1 December 2015 URS Project No. 14578137
B3 Specifications Volume 1
Type B Services
WYTD 079032
Construct ACA Alert Crew Quarters Facility
OANG 180th Fighter Wing
Swanton, Ohio
© 2015 URS
277 WEST NATIONWIDE BOULEVARD
COLUMBUS, OHIO 43215-2566
Tel 614.464.4500 Fax 614.464.0588
Architects Engineers Planners
OANG 180th Fighter Wing - Swanton, Ohio URS
WYTD 079032 - Construct ACA Alert Crew Quarters Facility URS Project No. 14578137
01 December 2015 Type B Services – B3 Submission
INDEX AND CERTIFICATION PAGE Page 1 of 2
OHIO AIR NATIONAL GUARD
REPLACE SECURITY FORCES COMPLEX
TH
FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OH
INDEX AND CERTIFICATION PAGE
SPECIFICATION INDEX
DIVISION DESCRIPTION DIVISION DESCRIPTION
DIVISION 1 GENERAL REQUIREMENTS DIVISION 11 EQUIPMENT
DIVISION 2 EXISTING CONDITIONS (NOT USED) DIVISION 12 FURNISHINGS
DIVISION 3 CONCRETE DIVISION 21 FIRE SUPPRESSION
DIVISION 4 MASONRY DIVISION 22 PLUMBING
DIVISION 5 METALS DIVISION 23 HVAC
DIVISION 6 WOOD AND PLASTICS DIVISION 26 ELECTRICAL
DIVISION 7 THERMAL AND MOISTURE PROTECTION DIVISION 27 COMMUNICATIONS
DIVISION 8 DOORS AND WINDOWS DIVISION 28 ELECTRONIC SAFETY &
SECURITY
DIVISION 9 FINISHES DIVISION 31 EARTHWORK
DIVISION 10 SPECIALTIES DIVISION 32 EXTERIOR IMPROVEMENTS
DIVISION 33 UTILITIES (NOT USED)
CERTIFICATIONS
CIVIL
MECHANICAL
ELECTRICAL
INDEX AND CERTIFICATION PAGE Page 2 of 2
ARCHITECTURAL
STRUCTURAL
WYTD 079032 – Construct ACA Alert Crew Quarters Facility URS Project No. 14578137
TABLE OF CONTENTS 00 0110 - Page 1 of 6
SECTION 00 0110
TABLE OF CONTENTS
VOLUME 1
---- Index and Certification Page
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 01 – GENERAL REQUIREMENTS
01 0000 General Requirements
----- Form 77 - Contractor Information for 180 th Fighter Wing Base Projects
01 0010 Affirmative Procurement
----- Affirmative Procurement Reporting Form
01 0100 Summary of Work
01 0390 Coordination and Meetings
01 0450 Welding, Cutting, and Patching
01 0500 Field Engineering
01 0600 Safety Policies and Procedures
01 0900 Reference Standards
01 3000 Submittals
----- Material Approval Submittal Form
----- Schedule of Material Submittals
01 3100 Construction Progress Schedules
01 3900 Request For Information
01 4010 Hazardous Material Usage
----- Contractor Hazardous Material Identification Form
01 4100 Testing Laboratory Services
01 4510 Contractor Quality Control
----- Statement of Special Inspections of Steel Construction
----- Statement of Special Inspections of Concrete Construction
----- Statement of Special Inspections of Masonry Construction
----- Statement of Special Inspections for Soils
01 5000 Construction Facilities and Temporary Controls
01 5100 Temporary Utilities
01 5200 Construction Waste Management and Cleanup
01 5610 Erosion and Sediment Control
01 5900 Field Offices and Sheds
01 6000 Material and Equipment
01 6400 Manufacturers’ Services
----- Manufacturer’s Certificate of Proper Installation
01 6500 Starting of Systems
01 7000 Project Closeout
01 7100 Cleaning
01 7200 Project Record Documents
01 7300 Operation and Maintenance Data
01 7400 Warranties
01 8000 Environmental Requirements and References
TABLE OF CONTENTS 00 0110 - Page 2 of 6
----- Contractor ODS Information
01 8113 Sustainable Design Requirements
01 9113 General Commissioning Requirements
----- Appendix A: Example Commissioning Plan
SPECIFICATIONS GROUP
Facility Construction Subgroup
DIVISION 03 - CONCRETE
03 3000 Cast-In-Place Concrete
03 4100 Structural Precast Concrete Floor Planks
DIVISION 04 – MASONRY
04 2000 Unit Masonry
DIVISION 05 - METALS
05 1200 Structural Steel Framing
05 2100 Steel Joists Framing
05 3100 Steel Decking
05 5000 Metal Fabrications – Service Platform System
05 5150 Fixed Access Ladder
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 Rough Carpentry
06 4023 Interior Architectural Woodwork
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 Thermal Insulation
07 2726 Fluid-Applied Membrane Air Barriers
07 4113 Metal Standing Seam Roof Panel
07 6200 Sheet Metal Flashing and Trim
07 7233 Roof Hatch
07 8413 Penetration Firestopping
07 8446 Fire-Resistive Joint Systems
07 9200 Joint Sealants
DIVISION 08 – OPENINGS
08 1113 Steel Frames
08 1416 Flush Wood Doors
08 3113 Access Doors and Frames
08 3953 Blast-Resistant Doors and Frames
08 5113 Aluminum Windows
08 7100 Door Hardware
08 8853 Security Glazing
08 9000 Louvers and Vents
TABLE OF CONTENTS 00 0110 - Page 3 of 6
DIVISION 09 - FINISHES
09 2216 Non-Structural Metal Framing
09 2900 Gypsum Board
09 3000 Tiling
09 5113 Acoustical Panel Ceilings
09 6500 Resilient Flooring
09 6513 Resilient Wall Base and Accessories
09 6566 Resilient Athletic Flooring
09 6813 Tile Carpeting
09 9100 Painting
DIVISION 10 - SPECIALTIES
10 1100 Visual Display Surfaces
10 1400 Signage
10 2113 Phenolic CoreToilet Compartments
10 2800 Toilet and Bath Accessories
10 4413 Fire Extinguisher Cabinets
10 5100 Metal Lockers
DIVISION 12 - FURNISHINGS
12 2113 Horizontal Louver Blinds
VOLUME 2
Facility Services Subgroup
DIVISION 21 – FIRE SUPPRESSION
21 0517 Sleeves and Sleeve Seals for Fire Suppression
21 0518 Escutcheons for Fire-Suppression
21 0553 Identification for Fire-Suppression Piping and Equipment
21 1313 Wet-Pipe Sprinkler Systems
DIVISION 22 - PLUMBING
22 0501 Common Work Results for Plumbing
22 0507 Excavation and Backfill
22 0523 General-Duty Valves for Plumbing Piping
22 0529 Hangers and Supports for Plumbing Piping and Equipment
22 0553 Identification for Plumbing Piping and Equipment
22 0561 Preparation of Plumbing Systems
22 0700 Plumbing Insulation
22 0800 Plumbing Systems Commissioning Requirements
22 1113 Facility Water Distribution Piping
22 1116 Domestic Water Piping
22 1313 Facility Sanitary Sewers
22 1316 Building Sanitary Drainage
22 2000 Facility Natural Gas System
22 3400 Fuel-Fired, Domestic-Water Heaters
22 3500 Solar Water Heaters
TABLE OF CONTENTS 00 0110 - Page 4 of 6
22 4000 Plumbing Fixtures
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
23 0500 Common Work Results For HVAC
23 0513 Motors
23 0514 Variable Frequency Drives for HVAC Equipment
23 0519 Meters and Gauges
23 0523 Valves
23 0529 Hangers and Supports
23 0548 Mechanical Vibration and Seismic Controls
23 0553 Mechanical Identification
23 0593 Testing, Adjusting, and Balancing
23 0700 Mechanical Insulation
23 0800 Mechanical Systems Commissioning Requirements
----- Appendix A – Pre-Functional Test
----- Appendix B – Functional Performance Test
23 0900 HVAC Instrumentation and Control
23 2113 Hydronic Piping
23 2123 Hydronic Pumps
23 2300 Refrigerant Piping
23 2500 HVAC Water Treatment
23 3113 Metal Ducts
23 3300 Duct Accessories
23 3423 Power Ventilators
23 3700 Air Terminal Units
23 3713 Diffusers, Registers, and Grilles
23 5100 Breechings, Chimneys, and Stacks
23 5216 Condensing Boilers
23 7400 Package Rooftop Unit (RTU)
23 8126 Split-System Air-Conditioning Units
23 8239 Cabinet Unit Heaters
23 8240 Propeller Unit Heaters
DIVISION 26 - ELECTRICAL
26 0505 Basic Electrical Requirements
26 0510 Basic Electrical Materials and Methods
26 0513 Medium-Voltage Cables
26 0519 Wires, Cables, and Connectors
26 0526 Grounding
26 0529 Supporting Devices
26 0533 Raceway
26 0543 Manholes, Handholes, and Underground Pull Boxes
26 0553 Electrical Identification
26 0800 Electrical Systems Commissioning Requirements
26 0900 Control Devices
26 0913 Electrical Power Monitoring and Control
26 0923 Lighting Control Devices
26 1200 Medium Voltage Transformers
26 2416 Panelboards
TABLE OF CONTENTS 00 0110 - Page 5 of 6
26 2716 Cabinets, Boxes, and Fittings
26 2726 Wiring Devices
26 2800 Circuit and Motor Disconnects
26 2816 Enclosed Switches and Circuit Breakers
26 2900 Motor Controller, Contactors, Push Buttons, Selector Switches, Indicating Lights and
Relays
26 3100 Photovoltaic / Grid Tie Inverter System
26 3213 Engine-Generator Systems
26 3600 Transfer Switches
26 4100 Lightning Protection Systems
26 4300 Transient Voltage Suppression
26 5000 Lighting Fixtures
26 5200 Emergency Lighting
DIVISION 27 - COMMUNICATIONS
27 0000 Structured Cabling Systems
27 0538 Low-Voltage Cable Tray
27 1100 Antenna Tower System
27 2500 Audio/Visual System
27 2600 Paging System
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 1300 Access Control System
28 3100 Fire Alarm System
28 3176 Mass Notification System
Site and Infrastructure Subgroup
DIVISION 31 - EARTHWORK
31 1000 Site Clearing
31 2000 Earth Moving
31 2319 Dewatering
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 1216 Asphalt Paving
32 1313 Concrete Paving
32 1373 Concrete Paving Joint Sealants
32 1724 Paint, Traffic and Airfield Marking, Waterborne
32 3113 Chain Link Fences and Gates
32 9200 Turf and Grasses
END OF TABLE OF CONTENTS
TABLE OF CONTENTS 00 0110 - Page 6 of 6
This page intentionally left blank.
GENERAL REQUIREMENTS 010000 - Page 1 of 20
SECTION 01 0000
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SCOPE
A. Project provides for furnishing all plant, labor, material, equipment and appliances to construct Security Forces Complex at Toledo Air National Guard Base, Swanton, Ohio, as described herein and shown on the construction drawings.
B. The Contractor will be held responsible for all requirements described in the Contract Documents. All work, including that of subcontractors, shall be completed in accordance with the Contract Documents. Failure to be familiar with the requirements of the Contract will not relieve the Contractor of responsibility to comply.
C. The organization of the specifications into divisions, sections, and articles, and the arrangement of the Drawings shall not control the Contractor in dividing the work among subcontractor or in establishing the extent of the work to be performed by any trade.
1.2 ABBREVIATIONS
A. The following are common abbreviations used in the Specifications:
A/E Architect and Design Engineers EC Electrical Contractor
BCE Base Civil Engineer FPT Functional Performance Test
CxA Commissioning Authority GC General Contractor
CC Controls Contractor MC Mechanical Contractor
CM Construction Manager (as constructor) PFT Pre-functional Tests
COR Contracting Officer’s Representative PM Project Manager
Cx Commissioning Subs Subcontractors to General
Cx Plan Commissioning Plan document TAB Test and Balance Contractor
1.3 WORK SCHEDULING
A. Normal base work hours for the Contractor will be between the hours of 7:45 am through 4:30 pm, excluding Saturdays, Sundays, and Federal Holidays, unless otherwise noted. If the Contractor desires to work during periods other than above, Contractor must notify the Contracting Officer 5 working days in advance of Contractor's intention to work during other periods to allow assignment of additional inspection forces and for notification of fire, security and safety. When the Contracting Officer determines that they are reasonably available, Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount. (Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this Project).
GENERAL REQUIREMENTS 010000 - Page 2 of 20
B. The following Federal legal Holidays are observed by this base:
New Year's Day 1 January Martin Luther's King's Birthday Third Monday of January President's Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
C. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday.
D. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more) commencement of any warranty work, and upon completion of warranty work, the Contractor must notify the Contracting Officer or the Contracting Officer Representative (COR). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the COR is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The above precautions are to ensure construction inspection and recording of work proceedings.
1.4 ENTRY TO BASE/ACCESS TO SITE
A. Toledo Air National Guard Base is a closed base, pursuant to Sec 21, Internal Security Act of 1950, 50 U.S.C. 797 and, as such, only those persons granted permission may enter. It is, therefore, required that control be exercised over Contractor personnel while working on the base. To maintain this control, a listing of all Contractor personnel who will be working under the Contract, must be submitted to the Contracting Officer 14 days prior to the start of work under the Contract. The listing shall include, but not limited to: Contract number, project number, employee name, and the estimated starting and ending date of each employee.
Subsequent listings of all additions or deletions will be submitted as employees are hired or released.
1. Submit list of personnel on SFS Form 77 (attached). Personnel shall be issued a badge.
B. During construction, the Contractor shall permit base personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.
C. In the event of a declared National Emergency, the Contracting Officer may be required to stop work on this Contract for security reasons. The Contractor shall ensure the Contracting Officer has a current "Off Duty" contact name and telephone number at all times to facilitate notification.
D. The Contractor shall be responsible for compliance with all regulations and orders of the Commanding Officer of the Military Installation, respecting identification of employees, movements on installation, parking, truck entry, and all other military regulations, which may affect the work.
GENERAL REQUIREMENTS 010000 - Page 3 of 20
E. The work under this Contract will be performed at an operating Military Installation with consequent restrictions on entry and movement of nonmilitary personnel and equipment. The Military Installation may have specific requirements, which will be identified at the Preconstruction Conference.
F. The Contractor shall inform all personnel working under its jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area, excluding direct haul and access routes, contracting and COR and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only.
Persons in violation of the above may be apprehended and turned over to the appropriate authorities.
1.5 UNAUTHORIZED PERSONNEL
A. The Contractor shall inform all personnel (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area excluding, direct haul and access routes, Contracting and Civil Engineering offices and point of supply and storage, is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
1.6 INSPECTION OF SITE
A. The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades. Reference Contract Clauses FAR 52.236-3, "Site Investigation and Conditions Affecting the Work," and FAR 52.236-8, "Other Contracts."
B. It is recommended that prospective bidders visit the premises and thoroughly familiarize themselves with the details of the work and working conditions. It is the responsibility of all offerors to have compared the premises and the site with the Specifications and Drawings, and to have satisfied themselves as to all conditions of the premises, the existing obstructions, the actual elevations, and any other conditions affecting the execution and completion of the work prior to submission of the Proposal. Reference Contract Clause FAR 52.236-3, "Site Investigation and Conditions Affecting the Work."
C. No allowances or extra construction on behalf of any Contractor will be permitted subsequently by reason of error or oversight on the part of the subcontractor, or on account of interferences by the activities of the Contracting Officer or others. Reference Contract Clause FAR 52.236-3, "Site Investigation and Conditions Affecting the Work."
D. All dimensions shown on the Drawings are based on "as-built" record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and Contract Drawings. The Contractor is responsible for verifying all dimensions and for reporting to the Contracting Officer any discrepancies that may affect performance of the work represented by Contract Drawings and specifications. Reference Contract Clause DFARS 252.236-7001 "Contract Drawings, Maps, and Specifications."
1.7 CORRELATION OF DRAWINGS, SPECIFICATIONS AND CONTRACTS
A. The Specifications, Contract and the accompanying Drawings are intended to describe and provide for a complete, new and usable facility. They are intended to be cooperative and what is called for by one shall be as binding as if called for by all. The Contractor will understand that
GENERAL REQUIREMENTS 010000 - Page 4 of 20 the work herein described shall be complete in every detail, notwithstanding every item necessarily involved is not particularly mentioned, and the Contractor shall be responsible to provide all labor and material for the entire completion of the work intended. Should any error or inconsistency appear in the Drawings or Specifications, the Contractor, before proceeding with the work, shall make mention of same to the Contracting Officer for proper adjustment, and in no case shall the work proceed with uncertainty. Reference Contract Clause DFARS 252.236-7001, "Contract Drawings, Maps and Specifications."
1.8 REPORT OF ERROR AND DISCREPANCIES
A. The Contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the building before fabrication and installation.
B. The Contractor shall bear all costs in replacing all materials and labor due to not observing the above paragraph and such replaced materials shall meet the approval of the Contracting Officer.
C. The Contractor shall promptly notify the Contracting Officer in writing of any discrepancies.
D. Reference contract clauses FAR 52.236-21, "Specifications and Drawings for Construction."
FAR 52.246-12 "Inspection of Construction," and DFARS 252.236-7001, "Contract Drawings, Maps and Specifications."
E. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.
1.9 DIVISION OF WORK
A. The various divisions of the specifications shall not be considered as negotiations of the material and labor involved. The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, a particular trade or Subcontractor must perform that work included in any one division.
B. Any item mentioned under any division heading must be supplied even though it is not specified under the heading for the respective work, but is shown on the Drawings. No claims for extras arising out of real or alleged error in such arrangement or order of the various divisions will be given consideration.
C. The organization of the specifications into divisions, sections, and articles, and the arrangement of the Drawings shall not control the Contractor in dividing the work among Subcontractor or in establishing the extent of the work to be performed by any trade.
D. Reference Contract clause FAR 52.236-21, "Specifications and Drawings for Construction."
E. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.
1.10 METHOD OF CARRYING ON THE WORK
A. All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged
GENERAL REQUIREMENTS 010000 - Page 5 of 20 before starting. Reference Contract Clause FAR 52.236-15, "Schedules for Construction Contracts."
B. Activities in the vicinity of this Project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer and schedule construction activities. Reference Contract Clause FAR 52.236-8, "Other Contracts."
1.11 STANDARDS OF MANUFACTURE
A. All recognized regulatory/code standards shall be the latest published edition prior to the date of release for bid/proposal of the Contract Documents.
B. For purpose of establishing the standard of construction and the requirements to be met in the work of all divisions, the Drawings and these Specifications are based on the use of products hereinafter specified, adapted to the installation as required to meet the condition.
C. Where brand names are shown, these names are intended to describe a quality of product, and in no way are intended to limit products of equal quality. Therefore, products of other manufacturers may be employed for this work provided they are equivalent materials and construction and equally adaptable to the conditions as approved by the Contracting Officer.
Reference Contract Clause FAR 52.236-5, "Materials and Workmanship."
1.12 MEANING OF APPROVED, DIRECTED, ETC.
A. "Approved," "Directed," "Required," "Applicable," or words of like or similar effect, when used in the Specifications shall be interpreted to mean "Approved By," "Directed By," etc., the Contracting Officer unless otherwise specifically stipulated.
1.13 MISPLACED MATERIALS
A. Any material that is deposited elsewhere than areas designated as approved by the Contracting Officer shall be rehandled and deposited where directed. No payment will be made for rehandling such material. The Contracting Officer will notify Contractor of any noncompliance with the foregoing provisions.
1.14 COMPLIANCE WITH CODES AND REGULATIONS
A. All work shall be done in accordance with the applicable codes and/or ordinances in force at the time of construction. It is the Contractor's responsibility to ensure that where EPA, DEQ or other such regulations control the removal, handling, installation or disposal of materials, they shall be strictly adhered to whether or not specifically referenced in the construction documents.
B. Contractor shall have data sheets available at the site on any materials used to comply with OSHA and EPA. Reference Contract Clause FAR 52.223-3, "Hazardous Material Identification and Material Safety Data."
1.15 MATERIAL TESTING BY NATIONAL LABORATORIES
A. Electrical materials and equipment shall be new and bear the UL label or be listed in UL Electrical Construction Materials Directory or Electrical Appliance and Utilization Equipment Directory, wherever standards have been established by the agency.
GENERAL REQUIREMENTS 010000 - Page 6 of 20
B. The Contractor shall submit proof that the material or equipment, which the Contractor proposes to furnish under this Specification, conforms to the standards of Underwriters' Laboratories. The label of Underwriters Laboratories (UL) shall be accepted as conforming to this requirement.
C. In lieu of the label, the Contractor may submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.
1.16 SUBMITTALS
A. Shop Drawings and Product Data: The Contractor shall furnish submittals in the form of manufacturer's brochures, pamphlets, or written specifications on all items to be installed unless specifically directed otherwise by these Specifications or by the Contracting Officer. Reference Contract Clause FAR 52.236-5, "Material and Workmanship," FAR 52.225-5, "Buy American Act-Construction Materials," FAR 52.223-3, "Hazardous Material Identification and Material Safety Data," and DFAR 252.227-7033, "Rights in Shop Drawings."
B. Approval of Materials: Prior to the purchase of material, the Contractor shall submit to the Contracting Officer, for material approval/disapproval, brochures and technical literature covering, in detail, the materials the Contractor proposes to supply. This shall include the specific catalog and model specification number designations. Submittals shall demonstrate that the item conforms to all of the requirements. No unapproved or disapproved materials shall be used. Submittals shall be made for the items listed on AF Form 66, Schedule of Material Submittals, or equivalent. Reference Contract Clause FAR 52.236-5, "Material and Workmanship."
1.17 CONSTRUCTION SCHEDULING, WORK PROGRESS AND PREPARATION OF
PROGRESS SCHEDULES AND REPORTS
A. The Contractor shall prepare work progress schedules on AF Form 3064 "Contract Progress Schedule," AF Form 3065, "Contract Progress Report," and a CPM Schedule. For construction projects in excess of $1 million, Microsoft Project, latest version, or acceptable substitute form is also required. These schedules are to be submitted to the Contracting Officer for approval, in the number of copies as directed, prior to start of construction. The schedule will show the order in which the Contractor proposes to perform the work, the dates on which the Contractor contemplates starting and completing the various divisions and salient features of the work.
Reference Contract Clause FAR 52.236-15, "Schedules for Construction Contracts." The work shall be scheduled so that upon the start of construction, work progresses in a continuous and diligent manner. A schedule that does not reflect steady and reasonable progress throughout the construction period will be rejected. The schedule shall include a line item for rough inspections by Government personnel as outlined in the various sections of the Specifications or on the Drawings. A rough inspection is required on all installed systems prior to sealing off or closing in a wall, pipe chase, suspended ceiling system etc. These systems include by not limited to:
domestic and heating water lines, communication and electric runs, all insulation material to be covered by other material (GWB, wood panel etc), duct runs, ceiling suspension systems, raised flooring, fire detection/protection/suppression systems etc. A second or finish inspection will be conducted after these systems are "hidden" to ensure the quality of the finished product. The finish inspection does not constitute the final Project inspection accomplished at Project
GENERAL REQUIREMENTS 010000 - Page 7 of 20 completion. The Contractor shall request these inspections, through the Contracting Officer at least 5 workdays prior to the desired inspection date.
B. A weekly meeting may be held between the Contractor, COR and Contracting Officer, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to specific work elements of a project, the Contractor shall confer with the COR and agree on a sequence of procedures and means of access to premise and buildings; space for storage of materials and equipment; delivery of materials and use of approaches, use of corridors, stairways and similar means of passage.
Weekly progress reports are to be submitted on AF Form 3065 "Contract Progress Report," or acceptable substitute form, are required for both the Contractor and the Contracting Officer's Representative (COR) covering the period from notice to proceed through final inspection. If there are possible deviations from the original plan, those are to be noted and approved by the Contracting Officer before work changes are implemented. Reference Contract Clause FAR 52.236-15, "Schedules for Construction Contracts."
C. The Contract Schedule will include the final 5% of the contract for closeout. Closeout retainage will include O&M Data, manufacturer's services (i.e., training for equipment use), and warranties.
1.18 SAFETY ASSURANCE
A. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos;
and/or disposal and removal of asbestos, shall also comply with the requirement of 40 CFR, Part 61, Subparts A and B. ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.
B. Contractor Responsibility. The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any action on the part of the Contractor, the Contractor's employees or Subcontractor, which result in illness, injury or death.
C. Where an employee can fall more than 6 feet, a fall protection system must be used; 29 CFR
1926.500 stipulates where this occurs and the different types of fall arrest systems.
D. When the Contractor is working in buildings that are occupied by GOVERNMENT personnel, the Contractor must provide Material Safety Data Sheets (MSDS) to the Contracting Officer before starting work.
E. All references to protection of the site and adjacent buildings when trenching, shall include protection of all employees also.
F. Inspections, Tests and Reports. The required inspections, tests and reports made by the Contractor, Subcontractor, specially trained technicians, equipment manufacturers and other as required, shall be at the Contractor's expense.
GENERAL REQUIREMENTS 010000 - Page 8 of 20
G. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the Contractor in the execution of work shall comply with applicable regulations.
H. Traffic Control Devices. The Contractor shall comply with the recommendations contained in Part 6 of the U.S. Department of Transportation, Federal Highway Administrations "Manual on Uniform Traffic Control Devices (D6.-1978) to ensure proper warnings to motorists and adequate traffic control. The Contractor shall provide all warning lights, barricades and other traffic control devices and signs.
1.19 INSPECTIONS AND TESTS
A. Inspections and tests are for the sole benefit of the Government and shall not relieve the Contractor of the responsibility of providing quality control measures to ensure that the work strictly complies with the Contract requirements. No inspection or test by the Government shall be construed as constituting or implying acceptance. Reference Contract Clause FAR 52.246- 12, "Inspection of Construction."
1.20 QUALITY CONTROL/TESTS
A. Where work is specified to be in conformity with Standard Specifications of the American Society for Testing Materials (ASTM), or with Federal Specifications or with specifications of well-known recognized technical and trade organizations, but no tests are specifically stipulated in connection herewith, the Contractor shall furnish and pay for any tests or certifications required by the Contracting Officer to show that the proposed materials meet with the applicable requirements.
B. The Contractor shall submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.
C. Wherever testing or analysis of material is required, such testing unless otherwise noted will be made at the Contractor's expense.
D. Subsequent testing of those materials which fail to meet specifications will be accomplished by the Contractor at no cost to the Government.
E. Contractor Quality Control (CQC) Program: The Contractor shall provide and maintain an effective quality control program in accordance with the Contract. Within 10 days of the Award of the Contract, the Contractor shall provide three copies of the Project CQC plan to the Contracting Officer. This document, as a minimum, shall include name and address of the independent testing agency and the responsible principal with the firm; a summary of QC tests required by the specification and to be provided by the testing agency; and typical daily reports forms to be used for this Project. The plan shall also indicate organizational procedures to immediately notify the Contracting Officer or COR of test results in noncompliance with the specification and recommendations on correction. The testing agency must be an independent company and not owned or partially owned by the Contractor or any relation or employee of the Contractor.
F. Samples used for testing shall be selected as specified for the various tests elsewhere in the specifications but in every case the method of selecting samples and the location for selection shall be as approved by the Contracting Officer.
GENERAL REQUIREMENTS 010000 - Page 9 of 20
G. Tests shall be made in accordance with the specified testing procedures and/or methods and otherwise as required to provide compliance with all Contract requirements. Tests shall be made by independent, commercial testing laboratories approved in writing by the Contracting Officer.
H. Results of all tests shall be recorded on certified test reports of the commercial testing laboratories. Reports shall include a statement that the materials tested do or do not meet the requirements of the Contract specifications. Six copies of all reports shall be forwarded directly to the Contracting Officer for approval within 5 days of the actual performance of the test. The testing agency shall immediately notify (verbally) the Contracting Officer of any tests, which indicate failure to meet the Contract requirements.
I. Any item, for which test reports show failure to meet all Contract requirements, shall be retested as often as required to show full compliance with Contract requirements, at the Contractor's expense.
J. Contractor will provide an emergencies plan, with names of personnel to accomplish the repairs in the event of utility and/or communications emergencies.
1.21 KEYS
A. The Contractor shall be responsible for any Government-owned keys that have been issued to the Contractor for access to facilities or areas pertinent to this Contract.
B. Upon completion of the work in an area, or upon request of the Contracting Officer, the key or keys relevant to the area shall be returned immediately. Keys shall be returned prior to final task order payments.
C. Should the Contractor Lose a Key: The Contractor shall notify the Contracting Officer, immediately and in writing, but not later than 1 working day after the Contractor is aware of the loss. Should the key not be found before final acceptance, the final Contract payment shall be reduced by the replacement cost for each key not returned and, if required by the Contracting Officer, any re-keying costs and cost of any other damages suffered by the Government.
1.22 WARRANTY
A. In addition to the specific guarantees required by the specifications for certain portions of the work to be performed under this Contract, the Contractor shall furnish a written warranty for all of the work to be performed under this Contract, against defects in materials or workmanship for a period of 1 year from the date of final acceptance of the completed work by the Government.
B. All work including workmanship, material, and equipment (other than Government furnished equipment) shall be warranted for the full period of standard manufacturer's warranty, but in no case shall be warranted for a period of less than 1 year upon notice from the Contracting Officer of any failure during this warranty period, the part or parts shall be replaced promptly with new parts by and at the expense of the Contractor. Whenever the manufacturer of a piece of equipment supplied by the Contractor customarily provides a warranty covering the equipment, the Contractor shall promptly turn over such to the Contracting Officer.
GENERAL REQUIREMENTS 010000 - Page 10 of 20
C. Upon completion, the Contractor shall provide the Contracting Officer with four bound sets containing maintenance, repair and operating instructions and parts lists for each piece of installed equipment.
D. Reference Contract Clause FAR 52.246-12, "Inspection of Construction" and FAR 52.246-21, "Warranty of Construction."
1.23 CUTTING AND REPAIRING
A. Unless otherwise specified hereinafter, the Contractor shall do all necessary cutting, drilling, fitting and patching of work and corresponding work that may be required to make several parts come together and fit it to receive, or be received, by work of other trades shown upon, or reasonably implied, by the Drawings and Specifications for the completed Project. Reference Contract Clause FAR 52.246-12, "Inspection of Construction."
B. The Contractor shall be held responsible for all cutting, replacement, and repairing of work that is due to faulty workmanship and which is not specifically covered by Specifications for trades which are affected. The Contractor will also be held responsible for providing, without extra cost to the Government, any small incidental items which are not specifically mentioned in trade specifications, but which are necessary to complete the work in accordance with the Drawings, and under the general understanding that the work when completed, shall be a finished and workmanlike job. Reference Contract Clause FAR 52.236-5, "Material and Workmanship" and FAR 52.246-12, "Inspection of Construction."
1.24 SITE CLEANUP
A. The Contractor shall maintain the construction site in as clean and orderly condition as possible.
All refuse and/or salvage material shall be gathered and disposed of periodically to maintain the site in this condition. All roadways, taxiways and ramp areas within the work area, or used by the Contractor, shall be swept and vacuumed daily to assure safe operation of aircraft. The cleaning operation shall be accomplished with self-propelled sweepers equipped with pick-up devices. The method of cleaning and equipment employed shall be subject to the approval of the Contracting Officer. Reference Contract Clause FAR 52.235-12, "Cleaning Up."
B. During and after periods of rain, this construction site may have a very high water table and/or areas of standing surface water. Dewatering techniques are a Contractor's option; however, the Contracting Officer shall approve the method prior to start of work.
C. Following completion of the work, the Contractor shall clean the entire area from any debris and/or excess of misplaced material due to the Contractor's operation and obtain Contracting Officer's approval of this finished work. (Reference Contract Clause FAR 52.246-12, entitled "Inspection of Construction" and FAR 52.236-12, "Cleaning Up.")
1.25 LAYOUT AND GRADES
A. All lines and grade work not presently established at the site shall be laid out by the Contractor in accordance with the Drawings and Specifications. The Contractor shall maintain all established boundaries and benchmarks and replace as directed any which are destroyed or disturbed. Reference Contract Clause FAR 52.236-17, "Layout of Work."
GENERAL REQUIREMENTS 010000 - Page 11 of 20
B. The Contractor shall engage a Professional Engineer or Registered Land Surveyor, licensed to practice in the State of Ohio, to properly establish all locations, grades, elevations, dimensions, joints, etc., necessary to the proper location of all items of work included in this Contract. All such items shall be established in relation to the benchmark and control points noted on the Drawings.
C. Prior to acceptance of the facility and at such times as directed by the Contracting Officer, the Contractor shall thoroughly clean all exposed surfaces of the building where work under this Contract was completed.
D. All protective coatings, except lacquers, shall be removed from finish surfaces and the finish surfaces shall be washed and cleaned. Contractor shall be held responsible for all damaged materials, and at completion, shall replace, at the Contractor's own expense, all such damaged materials.
E. Reference Contract Clause FAR 52.236-21, "Cleaning Up," and FAR 52.246-12, "Inspection of Construction."
1.26 REFUSE AND SALVAGE MATERIALS
A. All refuse, debris, and construction waste shall be legally disposed of off base at the Contractor's expense. (Reference FAR 52.236-12 "Cleaning Up."). Accumulations of refuse on the site will not be permitted.
B. All salvage property removed and not reinstalled under this Contract shall be returned to the Government at a place on base designated by the Contracting Officer, or properly disposed of when directed by the Government.
C. Nonhazardous solid waste must be diverted to recycling, through appropriate means available to the Contractor, if such diversion is less than or equal to the equivalent cost of landfill or incineration.
D. Prior to Contract closeout the Contractor must supply a report, including the following:
1. Amount (in tons) of nonhazardous solid waste, including construction and demolition debris, that is composted, mulched, recycled, reused, donated or otherwise diverted from a disposal facility.
2. Amount (in tons) of solid waste (including construction and demolition debris) transferred to a disposal facility (landfill).
1.27 STORAGE
A. No secure storage space will be provided by the Government. The Government will not be responsible for property belonging to, or under the present control of the Contractor. The Contracting Officer, or COR, will designate an unsecured, open area for storage of construction equipment and materials during the period covered by this Contract. Reference Contract Clause FAR 52.236-10, "Operations and Storage Areas."
B. The Contractor shall construct such temporary sheds, as may be required, for the use of workmen and as required for tool cribs and storage of all work under this Contract. Temporary sheds shall be confined to the space assigned by the Contracting Officer, or COR. Sheds shall be of approved construction and wood floors, lighting and heat shall be provided in all parts
GENERAL REQUIREMENTS 010000 - Page 12 of 20 used by workmen. Exterior of sheds shall be painted, all parts maintained in good condition throughout the life of the Contract, and at completion, all parts shall be removed and the premises cleaned up. Reference Contract Clauses FAR 52.236-10, "Operations and Storage Areas" and FAR 52.236-12, "Cleaning Up."
C. All materials, stored or otherwise, used during the period covered by this Contract, shall be protected by such means as is acceptable to the COR. Protection shall include padlocks, fencing, or other means.
1.28 TEMPORARY FIELD OFFICES
A. As soon as practicable after award of Contract, and until final completion of the work, Contractor shall provide, maintain and later remove suitable temporary office(s). All field offices shall be in good repair, painted on the exterior, provided with adequate heating, lighting and maintained in a clean and sanitary condition at all times. Reference Contract Clause FAR 52.236-10, "Operations and Storage Areas."
B. The Contractor is reminded that smoking in buildings on a Government facility is prohibited. A smoking area for employees, away from the main entrance of a building, must be provided.
1.29 TEMPORARY TOILET FACILITIES
A. The Contractor must provide all temporary toilet facilities. The temporary toilet facilities shall meet the requirements of health authorities having jurisdiction and shall be kept clean and in a sanitary condition at all times.
1.30 TELEPHONE AND COMMUNICATIONS SECURITY MONITORING
A. The Contractor shall provide telephone service at the field office for personal and Subcontractor use. Arrangements with the telephone company will be the responsibility of the Contractor, as well as all charges for installation, services and removal.
B. All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian Contractor personnel are advised any time they place a call to, or receive a call from, an USAF organization, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.
1.31 UTILITIES
A. The Contracting Officer has determined that Government- operated utilities are not adequate and will not be furnished to the Contractor without charge where existing outlets are available.
The Contractor may use reasonable amounts of specified utilities for this construction operation without charge. The Contractor is responsible for installing temporary service outlets, as necessary, and charges will be made in accordance with the clause entitled "Availability and Use of Utility Services, FAR Clause 52.236-14. Any expense incurred to gain access to these utilities (temporary tap-ins, etc.,) shall be the responsibility of the Contractor and all utilities
GENERAL REQUIREMENTS 010000 - Page 13 of 20 shall be returned to their original configurations at the end of the contracts. No alterations to existing utilities shall be accomplished without the written permission of the Contracting Officer. The following utilities will be made available: electricity and water.
B. Contractor shall be responsible for gas charges once gas service is established until accepted by the Government.
C. See SECTION 01510 - TEMPORARY UTILITIES, for additional details.
1.32 UTILITY INTERRUPTIONS
A. All utility shutdowns require the prior approval of the Contracting Officer. Request for utility shutdown shall be made in writing at least 4 weeks prior to the expected date of implementation. As soon as actual shutdown date is known, the Contractor shall notify the Contracting Officer, in writing, requesting approval at least 8 work days prior to requested shutdown.
B. The Contractor's progress schedule shall include preliminary listing of all proposed shutdown dates. Every effort shall be made to make all shutdowns as brief as possible, and as limited in extent as possible.
C. Major utility shutdowns shall occur on weekends and after normal working hours at no additional cost to Government.
1.33 EXCAVATING PERMIT
A. Contractor shall submit to the COR a completed AF 103 seven days prior to starting any excavation, demolition or disturbance of any facility greater than 4 inches in depth. Contractor shall mark the limits of the area to be disturbed a minimum of 48 hours prior to beginning work.
Maintain a copy of the approved AF 103 on site at all time. A copy of the AF 103 can be obtained from the COR. Comply with the base policy for all excavation work requiring a work clearance request.
1.34 COMPRESSED AIR
A. Contractor shall provide all compressed air used for work under this Contract, including temporary lines and connections. All temporary lines, etc., shall be removed at the completion of the work.
1.35 WEATHER PROTECTION AND TEMPORARY HEATING
A. The Contractor shall provide and maintain weather protection as may be required to properly protect all parts of the structure from damage during construction.
B. The Contractor shall be responsible for repairs and maintenance to the heating system or units during the period during progress of building construction and shall deliver same to the Government, at termination of such use, in perfect condition, cleaning out all air ducts and replacing all filters. Any temporary heating shall be at the expense of the Contractor.
GENERAL REQUIREMENTS 010000 - Page 14 of 20
1.36 BLOCKING OFF BASE STREETS
A. At least 2 hours prior to the blocking of any street, the Contractor shall notify the COR, Base Fire Department and Base Security Police, identify the location, the reason and the estimated time of closure. No more than two streets shall be closed at any time, and the two shall be no closer than 750 feet from each other. However, there shall be no closures without at least 8 days of prior notification to both the COR, Base Fire Department, Base Security Officer and the Contracting Officer.
1.37 ARCHEOLOGICAL, PALEONTOLOGICAL AND ENDANGERED SPECIES FINDS
A. Any archeological finds (evidence of human occupation) or paleontological finds (evidence of prehistoric plant or animal life) are to be reported to the Contracting Officer immediately and continue work in other areas without interruption. Protect native endangered flora and fauna and notify the Contracting Officer of any construction activities that might threaten endangered species or their habitats.
1.38 REAL PROPERTY/EQUIPMENT REPORT
A. The Contractor shall furnish, upon completion of the Project, "Real Property Installed Cost," form in triplicate, of all equipment installed in the facility, and the installed cost of each item.
Furthermore, the listing shall include the location of each item…