Sec_26_1200_MEDIUM-VOLTAGE_TRANSFORMERS.pdf
PDF 103 KB Posted
- Attached to
- Construct ACA Alert Crew Quarters Federal contract opportunity
- Solicitation number
- W91364-16-R-0001
About this file
Sec 26 1200
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OANG 180th Fighter Wing - Swanton, Ohio URS
WYTD 079032 - Construct ACA Alert Crew Quarters Facility URS Project No. 14578137
1 December 2015 Type B Services - B3 Submission
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 1 of 8
SECTION 26 1200
MEDIUM-VOLTAGE TRANSFORMERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following types of transformers with medium-voltage primaries:
1. Pad-mounted, liquid-filled transformers.
1.3 DEFINITIONS
A. NETA ATS: Acceptance Testing Specification.
1.4 SUBMITTALS
A. Product Data: Include rated nameplate data, capacities, weights, dimensions, minimum clearances, installed devices and features, location of each field connection, and performance for each type and size of transformer indicated.
B. Shop Drawings: Diagram power signal wiring.
C. Coordination Drawings: Floor plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:
1. Underground primary and secondary conduit stub-up location.
2. Dimensioned concrete base, outline of transformer, and required clearances.
3. Ground rod and grounding cable locations.
1.5 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent testing agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational
Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the InterNational
Electrical Testing Association or the National Institute for Certification in Engineering
Technologies to supervise on-site testing specified in Part 3.
B. Product Options: Drawings indicate size, profiles, and dimensional requirements of transformers and are based on the specific system indicated. Refer to Division 01 Section
"Product Requirements."
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 2 of 8
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
D. Comply with IEEE C2.
E. Comply with ANSI C57.12.10, ANSI C57.12.28, IEEE C57.12.70, and IEEE C57.12.80.
F. Comply with NFPA 70.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store transformers protected from weather and so condensation will not form on or in units.
Provide temporary heating according to manufacturer's written instructions.
1.7 PROJECT CONDITIONS
A. Service Conditions: IEEE C37.121, usual service conditions except for the following:
1. Exposure to significant solar radiation.
2. Altitudes above 3300 feet.
3. Exposure to fumes, vapors, or dust.
4. Exposure to explosive environments.
5. Exposure to hot and humid climate or to excessive moisture, including steam, salt spray, and dripping water.
6. Exposure to seismic shock or to abnormal vibration, shock, or tilting.
7. Exposure to excessively high or low temperatures.
8. Unusual transportation or storage conditions.
9. Unusual grounding-resistance conditions.
10. Unusual space limitations.
1.8 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 03.
B. Coordinate installation of louvers, doors, spill retention areas, and sumps. Coordinate installation so no piping or conduits are installed in space allocated for medium-voltage transformers except those directly associated with transformers.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Cooper Industries; Cooper Power Systems Division.
2. Eaton Corp.
3. Federal Pacific Transformer Company; Division of Electro-Mechanical Corp.
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 3 of 8
4. GE Electrical Distribution & Control.
5. Kuhlman Electric Corporation.
6. Pauwels Transformers.
7. Pioneer Transformers.
8. Siemens Energy & Automation, Inc.
9. Square D; Schneider Electric.
10. Virginia Transformer Corp.
2.2 PAD-MOUNTED, LIQUID-FILLED TRANSFORMERS
A. Description: ANSI C57.12.13,IEEE C57.12.00, IEEE C57.12.22, pad-mounted, 2-winding transformers. Stainless-steel tank base, cabinet, and sills.
B. Insulating Liquid: Mineral oil, complying with ASTM D 3487, Type II, and tested according to
ASTM D 117.
C. Insulating Liquid: Less flammable, edible-seed-oil based, and UL listed as complying with
NFPA 70 requirements for fire point of not less than 300 deg C when tested according to
ASTM D 92. Liquid shall be biodegradable and nontoxic.
D. Insulating Liquid: Less flammable, dielectric, and UL listed as complying with NFPA 70 requirements for fire point of not less than 300 deg C when tested according to ASTM D 92.
Liquid shall be biodegradable and nontoxic.
E. Insulating Liquid: Less flammable, silicone-based dielectric, and UL listed as complying with
NFPA 70 requirements for fire point of not less than 300 deg C when tested according to
ASTM D 92. Liquid shall have low toxicity and be nonhazardous.
F. Insulation Temperature Rise: 55 deg C when operated at rated kVA output in a 40 deg C ambient temperature. Transformer shall be rated to operate at rated kilovolt ampere in an average ambient temperature of 30 deg C over 24 hours with a maximum ambient temperature of 40 deg C without loss of service life expectancy.
G. Basic Impulse Level: 95 kV.
H. Full-Capacity Voltage Taps: Four 2.5 percent taps, 2 above and 2 below rated high voltage;
with externally operable tap changer for de-energized use and with position indicator and padlock hasp.
I. High-Voltage Switch: 200 A, make-and-latch rating of 10-kA RMS, symmetrical, arranged for loop feed with 3-phase, 4-position, gang-operated, load-break switch that is oil immersed in transformer tank with hook-stick operating handle in primary compartment.
J. Primary Fuses: 150-kV fuse assembly with fuses complying with IEEE C37.47.
1. Current-limiting type in dry-fuse holder wells, mechanically interlocked with liquid-immersed switch in transformer tank to prevent disconnect under load.
2. Internal liquid-immersed cartridge fuses.
3. Bay-O-Net liquid-immersed fuses that are externally replaceable without opening transformer tank.
4. Bay-O-Net liquid-immersed fuses in series with liquid-immersed current-limiting fuses.
Bay-O-Net fuses shall be externally replaceable without opening transformer tank.
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 4 of 8
5. Bay-O-Net liquid-immersed current-limiting fuses that are externally replaceable without opening transformer tank.
K. Surge Arresters: Distribution class, one for each primary phase; complying with IEEE C62.11 and NEMA LA 1; support from tank wall within high-voltage compartment. Transformers shall have three arresters for loop-feed circuits.
L. High-Voltage Terminations and Equipment: Live front with externally clamped porcelain bushings and cable connectors suitable for terminating primary cable.
M. High-Voltage Terminations and Equipment: Dead front with universal-type bushing wells for dead-front bushing-well inserts, complying with IEEE 386 and including the following:
1. Bushing-Well Inserts: One for each high-voltage bushing well.
2. Surge Arresters: Dead-front, elbow-type, metal-oxide-varistor units.
3. Parking Stands: One for each high-voltage bushing well.
4. Portable Insulated Bushings: Arranged for parking insulated, high-voltage, load-break cable terminators; one for each primary feeder conductor terminating at transformer.
N. Accessories:
1. Drain Valve: 1 inch, with sampling device.
2. Dial-type thermometer.
3. Liquid-level gage.
4. Pressure-vacuum gage.
5. Pressure Relief Device: Self-sealing with an indicator.
6. Mounting provisions for low-voltage current transformers.
7. Mounting provisions for low-voltage potential transformers.
8. Busway terminal connection at low-voltage compartment.
9. Alarm contacts for gages and thermometer listed above.
2.3 IDENTIFICATION DEVICES
A. Nameplates: Engraved, laminated-plastic or metal nameplate for each transformer, mounted with corrosion-resistant screws. Nameplates and label products are specified in Division 26
Section "Electrical Identification."
2.4 SOURCE QUALITY CONTROL
A. Factory Tests: Perform design and routine tests according to standards specified for components. Conduct transformer tests according to IEEE C57.12.90.
B. Factory Tests: Perform the following factory-certified tests on each transformer:
1. Resistance measurements of all windings on rated-voltage connection and on tap extreme connections.
2. Ratios on rated-voltage connection and on tap extreme connections.
3. Polarity and phase relation on rated-voltage connection.
4. No-load loss at rated voltage on rated-voltage connection.
5. Excitation current at rated voltage on rated-voltage connection.
6. Impedance and load loss at rated current on rated-voltage connection and on tap extreme connections.
7. Applied potential.
8. Induced potential.
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 5 of 8
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions for compliance with requirements for medium-voltage transformers.
B. Examine roughing-in of conduits and grounding systems to verify the following:
1. Wiring entries comply with layout requirements.
2. Entries are within conduit-entry tolerances specified by manufacturer and no feeders will have to cross section barriers to reach load or line lugs.
C. Examine walls, floors, roofs, and concrete bases for suitable mounting conditions where transformers will be installed.
D. Verify that ground connections are in place and that requirements in Division 26 Section
"Grounding and Bonding" have been met. Maximum ground resistance shall be 5 ohms at location of transformer.
E. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Install transformers on concrete bases.
1. Anchor transformers to concrete bases according to manufacturer's written instructions.
2. Construct concrete bases of dimensions indicated, but not less than 24 inches larger in both directions than supported unit and 6 inches high.
3. Use 3000-psi, 28-day compressive-strength concrete and reinforcement as specified in
Division 03 Section "Cast-in-Place Concrete."
4. Install epoxy-coated anchor bolts for supported equipment.
5. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
6. Tack-weld or bolt transformers to channel-iron sills embedded in concrete bases. Install sills level and grout flush with floor or base.
B. Maintain minimum clearances and workspace at equipment according to manufacturer's written instructions and NFPA 70.
3.3 IDENTIFICATION
A. Identify field-installed wiring and components and provide warning signs as specified in
Division 26 Section "Basic Electrical Materials and Methods."
3.4 CONNECTIONS
A. Ground equipment according to Division 26 Section "Grounding and Bonding."
B. Connect wiring according to Division 26 Section "Conductors and Cables."
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 6 of 8
3.5 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust field-assembled components and equipment installation, including connections. Report results in writing.
B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
C. Perform the following field tests and inspections and prepare test reports:
1. After installing transformers but before primary is energized, verify that grounding system at substation is tested at specified value or less.
2. After installing transformers and after electrical circuitry has been energized, test for compliance with requirements.
3. Perform visual and mechanical inspection and electrical test stated in NETA ATS.
Certify compliance with test parameters.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
D. Remove and replace malfunctioning units and retest as specified above.
E. Test Reports: Prepare written reports to record the following:
1. Test procedures used.
2. Test results that comply with requirements.
3. Test results that do not comply with requirements and corrective actions taken to achieve compliance with requirements.
3.6 FOLLOW-UP SERVICE
A. Voltage Monitoring and Adjusting: If requested by Owner, perform the following voltage monitoring after Substantial Completion but not more than six months after Final Acceptance:
1. During a period of normal load cycles as evaluated by Owner, perform seven days of three-phase voltage recording at secondary terminals of each transformer. Use voltmeters with calibration traceable to National Institute of Science and Technology standards and with a chart speed of not less than 1 inch per hour. Voltage unbalance greater than
1 percent between phases, or deviation of any phase voltage from nominal value by more than plus or minus 5 percent during test period, is unacceptable.
2. Corrective Actions: If test results are unacceptable, perform the following corrective actions, as appropriate:
a. Adjust transformer taps.
b. Prepare written request for voltage adjustment by electric utility.
3. Retests: After corrective actions have been performed, repeat monitoring until satisfactory results are obtained.
4. Report: Prepare written report covering monitoring and corrective actions performed.
B. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final
Acceptance, perform infrared scan of the transformer. Open front covers so joints and connections are accessible to portable scanner.
1. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of the transformer 11 months after date of Substantial Completion.
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 7 of 8
2. Instrument: Use an infrared-scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.
3. Record of Infrared Scanning: Prepare a certified report that identifies transformer checked and that describes infrared-scanning results. Include notation of deficiencies detected, remedial action taken and observations after remedial action.
END OF SECTION 26 1200
MEDIUM-VOLTAGE TRANSFORMERS 261200 - Page 8 of 8
This page intentionally left blank.
File details come from the government source that posted it. Updated .