B08 POP INFORMATION.pdf
PDF 41 KB Posted
- Attached to
- DECONCINNI HVAC Replacement and Install Federal contract opportunity
- Solicitation number
- W91RUS24R0007
About this file
This document provides details regarding a federal contract opportunity for HVAC replacement at the DeConcini Hill radio site. The solicitation seeks a contractor to replace two HVAC units that provide cooling for communications equipment. Work must be completed expeditiously to minimize downtime of the systems that support First Responder and military missions. The performance period allows replacement of one unit at a time to avoid taking the entire site offline, but the goal is to finish replacing both units within 12-15 hours on a single day if powering down is necessary. The solicitation was issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for HVAC replacement services. Responses are due by the date specified in the attached solicitation document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 R-56 Grounding for Additional QA1.pdf | ||
| B08 ADDITIONAL QA1.pdf | ||
| B08 ADDITIONAL QA.pdf | ||
| B08 Marvair_ComPac 01.18_rev.20.pdf | ||
| B08 W91RUS24R0007-03 - Amend 03.pdf | ||
| B08 W91RUS24R0007-03 - Conformed Copy.pdf | ||
| B08 CLARIFICATIONS.pdf | ||
| B08 W91RUS24R0007-02 - Amend 02.pdf | ||
| B08 ANSWERS2.pdf | ||
| B08 DC-HVAC_ANSWERS-1_240119.pdf | ||
| B08 DC_Hill_HVAC_StripMap.pdf | ||
| B08 W91RUS24R0007-01 - Amend 01.pdf | ||
| B08 DC_Hill_RadioVault.pdf | ||
| B08 CommStat3_PDS.pdf | ||
| B08 W91RUS24R0007 - RFQ.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The period of performance will run from the date of delivery of the HVAC units to the final day of the installation and test of both units. This radio site provides communications for First Responders and military missions. Down time must be kept to a minimum. The expectation is to have work completed in one day (within 12-15 hours or sunup to sundown) if both units are being replaced at the same time and the site is powered down. If one HVAC unit can be replaced at a time without turning the repeaters off, we have the liberty to complete the job in two or three days.
File details come from the government source that posted it. Updated .