W91364-16-R-0001_AMENDMENT_02_ACA_Crew.doc

DOC document 26 KB Posted

Attached to
Construct ACA Alert Crew Quarters Federal contract opportunity
Solicitation number
W91364-16-R-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Construct ACA Alert Crew Quarters, newest first.
File Type Posted
W91364-16-C-0001_ACA_Crew_Fac.pdf PDF
W91364-16-R-0001_AMENDMENT_06_ACA_Crew.doc DOC document
Sec_26_0513_MEDIUM-VOLTAGE_CABLES.pdf PDF
Sec_22_1313_SANITARY_SEWERS.pdf PDF
Sec_22_1113_WATER_DISTRIBUTION_PIPING.pdf PDF
Sec_26_0913_POWER_MONITORING.pdf PDF
Sec_26_1200_MEDIUM-VOLTAGE_TRANSFORMERS.pdf PDF
Sec_26_4100_LIGHTNING_PROTECTION.pdf PDF
Sec_27_0538_L-V_CABLE_TRAY.pdf PDF
M1-1.pdf PDF
M5-3.pdf PDF
237400ADD1.pdf PDF
OANG_Addendum_No_1_write_up.pdf PDF
M1-2.pdf PDF
Question_3.docx DOCX document
ES-1-Updated.pdf PDF
Prebid_slides_-_ACA_crew_quarters.ppt PPT presentation
Section_26_3100_PV_Array.pdf PDF
Pre-bid_attendance_list.pdf PDF
Attachment_B_ENVIRONMENTAL_Forms.pdf PDF
Attachment_A_AF_3065_Breakout_Divisions.xls XLS spreadsheet
5_D._Energy_Econ_Analysis.pdf PDF
W91364-16-R-0001_ACA_Crew_Fac.pdf PDF
Vol_2_B3_Submission_12_01_2015.pdf PDF
4_EPACT_Energy_Score_Sheet.pdf PDF
3_LEED_Checklist_AirCrew_TypeB3__30_Dec_2015.pdf PDF
1_ACA_Crew_B-3_Narrative_30_Dec_2015.pdf PDF
ACA_soil_report.pdf PDF
Vol_1_B3_Submission_12-01-2015.pdf PDF
Construct_ACA_Crew_Building_Type_B3_Documents_2015_12_01.pdf PDF
ACA_crew_facility_construction_and_work_areas.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 02 TO

SOLICITATION W91364-16-R-0001

FOR ACA Crew Facility AT

180TH FIGHTER WING

16 Mar 2016

SCOPE OF CHANGES:

A. Questions and Answers

1. Question: In the new specs, all information related to the Photovoltaic Array was omitted. Please send this info.

Answer: See attachment

2. Question: With regards to fire alarms. Need to clarify if it is Horns and strobes or speakers and strobes. Conflict between specs and plans.

Answer: Fire alarm system gets horns and strobes. Mass notification system uses speakers and strobes. For the mass notification system: the building speakers can be used if there is no volume control for the speakers, and amber strobes, or, the contractor can provide combination speaker/strobes.

3. Question: Can Proposals/Pricing be emailed on the 21 March 2016?

Answer: Yes

4. Question: Will you be publishing the sign in sheet from the pre bid meeting?

Answer: See attachment

5. Question: Specification Section 230700 Page 19 Item #3:14 mentions concealed/exposed supply air ductwork. Concealed return and exposed return in un-conditioned spaces to insulate externally. Drawing M1-1 notes 14 and 15 says the supply and return ducts are double wall acoustically lined. Do the supply and return (lined) ducts need to get external insulation also?

Answer: The lined ducts do not need external insulation.

//SIGNED//

Matthew Michael, SMSgt

BASE CONTRACTING OFFICER

File details come from the government source that posted it. Updated .