AMENDMENT 02 TO
SOLICITATION W91364-16-R-0001
FOR ACA Crew Facility AT
180TH FIGHTER WING
16 Mar 2016
SCOPE OF CHANGES:
A. Questions and Answers
1. Question: In the new specs, all information related to the Photovoltaic Array was omitted. Please send this info.
Answer: See attachment
2. Question: With regards to fire alarms. Need to clarify if it is Horns and strobes or speakers and strobes. Conflict between specs and plans.
Answer: Fire alarm system gets horns and strobes. Mass notification system uses speakers and strobes. For the mass notification system: the building speakers can be used if there is no volume control for the speakers, and amber strobes, or, the contractor can provide combination speaker/strobes.
3. Question: Can Proposals/Pricing be emailed on the 21 March 2016?
Answer: Yes
4. Question: Will you be publishing the sign in sheet from the pre bid meeting?
Answer: See attachment
5. Question: Specification Section 230700 Page 19 Item #3:14 mentions concealed/exposed supply air ductwork. Concealed return and exposed return in un-conditioned spaces to insulate externally. Drawing M1-1 notes 14 and 15 says the supply and return ducts are double wall acoustically lined. Do the supply and return (lined) ducts need to get external insulation also?
Answer: The lined ducts do not need external insulation.
//SIGNED//
Matthew Michael, SMSgt
BASE CONTRACTING OFFICER