PLANNING/CONSTRUCTION SERVICES

STATEMENT OF WORK

Repair Tactics/Intel/Mission Planning, Hangar 18

FXSB182423

1. GENERAL

A. The work covered by this Statement of Work (SOW) includes providing all plant, labor, equipment, and materials required to perform planning and construction of the tasks outlined below. The contractor shall be responsible for necessary travel and services required to perform the work.

B. The contract procedures and project objective provide only general direction of what is required and does not constitute a complete explanation of the work involved. The government is relying on the contractor’s expertise in providing planning and construction that meets the intent of the task. The contractor shall work closely with designated government representative to work out details.

C. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

D. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

E. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT Level I Awareness Training is available at the following website: http://jko.jten.mil.

F. The contractor shall develop an OPSEC Plan and provide it to the COR or KO within 10 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AFI 10-701, Operations Security. This plan shall include the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. For the contractor to effectively comply with OPSEC provisions of the contract, the organization will provide the following guidance: (1) Organization’s Critical Information; (2) http://jko.jten.mil/

FXSB182423 SOW 8.6.19 (continued)

Adversaries’ collection threat information as it applies to the organization’s mission and the contract; (3) Operations Security guidance; and (4) Specific OPSEC measures the organization requires (as appropriate).

G. Contractor Manpower Reporting Application (CMRA):

a. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (or your organization) via a secure data collection site.

b. The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil.

H. Work shall comply with local, state, and federal codes and applicable ANG Engineering Technical Letters (ETLs).

I. Materials incorporated into the work shall be new.

J. The contractor is responsible for all applicable permitting (e.g. dig permits).

K. Contractor shall provide shop drawings for all work. The Government will provide, upon request (if available), existing drawings. The Contractor shall treat these existing drawings as “For Official Use Only (FOUO)” and shall either destroy them or return them to the Government once finished. The Contractor shall examine all field conditions and take field measurements to verify all conditions prior to preparing their shop drawings.

2. CONTRACT PROCEDURES

A. This contract shall be awarded on a firm fixed price basis.

B. The government will perform a site visit to show the areas where work is to be completed and answer questions.

C. The contractor shall clean up all construction debris and remove all unused materials.

D. The contractor shall walk the site with the government project manager for a final inspection to verify all tasks are complete and that objectives were achieved.

3. PROJECT OBJECTIVE

Base Bid Items The objective of this project is to modify walls and doors as shown in the attached layouts (Attachment 1) to create a Secure Compartmented Information Facility (SCIF) within the existing Intel/Tactics vault.

A. Special construction requirements exist for this project to meet Top Secret information security standards. Construction shall conform to the following sections of the IC Tech Spec for ICD/ICS 705 (Attachment 2, hereafter “ICS 705”):

a. Walls must meet the requirements of ICS 705 – Ch. 3.C.1 & 3.C.2 http://www.ecmra.mil/

FXSB182423 SOW 8.6.19 (continued)

b. Ceilings must meet the requirements of ICS 705 – Ch. 3.D

c. Doors must meet the requirements of ICS 705 – Ch. 3.E

d. Perimeter penetrations must meet the requirements of ICS 705 – Ch. 3.G

e. Intrusion Detection System must meet the requirements of ICS 705 – Ch. 7

f. Utilities must be surface mounted in accordance with ICS 705 – Ch. 9.D.3

g. During construction, Contractor will be subject to additional security precautions above and beyond typical construction, as described in ICS 705 – Ch. 3.B.

B. Bids shall be based on the following work:

a. Base bid:

i. Demolish wall between rooms 323 and 324. All communications and power cables shall be pulled and stored above ceiling for later use.

ii. Demolish south wall of room 342.

iii. Demolish wall between rooms 325 and 342.

iv. Extend west wall of room 342 south until it meets existing south wall of room 323.

v. Demolish and replace existing north and west walls of room 325, west wall of room 342, to meet the ICS 705 standards above.

vi. Demolish and rebuild walls north, west, and south of rooms 323 and 324 to meet the ICS 705 standards.

vii. Furnish and install metal frame and drywall ceiling in rooms 323, 324, 325, and 342 to meet the ICS 705 standard.

viii. Demolish and replace existing lights in rooms 325 and 342 with 14 ea 2’ x 4’ flat panel LED light fixtures, 4000K color temp, minimum 4000 lumens.

ix. Re-install all power outlets with surface-mounted conduit per the ICS 705.

x. Install cable tray within 18” of ceiling to support up to 30 IT drops in each room.

xi. Install surface mounted conduit and boxes for up to 30 IT drops in each room (cable and termination to be performed by others).

xii. Replace existing ceiling devices (smoke detectors, sprinklers, etc.).

xiii. Repair any disturbed ceiling tile, carpet, etc. as a result of wall modifications.

xiv. Furnish and install steel bar protection meeting ICS 705 within HVAC ducts feeding the construction area.

xv. Furnish and install a Honeywell Vindicator Intrusion Detection System

(IDS) meeting the requirements of ICS 705.

xvi. Furnish and install a complementary Access Control System (ACS) meeting the requirements of ICS 705.

xvii. All finishes to match existing.

4. PERIOD OF PERFORMANCE

The POP shall be 180 days from date of the notice to proceed.

5. Attachments A. Attachment 1 – Layouts B. Attachment 2 – IC Tech Spec for ICD/ICS 705

1101210037N Text Box Existing Layout with Dimensions

1101210037N Text Box Final Layout

1101210037N Polygon

1101210037N Callout work area

Att 2 - ICS 705-1 Technical-Specifications-SCIF-Construction.pdf
Cover
Memo
Page Change
Contents
Chapter 1. Introduction
A. Purpose
B. Applicability
Chapter 2. Risk Management
A. Analytical Risk Management Process
B. Security in Depth (SID)
C. Compartmented Area (CA)
Chapter 3. Fixed Facility SCIF Construction
A. Personnel
B. Construction Security
C. Perimeter Wall Construction Criteria
D. Floor and Ceiling Construction Criteria
E. SCIF Door Criteria
F. SCIF Window Criteria
G. SCIF Perimeter Penetrations Criteria
H. Alarm Response Time Criteria for SCIFs within the U.S.
I. Secure Working Areas (SWA)
J. Temporary Secure Working Area (TSWA)
Figure 1Wall A – Suggested Standard Acoustic Wall Construction
Figure 2Wall B - Suggested Construction for Expanded Metal
Figure 3Wall C – Suggested Construction for Plywood
Figure 4Typical Perimeter Air (Z) Duct Penetration
Chapter 4. SCIFs Outside the U.S. and NOT Under Chief of Mission (COM) Authority
A. General
B. Establishing Construction Criteria Using Threat Ratings
C. Personnel
D. Construction Security Requirements
E. Procurement of Construction Materials
F. Secure Transportation for Construction Material
G. Secure Storage of Construction Material
H. Technical Security
I. Interim Accreditations
Chapter 5. SCIFs Outside the U.S. and Under Chief of Mission Authority
A. Applicability
B. General Guidelines
C. Threat Categories
D. Construction Requirements
E. Personnel
F. Construction Security Requirements
G. Procurement of Construction Materials
H. Secure Transportation for Construction Material
I. Secure Storage of Construction Material
J. Technical Security
K. Interim Accreditations
Chapter 6. Temporary, Airborne, and Shipboard SCIFs
A. Applicability
B. Ground-Based T-SCIFs
C. Permanent and Tactical SCIFS Aboard Aircraft
D. Permanent and Tactical SCIFs on Surface or Subsurface Vessels
Chapter 7. Intrusion Detection Systems (IDS)
A. Specifications and Implementation Requirements
B. IDS Modes of Operation
C. Operations and Maintenance of IDS
D. Installation and Testing of IDS
Chapter 8. Access Control Systems (ACS)
A. SCIF Access Control
B. ACS Administration
C. ACS Physical Protection
D. ACS Recordkeeping
E. Using Closed Circuit Television (CCTV) to Supplement ACS
F. Non-Automated Access Control
Chapter 9. Acoustic Protection
A. Overview
B. Sound Group Ratings
C. Acoustic Testing
D. Construction Guidance for Acoustic Protection
E. Sound Transmission Mitigations
Chapter 10. Portable Electronic Devices with Recording Capabilities and Embedded Technologies (PEDs/RCET)
A. Approved Use of PEDs/RCET in a SCIF
B. Prohibitions
C. PED/RCET Risk Levels
D. Risk Mitigation
Chapter 11. Telecommunications Systems
A. Applicability
B. Unclassified Telephone Systems
C. Unclassified Information Systems1. Unclassified information systems shall be
D. Using Closed Circuit Television (CCTV) to Monitor the SCIF Entry Point(s)
E. Unclassified Wireless Network Technology
F. Environmental Infrastructure Systems
G. Emergency Notification Systems
H. Systems Access
I. Unclassified Cable Control
J. Protected Distribution Systems
K. References
Chapter 12. Management and Operations
A. Purpose
B. SCIF Repository
C. SCIF Management
D. SOPs
E. Changes in Security and Accreditation
F. General
G. Inspections/Reviews
H. Control of Combinations
I. De-Accreditation Guidelines
J. Visitor Access
K. Maintenance
L. IDS and ACS Documentation Requirements
M. Emergency Plan
Chapter 13. Forms and Plans
SCIF Fixed Facility Checklist
SCIF TEMPEST Checklist
SCIF Compartmented Area (CA) Fixed Facility Checklist
SHIPBOARD SCIF Fixed Facility Checklist
SUBMARINE SCIF Fixed Facility Checklist
Aircraft/UAV Checklist
SCIF Co-Use Request and MOA
Construction Security Plan (CSP)

File details come from the government source that posted it.