR.
3. CONTRACTOR SHOULD SCHEDULE WORK IN ACCORDANCE WITH THE APPROVED CONSTRUCTION SEQUENCE
SUBMITTED DURING THE NON-PERFORMANCE PERIOD.
4. WORK TO BE PERFORMED DURING NO FLYING HOURS (NIGHTS, SATURDAYS, HOLIDAYS).
5. AREAS OF WORK NOTED AS ALLOWED DURING FLYING HOURS SHOWN ON PLANS. OPERATING EQUIPMENT MUST
PAUSE MOVEMENT WHILE AIRCRAFT PASS BY WORK AREA.
6. CHECK VEHICLE FOR FOREIGN OBJECTS AND DEBRIS (FOD) AT ALL AIRFIELD PAVEMENT CROSSINGS REQUIRED
FOR ALL EQUIPMENT CROSSINGS.
7. EXISTING CONSTRUCTION INFORMATION PROVIDED WITHIN THESE PLANS IS BASED ON RECORD DRAWINGS AND
FIELD INVESTIGATION AND MAY VARY WITHIN THE PROJECT. NOTIFY CONSTRUCTION MANAGER OF
DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS.
8. THE CONTRACTOR SHALL INSTALL NEW SOD IN ALL DISTURBED AREAS.
9. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION TO THE PROJECT.
10. RESTORE SITE TO ORIGINAL CONDITIONS.
11. GLIDE SLOPE SET TO 2.5° TO MATCH CENTER RUNWAY GLIDE SLOPE FOR AIRFIELD CONSISTENCY.
12. RUNWAY LONGITUDINAL STATIONING MATCHES STATIONING FROM PROJECT XTLF14-1012 REPAIR OUTSIDE
RUNWAY AND TAXIWAYS.
13. CONTRACTOR SHALL OBTAIN A DIG PERMIT FROM THE VANCE CONSTRUCTION MANAGER PRIOR TO EXCAVATION.
GENERAL NOTES
FOX DR.
GO
TT
R D.
EL
AM
R D.
NOT TO SCALE FOR LOCATION GENERAL REFERENCE ONLY
THIS GATE
ENTRANCE ONLY,
NO EXIT
NO EXIT
CHANNEL S
T
BROWN PKWY
ABBREVIATIONS
AFB - AIR FORCE BASE
ASTM - AMERICAN SOCIETY FOR TESTING AND MATERIALS
AC - ASPHALTIC CONCRETE
℄ - CENTER LINE
CCR - CONSTANT CURRENT REGULATOR
EX - EXISTING
EMT - ELECTRICAL METALLIC TUBING
ELEV - ELEVATION
kW - KILOWATT
KV - KILOVOLT
MAX - MAXIMUM
MIN - MINIMUM
NPS - NOMINAL PIPE SIZE
NTS - NOT TO SCALE
PAPI - PRECISION APPROACH PATH INDICATOR
PCC - PORTLAND CEMENT CONCRETE
PVC - POLYVINYL CHLORIDE
PVI - POINT OF VERTICAL INTERSECTION
PVT - POINT OF VERTICAL TANGENCY
RRP - RUNWAY REFERENCE POINT
STA. - STATION
STD - STANDARD
UFC - UNIFIED FACILITY CRITERIA
V - VOLT
TYP - TYPICAL
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
YOUNG RD
EL
AM
R D
SECONDARY BASE ENTRY AND ALL VEHICLE EXIT ROUTE
PRIMARY INDUSTRIAL INSPECTION ENTRY
BENCHMARK
VNC3
VNC2
1. BENCHMARK VNC#2, ELEVATION 1293.75, LOCATED EAST OF WEST WAY FENCE 14.1', IN LINE WITH SOUTH EDGE OF
WHEAT CAPITOL ROAD.
2. BENCHMARK VNC#3, ELEVATION 1279.41, LOCATED EAST OF CONCRETE WEIR 23.4', SOUTH OF 36" REINFORCED
CONCRETE PIPE 72.2', AND WEST OF PERIMETER ROAD.
SURVEY NOTES
1. CONTRACTOR TO NOTIFY THE CONSTRUCTION MANAGER AND OSS COMMANDER WHEN THE NEW PAPIS ARE APPROXIMATELY 60 CALENDAR DAYS FROM COMPLETION. 71 OSS/OSA WILL COORDINATE THE FLIGHT CHECK AND NOTIFY THE CONSTRUCTION MANAGER OF THE SCHEDULED FLIGHT CHECK DATE. CONTRACTOR TO PROVIDE REQUIRED SUPPORT DURING THE FLIGHT CHECK PROCESS AND TO IMPLEMENT CHANGES OR MODIFICATIONS
REQURIED TO PASS THE FLIGHT CHECK REQUIREMENTS.
SPECIAL CONSTRUCTION NOTES
CS100400'0 200'
SCALE: 1" = 200'
OV
ER
AL
L S
IT
E
PL
AN
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
A
CS100 1"=200'
OVERALL MAP
OUTSIDE RUNWAY
TAXI G
MATCHLINE
MATCHLINE
TAXI C
OUTSIDE RUNWAY
SOUTH PAPIS
SEE CS101
NORTH PAPIS
SEE CS102
LIGHTING VAULT
SEE E103
TA
XI
F
VNC3
100+00 110+0097+50 98+00 98+50 99+00 99+50 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 109+00 109+50 110+50 111+00 111+50 112+00 112+50 113+00
50'-0" 30'-0"
30'-0" 30'-0"
30'-0" 50'-0"
30'-0" 30'-0"
RRP STA=109+81.33
-2 +5
-2
+0
-1 +5
-1
+0
-0 +5
0+
0+
1+
1+
2+
2+
OUTSIDE RUNWAY PROFILE
99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00
RUNWAY REFERENCE POINT (RRP)
RUNWAY CROWN AT PAPI LENSE
STA=109+81.33
ELEV = 1304.88
THRESHOLD
STA=100+00.00
ELEV = 1307.77
CL OF PAPI LENSE
STA=109+81.33
ELEV = 1304.88
'-0
PVC
STA=110+00.00
ELEV = 1304.82
100'0 50'
SCALE: 1" = 50'
OU
TS
ID
E
RU
NW
AY
S
OU
TH
P
AP
I P
LA
N
AN
D
PR
OF
ILE
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CS101
EXISTING RUNWAY GRADE
30'-0" 50'-0"
2.5°
30'-0" 30'-0"
30'-0" 30'-0"
30'-0" 50'-0"
A
CS101 NTS
SOUTH END 35 L PAPI SITE PLAN
GLIDE SLOPE
NEW PAPI PAD (TYP)
SEE DETAILS C501
EXISTING PAPIS (TYP)
THRESHOLD
GRADE OF
RUNWAY
-0.29%±
180+00 190+00179+50 180+50 181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50 187+00 187+50 188+00 188+50 189+00 189+50 190+50 191+00 191+50 192+00 192+50 193+00 193+50 194+00 194+50 195+00 195+50
-2 +5
-2
+0
-1 +5
-1
+0
-0 +5
0+
0+
1+
1+
2+
2+
50'-0" 30'-0"
30'-0" 30'-0"
50'-0" 30'-0"
30'-0" 30'-0"
RRP STA=183+71.43
OUTSIDE RUNWAY PROFILE
182+00 183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00
THRESHOLD
STA=192+17.00
ELEV = 1276.12
RUNWAY REFERENCE POINT (RRP)
RUNWAY CROWN AT PAPI LENSE
STA=183+71.43
ELEV = 1279.16
CL ELEV OF PAPI LENSE
STA=183+71.43
ELEV = 1279.16
'-0
PVT
STA=182+00.00
ELEV = 1279.77
100'0 50'
SCALE: 1" = 50'
OU
TS
ID
E
RU
NW
AY
N
OR
TH
P
AP
I P
LA
N
AN
D
PR
OF
ILE
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CS102
EXISTING RUNWAY GRADE
30'-0" 50'-0"
2.5°
50'-0"
GLIDE SLOPE
30'-0" 30'-0"
30'-0" 30'-0"
30'-0"
THRESHOLD
A
CS102 NTS
NORTH END 17 R PAPI SITE PLAN
NEW PAPI PAD (TYP)
SEE DETAILS C501
GRADE OF
RUNWAY
-0.36%±
0+
9+
0+
1+
50'-0"30'-0"30'-0" 30'-0"30'-0"50'-0"30'-0" 30'-0"
RRP STA=109+81.33
-2+50 -2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50
-2+50 -2+00 -1+00 0+00 1+00 2+00 2+50
CROWN AT CL PAPI LENSE
CL STA=0+00.00 = STA. 110+27.10
ELEV = 1304.88
STA= -1+25.00
PAD ELEV = 1301.30STA= -1+55.00
PAD ELEV = 1300.50STA= -1+84.99
PAD ELEV = 1300.10
STA= -2+15.00
PAD ELEV = 1299.40
STA= 1+25.00
PAD ELEV = 1301.90 STA= 1+55.00
PAD ELEV = 1301.70
STA= 2+15.00
PAD ELEV = 1300.10
STA= 1+85.00
PAD ELEV = 1300.90
75'-0"50'-0"30'-0"30'-0" 75'-0" 50'-0"30'-0" 30'-0" 30'-0" 30'-0"
CL LENSE OF PAPI LIGHT ELEV = 1304.88
OU
TS
ID
E
RU
NW
AY
G
RA
DI
NG
A
ND
C
RO
SS
S
EC
TI
ON
P
LA
N
SO
UT
H
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CS3010
SCALE: 1" = 20'
40'20'
A
CS104
OUTSIDE RUNWAY SOUTH PLAN
1" = 20'
30'-0" 30'-0" 30'-0" 50'-0" 50'-0" 30'-0" 30'-0" 30'-0"
B
CS104
CROSS SECTION AT SOUTH PLAN
1" = 20'
1. SEE DETAIL A/C501 FOR PAPI PAD DETAIL.
2. SEE SHEETS E501 THROUGH E503 FOR PAPI LIGHT HOUSING DETAILS.
3. GROUND ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO ADJUST GRADE TO MATCH PAD ELEVATIONS WITH A MAXIMUM SLOPE OF 3:1.
4. CONTRACTOR SHALL CONTACT BASE ENGINEER IF PAPI LIGHT PAD CANNOT BE SET AT SHOWN ELEVATIONS.
5. CONTRACTOR TO PROVIDE FILL AS REQUIRED AROUND PAPI PADS TO ALLOW FOR SMOOTH SLOPE TRANSITIONS.
6. CONTRACTOR TO PROVIDE CERTIFIED ELEVATIONS OF THE TOP OF EACH PAD.
GENERAL NOTES
NEW PAPI PAD
(TYP)
CL CL CL CLCLCLCLCL
MATCH MOW STRIP
TO EXISTING SLOPE
(TYP)
2+
2+
3+
3+
4+
-2+50 -2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50
50'-0"30'-0"30'-0"30'-0" 50'-0" 30'-0" 30'-0" 30'-0"
RRP STA=183+71.43
-2+50 -2+00 -1+00 0+00 1+00 2+00 2+50
CROWN AT CL PAPI LENSE
CL STA=0+00.00 = STA. 183+71.43
ELEV = 1279.16
STA= -1+25.00
PAD ELEV = 1275.80
STA= -1+55.00
PAD ELEV = 1274.60STA= -1+85.00
PAD ELEV = 1273.80
STA= -2+15.00
PAD ELEV = 1273.50
STA= 1+55.00
PAD ELEV = 1274.70
STA= 1+25.00
PAD ELEV = 1275.80
STA= 2+15.00
PAD ELEV = 1273.50
STA= 1+85.00
PAD ELEV = 1274.00
75'-0"50'-0"30'-0"30'-0" 75'-0" 50'-0" 30'-0" 30'-0" 30'-0"
PAPI LIGHT ELEV = 1279.16
30'-0"
OU
TS
ID
E
RU
NW
AY
G
RA
DI
NG
A
ND
C
RO
SS
S
EC
TI
ON
P
LA
N
NO
RT
H
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CS302
A
CS105
OUTSIDE RUNWAY NORTH PLAN
1" = 20'
EXISTING GRADE
EXISTING GRADE
30'-0" 30'-0" 30'-0" 50'-0" 50'-0" 30'-0" 30'-0" 30'-0"
B
CS105
CROSS SECTION AT NORTH PLAN
1" = 20'
EXISTING PAPI (TYP) EXISTING PAPI (TYP)
NEW PAPI (TYP)NEW PAPI (TYP)
NEW
UNDERGROUND
ELECTRIC
1. SEE DETAIL A/C501 FOR PAPI PAD DETAIL.
2. SEE SHEETS E501 THROUGH E503 FOR PAPI LIGHT HOUSING DETAILS.
3. GROUND ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO ADJUST GRADE TO MATCH PAD ELEVATIONS.
4. CONTRACTOR SHALL CONTACT BASE ENGINEER IF PAPI LIGHT PAD CANNOT BE SET AT SHOWN ELEVATIONS.
5. CONTRACTOR TO PROVIDE FILL AS REQUIRED AROUND PAPI PADS TO ALLOW FOR SMOOTH SLOPE TRANSITIONS.
6. CONTRACTOR TO PROVIDE CERTIFIED ELEVATIONS OF THE TOP OF EACH PAD.
GENERAL NOTES
CL CL CL CLCLCLCLCL
EXISTING
UNDERGROUND
ELECTRIC
MATCH MOW STRIP
TO EXISTING SLOPE
(TYP)
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50
-2 +5
-2
+0
-1 +5
-1
+0
-0 +5
0+
0+
1+
1+
2+
2+
50'-0" 30'-0"
30'-0" 30'-0"
50'-0" 30'-0"
30'-0" 30'-0"
RRP STA=183+71.43
110+00108+00 108+50 109+00 109+50 110+50 111+00 111+50 112+00 112+50 113+00 113+50
50'-0" 30'-0"
30'-0" 30'-0"
30'-0" 50'-0"
30'-0" 30'-0"
RRP STA=109+81.33
-2 +5
-2
+0
-1 +5
-1
+0
-0 +5
0+
0+
1+
1+
2+
2+
80'0 40'
SCALE: 1" = 40'
OU
TS
ID
E
RU
NW
AY
E
NL
AR
GE
D
PA
PI
P
LA
N
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CS401
A
CS103
SOUTH END 35 L PAPI ENLARGED PLAN
1" = 40'
B
CS103
NORTH END 17 R PAPI ENLARGED PLAN
1" = 40'
EXISTING
PAPI (TYP)
EXISTING
PAPI (TYP)
EXISTING
PAPI (TYP)
EXISTING
PAPI (TYP)
TRENCH
LEGEND
NEW UNDERGROUND ELECTRIC
EXISTING UNDERGROUND ELECTRIC
UNDERGROUND ELECTRIC
TRENCHING
SEE DETAIL B/E501
UNDERGROUND ELECTRIC
TRENCHING
SEE DETAIL B/E501
UNDERGROUND ELECTRIC
TRENCHING
SEE DETAIL B/E501
UNDERGROUND ELECTRIC
TRENCHING
SEE DETAIL B/E501
GENERAL NOTES
1. CONTRACTOR SHALL RESTORE SOD IN ALL DISTURBED AREAS.
2. CONTRACTOR TO PROVIDE FILL AS REQUIRED AROUND PAPI PADS TO ALLOW FOR SMOOTH SLOPE TRANSITIONS.
NEW PAPI PAD (TYP)
SEE DETAILS C501
NEW PAPI PAD (TYP)
SEE DETAILS C501
NEW PAPI CONCRETE PAD
EXISTING ELECTRICAL
MANHOLE
NEW ELECTRICAL
HANDHOLE
SEE SHEET E501
INTERCEPT EXISTING CONDUIT AND
INSTALL NEW ELECTRICAL HANDHOLE
SEE SHEET E501
EXISTING ELECTRICAL
MANHOLE
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50 110+00108+00 108+50 109+00 109+50 110+50 111+00 111+50 112+00 112+50 113+00 113+50
80'0 40'
SCALE: 1" = 40'
OU
TS
ID
E
RU
NW
AY
P
AP
I D
EM
OL
IT
IO
N
PL
AN
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
CD101
A
CD101
OUTSIDE RUNWAY SOUTH
1" = 40'
B
CD101
OUTSIDE RUNWAY NORTH
1" = 40'
1. DEMOLISH EXISTING PAPIS AND APPLICABLE EQUIPMENT AFTER
NEW PAPIS HAVE BEEN INSTALLED, TESTED, AND APPROVED.
2. CONTRACTOR IS TO LEAVE EXISTING PAPI CONCRETE PADS IN
PLACE AFTER EXISTING PAPI EQUIPMENT HAS BEEN REMOVED
KEY NOTES
NEW PAPI (TYP)
NEW PAPI (TYP)
NEW PAPI (TYP)
NEW PAPI (TYP)
NEW ELECTRICAL
HANDHOLE
DISTANCE REMAINING
SIGN
DISTANCE REMAINING
SIGN
CI
VI
L D
ET
AI
LS
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
C501
LIGHT BASE
1" PVC WITH #4 GROUND
#4 @ 18" ON CENTER
EACH WAY
RLS
COMPACT SUBGRADE
TO 95% MINIMUM
COMPACTION
(TYP)
B C501
2 EACH
2" CONDUIT TO NEXT PAPI UNIT (TYP)
2" CONDUIT TO NEXT PAPI UNIT
2" SCH 40 PVC (TYP)
4'-0" THICK
CONCRETE SLAB
WITH LIGHT
BROOM FINISH
1" CONDUIT
MOWSTRIP - 5 1/2" THICK
WITH WIRE MESH
#6 BARE COPPER
3/4" X 10'-0" MINIMUM
COPPERCLAD GROUND
ROD WITH EXOTHERMIC
TEE-CONNECTION
TO NEXT PAPI UNIT
DUCT SEAL
SLIP-FITTER/RUBBER GROMMET
EXOTHERMIC
TEE-CONNECTION
EXPANSION JOINT
SEE DETAIL C/C501
5'- 0"
(H
OL
D) 5'-
0" (H
OL
D)
10'-0"
FRONT OF PAD
(HOLD)
5'-0"
BACK OF PAD
(HOLD)
4'- 0"
(M
IN
RE
FE
R
TO
MA
NU
FA
CT
UR
ER
'S
SP
EC
IFI
CA
TIO
NS
1/2" = 1'
8"
8'-0" (MIN)
REFER TO MANUFACTURER'S
SPECIFICATIONS
PAPI PAD PLAN
'-0
23'-0"
3" CLEAR
4'-
0"
SOD
SEE NOTE 1.
SOD
3" C
LE
AR
MOWSTRIP - 5 1/2" THICK WITH WIRE MESHMOWSTRIP - 5 1/2"
THICK WITH WIRE MESH
1'-0"EXPANSION
JOINT (TYP)
2" C
LE
AR
PAPI PAD SECTIONA
1/2" = 1'C501
A C501
JOINT SEAL MATERIAL
BACKER ROD
3/4" EXPANSION BOARD
3/4"
1/4
NEW PAVEMENT
SAW CUT
1-5 /8"
NEW PCC PAVEMENT
TYPICAL PCC EXPANSION JOINT DETAILC
NTSC501
NOTES
1. CONTRACTOR TO PROVIDE SOD IN ALL DISTURBED AREAS.
2. CONTRACTOR TO PROVIDE FILL SOD TO ENSURE POSITIVE DRAINAGE AROUND PAPI PADS.
FINISHED
GRADE
6"X6" - W2.9 X W2.9
WELDED WIRE MESH
REINFORCING
CUT CONSTRUCTION
JOINTS AS SHOWN (TYP)
RE: DETAIL D/C501 CONSTRUCTION JOINT
CONSTRUCTION JOINT
CONSTRUCTION JOINT
CONSTRUCTION JOINT
2"
1/8"
1/2"
1/8" 1/2"
SAW CUT
INITIAL
JOINT SEALER TOOLED AS SHOWN
PAVEMENT
SURFACE
BACKER ROD
D CONTRACTION & CONSTRUCTION JOINT AND SEALANT DETAIL
NTSC501
AIM TOWARD
THRESHOLD
400'0 200'
SCALE: 1" = 200'
OV
ER
AL
L E
LE
CT
RI
CA
L P
LA
N
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E100
A
CS100 1"=200'
OVERALL MAP
OUTSIDE RUNWAY
TAXI G
MATCHLINE
TAXI C
OUTSIDE RUNWAY
B197SEE SHEET E103
1. CONTRACTOR TO REPLACE EXISTING PAPI CIRCUIT WIRE FROM
BUILDING 197 TO NEW PAPI LIGHT SYSTEM.
GENERAL NOTES
CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING
CONDUIT FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS
CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING
CONDUIT FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS
CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING
CONDUIT FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS
TA
XI
F
MATCHLINE
SHEET E101
SHEET E102
RLS
1. INTERCEPT EXISTING CONDUIT AND CONNECT TO NEW BASE CAN. PULL NEW WIRE TO BASE CAN LOCATIONS.
2. SPLICE EXISTING CABLE FEEDING PAPIS. PROVIDE NECESSARY APPURTENANCES FOR A NEW SPLICE KIT.
3. TRENCH NEW CONDUIT BETWEEN NEW BASE CAN LOCATIONS. REFER TO DETAIL XX/E102
KEY NOTES
LEGEND
NEW UNDERGROUND ELECTRIC LIGHTING CIRCUIT
EXISTING UNDERGROUND ELECTRIC
100'0 50'
SCALE: 1" = 50'
OU
TS
ID
E
RU
NW
AY
S
OU
TH
P
AP
I W
IR
IN
G
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E101
NEW PAPIS
SEE SHEETS E501
THROUGH E503
CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING
CONDUIT FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS
GENERAL NOTES
1. CONTRACTOR TO REPLACE EXISTING PAPI WIRE IN EXISTING CONDUIT FROM
BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS.
2. DO NOT INTERRUPT POWER TO EXISTING PAPI LIGHTS UNTIL NEW PAPI LIGHTS ARE
INSTALLED, TESTED, AND APPROVED FOR USE.
3. CONTRACTOR TO FUNCTION CHECK ANY LIGHTING CIRCUIT DISTURBED IN
PROCESS OF PULLING NEW PAPI CABLES, INCLUDING BUT NO LIMITED TO
THRESHOLD, RUNWAY END LIGHTS, RUNWAY EDGE LIGHTS, AND INFORMATION
SIGNS. LIGHTING CIRCUITS TO BE FULLY FUNCTIONAL AT END OF WORK DAY.
EXISTING PAPIS
(TYP)
EXISTING PAPIS
(TYP)
EXISTING ELECTRICAL
MANHOLE
PAPI CIRCUIT WIRE TO BE
PULLED THROUGH THRESHOLD
LIGHT CANS / CONDUIT
NEW PAPIS
SEE SHEETS E501
THROUGH E503
RLS
1. INTERCEPT EXISTING CONDUIT AND CONNECT TO NEW BASE CAN. PULL NEW WIRE TO BASE CAN LOCATIONS.
2. SPLICE EXISTING CABLE FEEDING PAPIS. PROVIDE NECESSARY APPURTENANCES FOR A NEW SPLICE KIT.
3. TRENCH NEW CONDUIT BETWEEN NEW BASE CAN LOCATIONS. REFER TO SHEET E501.
KEY NOTES
OUTSIDE RUNWAY
TAXI G
LEGEND
NEW UNDERGROUND ELECTRIC
EXISTING UNDERGROUND ELECTRIC
INSTALL NEW ELECTRICAL
HANDHOLE
SEE SHEET E501
CONTRACTOR TO INSTALL 1X2" DUCT FROM EXISTING
ELECTRICAL MANHOLE TO NEW PAPI UNITS
CONTRACTOR TO INSTALL 1X2" DUCT FROM NEW
ELECTRICAL MANHOLE TO NEW PAPI UNITS
100'0 50'
SCALE: 1" = 50'
OU
TS
ID
E
RU
NW
AY
N
OR
TH
P
AP
I W
IR
IN
G
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E102
NEW PAPIS
SEE SHEETS E501
THROUGH E503
(TYP)
NEW PAPIS
SEE SHEETS E501
THROUGH E503
(TYP)
NEW UNDERGROUND
ELECTRIC THROUGH
EXISTING 4x4"DUCT
NEW UNDERGROUND
ELECTRIC
CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING
CONDUIT FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS
RLS
1. INTERCEPT EXISTING CONDUIT AND CONNECT TO NEW BASE CAN. PULL NEW WIRE TO BASE CAN LOCATIONS.
2. SPLICE EXISTING CABLE FEEDING PAPIS. PROVIDE NECESSARY APPURTENANCES FOR A NEW SPLICE KIT.
3. TRENCH NEW CONDUIT BETWEEN NEW BASE CAN LOCATIONS. REFER TO SHEET E501.
KEY NOTES
OUTSIDE RUNWAY
TAXI C
GENERAL NOTES
1. CONTRACTOR TO REPLACE EXISTING PAPI CONDUIT WIRE IN EXISTING CONDUIT
FROM BUILDING 197 LIGHTING VAULT TO NEW PAPI LIGHTS.
2. DO NOT INTERRUPT POWER TO EXISTING PAPI LIGHTS UNTIL NEW PAPI LIGHTS ARE
INSTALLED, TESTED, AND APPROVED FOR USE.
LEGEND
NEW UNDERGROUND ELECTRIC
EXISTING UNDERGROUND ELECTRIC
EXISTING ELECTRICAL MANHOLE
INSTALL CAP ON UNUSED DUCTS IN
MANHOLE
NEW ELECTRICAL MANHOLE. SEE SHEET E501
INSTALL CAP ON UNUSED DUCTS IN HANDHOLE
CONTRACTOR TO PROVIDE WEEP HOLE IN CONDUIT CAPS
CONTRACTOR TO INSTALL 1X2" DUCT FROM NEW
ELECTRICAL HANDHOLE TO NEW PAPI UNITS
CONTRACTOR TO INSTALL 1X2" DUCT FROM NEW
ELECTRICAL MANHOLE TO NEW PAPI UNITS
F1
LI
GH
TI
NG
V
AU
LT
P
LA
N
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E103
AFTER LED PAPI IN SERVICE, REMOVE
EXISTING PAPI LIGHT CCR, SELECTOR
SWITCH AND CUTOUTS.
INSTALL (2) NEW STACKED 2.5 KW, 480V, 5
STEP, 6.6 AMP PAPI LIGHT CCR 3 AND CCR
3A, AND NEW CIRCUIT SERIES CUTOUTS.
CONNECT EXISTING PRIMARY CABLE TO
NEW CUTOUTS.
BREAKER LOCATION
EXISTING PANEL LPC - 11,13
ADB CONTROL PANEL
SEE NOTE 1.
GENERATOR
A E103
F197 LIGHTING VAULT
NTS
1. COORDINATE WITH ADB SAFEGATE FOR CONTROL PROGRAMMING,
CONNECT 120V CONTROL WIRES FROM REGULATORS & THROUGH
EXISTING 120V GUTTER TO EXISTING CONTROL PANEL AND
PHOTOCELL CONTROL RELAY.
2. PROVIDE CUTOUTS AHEAD OF REGULATORS. CONTRACTOR TO
REMOVE EXISTING SELECTOR SWITCH CUT OUTS AND REGULATOR.
MOUNT NEW CUTOUTS ON EXISTING UNISTRUT FRAME. MOUNT
STACKED REGULATORS ON FLOOR.
3. USE EXISTING FLEXIBLE CONDUIT FOR CABLE CONNECTIONS
BETWEEN EQUIPMENT & GUTTERS.
4. GENERAL GUTTER ARRANGEMENT:
a. 5 kV GUTTER IS ON TOP, BELOW CEILING JOISTS.
b. 208 V GUTTER IS IN MIDDLE APPROXIMATELY 6' OFF FLOOR.
c. 120 V GUTTER IS APPROXIMATELY 2' OFF FLOOR.
d. GROUND WIRE IS APPROXIMATELY 1' OFF FLOOR - GROUND
ALL EQUIPMENT.
5. EACH CCR SUPPORTS TWO SETS OF PAPI LIGHTS (EAST AND WEST)
FOR ONE END OF THE RUNWAY.
6. CONTRACTOR TO PROVIDE CONDUIT AND WIRING TO CONNECT TO
NEW CCR TO 480V PANEL AS INDICATED.
7. CONTRACTOR TO MAKE ALL CONNECTIONS TO CCR ON THE SAME
SIDE OF THE CCR.
8. DEMOLITION OF CCR AND SELECTOR SWITCH TO BE COORDINATED.
F197 LIGHTING VAULT NOTES
RLS
EXISTING PAPI PHOTOCELL RELAY
CONTROL PANEL
480V PANEL
DEMO EXISTING SELECTOR SWITCH
DEMO EXISTING CCR #3
CCR 3
15A, PAPI 3
15A, PAPI 3A
PICTURE - PANEL SCHEDULE 480V
EL
EC
TR
IC
AL
D
ET
AI
LS
OF
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E501
AIM TOWARD
THRESHOLD
6"
6'- 0"
M
AX
ADJUST LEG
HEIGHT AS
REQUIRED
CONCRETE
MOW STRIP
ANCHOR ROD LIGHT BASE, FAA
L-867. SIZE B
CONCRETE BASE
2" SCH 40 PVC CONDUIT
BETWEEN PAPI LIGHT UNITS
1" PVC WITH #4 GROUND
3/4" X 10'-0" GROUND ROD
EXOTHERMIC CONNECTION
WATER-TIGHT FLEXIBLE
CONDUIT
BREAKABLE COUPLING AS SPECIFIED
BY PAPI MANUFACTURER
INTERNAL GROUNDING LUG
LIGHT ELEVATION
AS SHOWN ON
CS101 AND CS102
FRANGIBLE
COUPLING (TYP)
L-800 4-LAMP LIGHT UNIT
(TYP FOR 4 LIGHT UNITS IN
SYSTEM)
FINISHED
GRADE
1'-0"
EXPANSION
JOINT (TYP)
VARIES BY MANUFACTURE INSTALLATION DIAGRAM
2" C
LE
AR
PAPI LIGHT HOUSING ELEVATIONA
NTSE501
3" 3"
3"
3"
8"
1'- 6"
M
IN
(N
OT
E 3)
DISTANCE = X
(NOTE 2)
DISTANCE = X/2
(NOTE 2)
FULL STRENGTH
PAVEMENT
3"
1. DUCTS UNDER FULL STRENGTH PAVEMENT MUST BE CONCRETE ENCASED WITH A MINIMUM OF 3" (75mm) CONCRETE ENCASEMENT ON TOP, BOTTOM, AND SIDES. DUCTS UNDER TURF OR PAVED SHOULDERS MUST BE INSTALLED IN A BED OF SAND BACKFILL.
2. LOCATE COUNTERPOISE HALF WAY BETWEEN FULL-STRENGTH RUNWAY OR TAXIWAY PAVEMENT AND CENTER LINE OF LIGHT BASE CANS. INSTALL COUNTERPOISE 8" (200mm) MINIMUM BELOW FINISHED GRADE.
3. PROVIDE MINIMUM CONDUIT SLOPE OF 0.5 PERCENT WHERE POSSIBLE.
4. WHERE DUCT OR CONDUIT IS BELOW A PAVED SHOULDER, THE PATCH MATERIAL MUST MATCH THE EXISTING PAVEMENT.
LIGHTING DIRECT BURIED DUCT/CONDUIT DETAILB
NTSE501
SAND BACKFILL (NOTE 1)
2" (53mm) SCH 40 PVC WITH
CONDUCTORS AS REQUIRED
(NOTE 3)
BACKFILL MATERIAL AND
COMPACTION AS SPECIFIED IN
CONTRACT DOCUMENTS
FINISHED GRADE
4" TOPSOIL OR SHOULDER
PAVEMENT
(NOTE 4)
CENTER LINE OF LIGHT BASE
CANS
#6 SOLID BARE COPPER
COUNTERPOISE
(NOTE 2)
RLS
COMPACT SUBGRADE
TO 95% MINIMUM
COMPACTION
TYPICAL ELECTRICAL HANDHOLEC
NTSE501
D E501
6" MIN (TYP)
1'-0"
4'- 0"
1'- 0"
6"
EXTERNAL
GROUND
LUG
TYPE 3 AIRFIELD HANDHOLE
4'-0" X 4'-0" X 4'-0"
RECEPTACLE AND TERMINAL
BOX, SUBMERSIBLE
GROUND ROD AND CLAMP,
GROUND ALL ELECTRICAL
ENCLOSURES USING 1/C #6
BARE COPPER
NEMA 5-15R WITH
WATERTIGHT, SCREW COVER
AND CHAIN
1 - 3/C #12 600V CABLE TO OLS
CONNECTION PANEL AT OLS
PAD
2 - 4" PVC CONDUITS
CONCRETE ENCASED
PLAN
ELECTRIC
SUMP
#4 REBAR AT 6" O.C.
LENGTH AS REQUIRED
#4 REBAR AT 6" O.C.
2" MINIMUM PVC CONDUIT
WITH 1'-0" STUB
2" MINIMUM PVC CONDUIT
WITH CONDUCTORS AS
REQUIRED
PVC FLEXIBLE CONNECTOR
RGS/PVC ADAPTER COUPLING
3/4" X 10' GROUNDING ROD
2" HUB (AS REQUIRED)
SUMP, FILL WITH CRUSHED
STONE
#6 SOLID BARE COPPER
COUNTERPOISE
INTERNAL GROUND LUG
GROUND WIRE IF
REQUIRED FOR
CONSTANT VOLTAGE
CIRCUITS
NOTE:
WHERE CONNECTING TO
EXISTING DUCT BANK,
CONDUIT SIZES IN HANDHOLE
ARE TO MATCH EXISTING DUCT
BANK CONFIGURATION.
24" HANDHOLE LID
EL
EC
TR
IC
AL
D
ET
AI
L 2 O
F
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
E502
PAPI ENCLOSURE CONFIGURATIONA
NTSED602
ISOLATION TRANSFORMER
73A0178/40 6 PIN MALE INT THD - NOTE 2
TWO HUB BASE PLATE - SEE TABLE A
63A0563 CABLE CLAMP - NOTE 2
62A0711 FRANGIBLE COUPLING - NOTE 2
1-1/2 X 1-1/4 REDUCER
CONTRACTOR SUPPLIED - NOTE 5
1-1/4" MALE CONDUIT CONNECTOR
CONTRACTOR SUPPLIED - NOTE 5
1-1/4" FLEX CONDUIT, FLUID TIGHT
CONTRACTOR SUPPLIED - NOTE 5
FROM OPTICAL BOX - NOTE 2, NOTE 7
73A0176 6 PIN FEM EXT THDS
FROM OPTICAL BOX
73A0107/98 L-823 ST 1
73A0176 STD LENGTH
73A0176 /18 18 FT LENGTH
73A0107 / 98 STD LENGTH
73A0107 / 216 18 FT LENGTH
73A0107 / 98 STD LENGTH
73A0107 / 216 18 FT LENGTH
73A0180 STD LENGTH
73A0180 /18 18 FT LENGTH
73A0176 STD LENGTH
73A0176 /18 18 FT LENGTH
73A0107 / 98 STD LENGTH
73A0107 / 216 18 FT LENGTH
73A0180 STD LENGTH
73A0180 /18 18 FT LENGTH
PAPI TYPE B PRIMARY
BOX 1 OF 4
PAPI TYPE B SECONDARY
BOX 2 AND 3 OF 4
PAPI TYPE B SECONDARY
BOX 4 OF 4
ISOLATION TRANSFORMER ISOLATION TRANSFORMER
TWO HUB BASE
PLATE - SEE TABLE A
THREE HUB BASE
PLATE - SEE TABLE A
1-1/4" FLEX CONDUIT, FLUID TIGHT
CONTRACTOR SUPPLIED - NOTE 5
1-1/4" MALE CONDUIT CONNECTOR
CONTRACTOR SUPPLIED - NOTE 5
1-1/2 X 1-1/4 REDUCER
CONTRACTOR SUPPLIED - NOTE 5
63A0563 CABLE CLAMP - NOTE 2
62A0711 FRANGIBLE COUPLING - NOTE 2
73A0178 / 40 6 PIN FEMALE INT THD - NOTE 2 73A0178 / 40 6 PIN MALE INT THD - NOTE 2 73A0178 / 40 6 PIN FEMALE INT THD - NOTE 2
FROM OPTICAL BOX
73A0180 6 PIN MALE EXT THDS
FROM OPTICAL BOX
73A0107 / 98 L-823 ST 1
FROM OPTICAL BOX - NOTE 2, NOTE 7
73A0176 6 PIN FEMALE EXT THDS
FROM OPTICAL BOX
73A0180 6 PIN MALE EXT THDS
FROM OPTICAL BOX
73A0107 / 98 L-823 ST 1
RLS
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
R ev is io n N um be r D es cr ip tio n D at e
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 8716 EXPIRES
JUNE 30, 2026
RE
PL
AC
E
OU
TS
ID
E
RU
NW
AY
P
RE
CI
SI
ON
AP
PR
OA
CH
P
AT
H
IN
DI
CA
TO
RS
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
MARCH 2026
XTLF 20-1018
DESIGN STAGE:
DATE: MARCH 2026
BID DRAWINGS
PROJ TITLE: REPAIR OUTSIDE RUNWAY PRECISION APPROACH PATH INDICATORS
JJL CWT
L867B BASE PLT 2"HUB
X 12"DIA (2-11.5 NPS)
LED TYPE B 4 BOX PAPI SYSTEM
THRESHOLD
APPROX. 3.15 IN
BASE PLATE (2-11.5 NPS)
NEW L-867B BASE CAN
EXTERNAL INTERCONNECT KIT PROVIDED WITH SYSTEM
CABLE CLAMP
FRANGIBLE COUPLING
1-1/4" MALE CONDUIT CONNECTOR
1-1/2 X 1-1/4 REDUCER
1-1/4" FLEX CONDUIT, LIQUID TIGHT
6 PIN MALE CONNECTOR
FROM OPTICAL BOX
2 IN DIA EMT TUBING (2 3/16 OD) TO BE PROVIDED AND INSTALLED
BY CONTRACTOR. LENGTH TO BE DETERMINED AT INSTALLATION
TO ADJUST FOR UNEVEN TERRAIN AND TO MOUNT OPTICAL BOX
AT CORRECT ELEVATION ABOVE THE RUNWAY. 2 IN EMT TUBE TO
EXTEND 3 1/4" INTO FRANGIBLE COUPLING AND FULL INSERTION
INTO COMPRESSION COUPLING TO ENSURE STABLE
INSTALLATION. TUBE MUST BE PAINTED INTERNATIONAL ORANGE
PER FED-STD-595, COLOR 12197 TO PROVIDE CORROSION
PROTECTION.
G
G
E E
25.25"
13.25"
19.6"
34.72"
41.49"
2.5°
NOM
34.72"
12.55" 4.26"
2.8-6.6A SERIES CIRCUIT
AS REQUIRED
LOW VOLTAGE PAPI
INTERCONNECT
COMM CABLE
L-867B LIGHT BASE
3.5"
EXISTING PAD
STAINLESS
STEEL ACHOR
BOLT
H E102
3.5"
L-867
BASE
L-823 CONNECTOR
WITH HEAT SHRINK
AND SEALED COVER
PROVIDE 2'-0" SLACK
FOR CONNECTIONS
2" PVC ENCASED CONDUIT
WITH 1/C, #6 5KV UNSHIELDED, 133%
INSULATION, (L-824 CABLE)
AND #6 GROUND WIRE
BARE COPPER COUNTERPOISE
WIRE ROUTED AROUND BASE
GROUND WIRE PULLED
WITH POWER CABLE
LOW VOLTAGE PAPI
INTERCONNECT CABLES
6.6A : 6.6A AIRFIELD LIGHTING
ISOLATION TRANSFORMERS
30FT 30FT 30FT
AIRFIELD LIGHTING ISOLATION
TRANSFORMER PLATFORMS
PAPI TYPE B INSTALLATIONA
NTSE503
PAPI TYPE B 4 BOX SYSTEMB
NTS
PAPI TYPE B ELEVATIONC
NTS
PAPI TYPE B PLAN VIEWD
NTS
ANCHOR PATTERN TYPICALE
NTS
ANCHOR BOLT TYPICALF
NTS
BASE CAN CABLE DETAILH
NTS
FRANGIBLE COUPLING TYPICALG
NTS
TWO 9/16 DIA MOUNTING
HOLES LOCATED ON A 4 34"
BOLT CIRCLE, 180 APART
ANCHOR SLEEVE
RLS
EL
EC
TR
IC
AL
D
ET
AI
L 3 O
F
E503
FRANGIBLE COUPLING
(TYP)
SEE SHEET C501 FOR
PAPI CONCRETE PAD
DETIALS E503
E503 E503
E503E503
E503 E503
2.8-6.6A SERIES CIRCUIT
AS REQUIRED
BASIS OF DESIGN - PAPI EQUIPMENT LIST
ITEM PART # DESCRIPTION QTY
MATERIAL PAPI UNITS 4
1.1 RPB421A14S0B1001
RELIANCE LED PAPI • STYLE B (CURRENT) 2.8-6.6 A 50/60 HZ • TYPE L-880(L) / PAPI (4 BOX)
• FAA CERTIFIED • ALUMINUM HOUSING • 8 FT (2.4 M) POWER CORD • STYLE A (VOLTAGE)
WITH NO CONTROL MODE OR STYLE B (CURRENT) WITH CCR CONTROL • BAFFLES ON
BOTH SIDES • WITH TOUCHPAD COVER
1.2 AP2832-2G L867D BASEPLATE W/2-2" THD HUBS W/GROUND 8
1.3 AP2832-3G L-867D BASE PLT, 3/8" THICK W/ 3-2" HUBS 8
1.4 6104CO BOLT SET 3/8"-16 X 2" (6) RED W/CEC 16
1.5 1ST20026601001 ITX-A 200W 20/6.6A 60Hz FAA L830-7 16
1.6 70A0014/CK CONN PRIMARYCOMPLETE KIT#6 L823 11805-04 16
MATERIAL 2.5KVA FERRO RESONANT CCR 2
2.1 CRF6602A5F3A000 6.6A 2.5KW SCO 5S 480V L829 IRMS FERRO 2
2.2 1475.92.030
TYPE: PLUG-IN HIGH VOLTAGE CUT-OUT (SCO) SERIES: S-1 SERIES CUTOUT WORKING
VOLTAGE: 5 KV
CURRENT CAPACITY: 20 A
2.3 44C1793/1 S-1 ENCLOSURE FOR SCO CUTOUT 2
PROGRAM ALCMS UPGRADE BY ADB SAFEGATE 1
| Sheets and Views |
| GI001 |
| 2 - GI002.pdf |
| Sheets and Views |
| GI002 |
| PAPI Sheets.pdf |
| Sheets and Views |
| Repair Outside Runway PAPIs - CS100 SP |
| Repair Outside Runway PAPIs - CS101 SP |
| Repair Outside Runway PAPIs - CS102 SP |
| Repair Outside Runway PAPIs - CS301 |
| Repair Outside Runway PAPIs - CS302 |
| Repair Outside Runway PAPIs - CS401 SP |
| Repair Outside Runway PAPIs - CD101 |
| Repair Outside Runway PAPIs - C501 |
| Repair Outside Runway PAPIs - E100 |
| Repair Outside Runway PAPIs - E101 |
| Repair Outside Runway PAPIs - E102 |
| Repair Outside Runway PAPIs - E103 |
| Repair Outside Runway PAPIs - E501 |
| Repair Outside Runway PAPIs - E502 |
| Repair Outside Runway PAPIs - E503 |
| E103.pdf |
| Sheets and Views |
| E103 |
| E103.pdf |
| Sheets and Views |
| E103 |
File details come from the government source that posted it. Updated .