Wheatley_Reservoir_Dredging_Procurement_Request_07.15.25_-_signed.pdf

PDF 272 KB Posted

Attached to
Wheatley Dam Dredging Services
Solicitation number
26-027
Issued by
Charles County, Maryland

About this file

This is a formal procurement request submitted by Charles County Government's Public Works – Facilities Division (Environmental Resources) for dredging services at Wheatley Reservoir located in Gilbert Run Park, Charlotte Hall, Maryland. The County is soliciting sealed bids from qualified dredging firms to provide wet dredging, hauling, and sediment disposal or beneficial reuse services. The scope of work includes mobilization, dredging of the reservoir (which has not been dredged since its creation in 1968), hauling of sediment, disposal of sediment, and demobilization. Bathymetric and sub-bottom profiling surveys conducted in late 2024 identified significant sediment accumulation in the northern and eastern areas of the reservoir, which will be the focus of the initial dredging event. The volume of sediment to be dredged will be dependent upon the cost per cubic yard and other associated project tasks. Post-dredging bathymetric survey data may be requested by the County to indicate changes in elevation. Contractors are encouraged to visit the site at 13140 Charles Street, Charlotte Hall, MD 20622, during normal business hours prior to submitting bids. The dredging activities must coincide with park accessibility and ongoing park activities due to the reservoir's location within a public park.

The estimated project cost is $750,000, with funding provided entirely by Charles County. The project is assigned fiscal year FY 26 with an approved budget status and is funded through General Ledger Account 8050008124.50450. The formal procurement request was created on July 25, 2025, and received final approvals from the Budget Chief (Samantha Chiriaco) on July 25, 2025, and the FAS Director (Jacob Dyer) on July 26, 2025. The dredging initiative is being implemented in conjunction with the upcoming retrofitting construction of the dam to ensure the reservoir maintains its proper storage capacity and operational functionality.

View the file

Other files

File Type Posted
Wheatley_Dam_Dredging_Services.pdf PDF
Wheatley_Dam_Dredging_Services.pdf PDF
Appendix_H_Wetland_PreApp.pdf PDF
Appendix_H_Wetland_PreApp.pdf PDF
Appendix_G_Wheatley_Reservoir_Bathy_Contours_Depths.pdf PDF
Appendix_G_Wheatley_Reservoir_Bathy_Contours_Depths.pdf PDF
Appendix_F_Wheatley_Reservoir_Bathy_Depths.pdf PDF
Appendix_F_Wheatley_Reservoir_Bathy_Depths.pdf PDF
Appendix_E_Wheatley_Reservoir_Bathy_Contours_NAVD88.pdf PDF
Appendix_E_Wheatley_Reservoir_Bathy_Contours_NAVD88.pdf PDF
Appendix_D_Wheatley_Reservoir_Bathy_NAVD88.pdf PDF
Appendix_D_Wheatley_Reservoir_Bathy_NAVD88.pdf PDF
Appendix_C_Bathymetric_Survey_Report.pdf PDF
Appendix_C_Bathymetric_Survey_Report.pdf PDF
Appendix_B_Dredging_Drawings.pdf PDF
Appendix_B_Dredging_Drawings.pdf PDF
Appendix_A_Technical_Specifications_for_Dredging_and_Sediment_Removal.pdf PDF
Appendix_A_Technical_Specifications_for_Dredging_and_Sediment_Removal.pdf PDF
Performance_Labor_Bonds.pdf PDF
Performance_Labor_Bonds.pdf PDF
Sample_Contract_-_Term_&_Renewals_Specified.pdf PDF
Sample_Contract_-_Term_&_Renewals_Specified.pdf PDF
Draft_dredging_RFQ_Bid_Form_revised_12.12.25.docx DOCX document
Draft_dredging_RFQ_Bid_Form_revised_12.12.25.docx DOCX document
Dredging_Contract_Special_Provisions_12.12.25kr.docx DOCX document
Dredging_Contract_Special_Provisions_12.12.25kr.docx DOCX document
Wheatley_Reservoir_Dredging_Procurement_Request_07.15.25_-_signed.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 PURCH 240227

Charles County Government BUDGET - Formal Procurement Request

For procurement exceeding $50,000.00. This form is valid for twelve months from the approval date.

Scope of Work/Specifications must be submitted with this form.

Part A: Request Details

Department: Pulic Works - Facilities

Division: Environmental Resources

Project manager: Keith Roumfort

Item/Project name: Wheatley Reservoir Dredging

Estimated cost: $750,000

Description of work/service/commodity:

mobilization of dredging, dredging reservoir, hauling of sediment, disposal of sediment, and demobilization

Part B: Funding Certification

Fiscal project # (if applicable): 8050008124.50450

Funding: County 100% State % Federal %

Grant % Other %

Fiscal Year: FY 26

Budget Status: Approved Pending Not Funded Other:

General Ledger (G/L) Account(s): 8050008124.50450

Comments:

Wheatley reservoir, located in Gilbert Run Park, has not been dredged since its creation in 1968. With the upcoming retrofitting construction of the dam, it is recommended that a dredging regime be implemented to ensure the reservoir maintains its proper storage capacity.

Part C: F&AS Approvals

Budget Comments:

Budget Chief Approval: Date:

FAS Director Comments:

FAS Director Approval: Date:

Samantha Chiriaco (Jul 25, 2025 10:02:38 EDT) Samantha Chiriaco 07/25/2025

Jacob Dyer (Jul 26, 2025 11:03:19 EDT)

Jacob Dyer 07/26/2025

Wheatley Reservoir Dredging Procurement Request 07.15.25 Final Audit Report 2025-07-26

Created: 2025-07-25 (Eastern Daylight Time)

By: Tayler Thomas (ThomasT@charlescountymd.gov)

Status: Signed

Transaction ID: CBJCHBCAABAAg8oz30u6rDoo01s1jzxAnmRMOx6UHQVq

"Wheatley Reservoir Dredging Procurement Request 07.15.25" History

Document created by Tayler Thomas (ThomasT@charlescountymd.gov)

2025-07-25 - 9:56:46 AM EDT

Document emailed to Samantha Chiriaco (ChiriacoS@charlescountymd.gov) for signature

2025-07-25 - 9:56:50 AM EDT

Email viewed by Samantha Chiriaco (ChiriacoS@charlescountymd.gov)

2025-07-25 - 9:58:41 AM EDT

Document e-signed by Samantha Chiriaco (ChiriacoS@charlescountymd.gov) Signature Date: 2025-07-25 - 10:02:38 AM EDT - Time Source: server

Document emailed to Jacob Dyer (dyerj@charlescountymd.gov) for signature

2025-07-25 - 10:02:40 AM EDT

Email viewed by Jacob Dyer (dyerj@charlescountymd.gov)

2025-07-26 - 11:02:51 AM EDT

Document e-signed by Jacob Dyer (dyerj@charlescountymd.gov) Signature Date: 2025-07-26 - 11:03:19 AM EDT - Time Source: server

Agreement completed.

2025-07-26 - 11:03:19 AM EDT

2025-07-26T15:03:22+0000
Certified by Adobe Acrobat Sign