3_LEED_Checklist_AirCrew_TypeB3__30_Dec_2015.pdf
PDF 79 KB Posted
- Attached to
- Construct ACA Alert Crew Quarters Federal contract opportunity
- Solicitation number
- W91364-16-R-0001
About this file
LEED Checklist
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2015 2015
Categories
Prereq 1 Construction Activity Pollution
Prevention
USGBC
Prereq X $0 $0 A-E Comment: This credit is feasible and already included as a matter of standard construction practice.
Credit 1 Site Selection 1 1 $0 1 $0 A-E Comment: The site is previously developed & qualifies for this credit.
Credit 2 Development Density & Community
Connectivity 5 n/a 5 n/a
A-E Comment: This site is not located in an area that complies with this credit.
Credit 3 Brownfield Redevelopment 1 n/a 1 n/a A-E Comment: This site is not a brownfield.
Credit 4.1 Alternative Transportation, Public Transportation Access 6 n/a 6 n/a
A-E Comment: Public transportation is not accessible from this site.
ANG Recommended. A-E must evaluate feasibility and achieve if applicable by project scope.
A-E Comment: Easily feasible by adding a bicycle rack. The project already has shower and changing facilities. Base to advise if this is appropriate for a facility within the flighline secure fence.
Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 3 n/a 3 n/a
A-E Comment: This building has no designated parking.
Credit 4.4 Alternative Transportation, Parking Capacity 2 2 $0 2 $0
A-E Comment: This building has no parking, therfore it complies with this credit.
Credit 5.1 Site Development, Protect or Restore Habitat 1 n/a 1 n/a
A-E Comment: This credit is not feasible due to the site's location on the flightline.
Credit 5.2 Site Development, Maximize Open Space 1 n/a 1 n/a
A-E Comment: This credit is not feasible due to the site's location on the flightline.
n/a n/a ANG Recommended. A-E must evaluate feasibility and achieve if applicable by project scope.
n/a n/a
A-E Comment: A 25% decrease in the volume of stormwater runoff from the two-year, 24-hour design storm is unattainable because we are adding impervious area with the new aircrew facility building.
n/a n/a ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope.
n/a n/a
A-E Comment: This credit is unattainable because we are adding impervious area within the project limits. This credit would likely require installing a hydrodynamic separation BMP to treat the stormwater runoff from 90% of the average annual rainfall. There is inadequate space on site and it almost certainly falls outside of the project budget.
ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.
A-E Comment: Use of all light colored concrete -with required maintenance plan to keep clean - in lieu of base bid use of standard concrete or asphalt. Relatively high unit cost, but given the limited pavement required this credit is recommended.
ANG Required. A-E must ensure project achieves this point.
ANG Recom.
(1 point)
Credit 6.1 Stormwater Design, Quantity Control
ANG Recom.
(1 point)
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
$7,500 1 $7,5001
Sustainable Sites Possible Points: 26
Credit 7.1 Heat Island Effect, Non-Roof
$2,350 1 $2,350
ANG Recom.
(1 point)
Credit 6.2 Stormwater Design, Quality Control
ANG Recom.
(1 point) Credit 4.2
Alternative Transportation, Bicycle Storage & Changing Rooms
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
A-E Comment: This credit is easily achieveable though the use of a white membrane or High SRI standing seam metal roof. There may be a slight upcharge for the membrane or panel, but in all likelihood it can be achieved with a manufacturer standard roof panel at no additional cost.
Credit 8 Light Pollution Reduction 1 1 $0 1 $0
A-E Comment: This point may be possible by using cut-off exterior fixtures depending on base requiements for security lighting. These fixtures would be used regardless, so there would be no increase in project cost.
Prereq 1 Water Use Reduction
USGBC
Prereq X A-E Comment:
Credit 1 Water Efficient Landscaping 2 to 4 points
ANG Requirement. EPAct 2005 - Water
Conservation. E.O. 13423 - Reduce Water
Consumption. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: See WE credit 2 below.
ANG Recommended. Avoid use of irrigation systems as project, location and climate allow.
A-E Comment: No potable water will be used and no irrigiation will be installed as part of this project.
This credit adds no cost to the project.
Credit 2 Innovative Wastewater Technologies 2 n/a 2 n/a
A-E Comment: The infrastructure necessary for innovative waste water technologies are typically too expensive in small projects to support.
Credit 3 Water Use Reduction 2 to 4 points
ANG Requirement. EPAct 2005 - Water
Conservation. E.O. 13423 - Reduce Water
Consumption. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: This strategy to achieve this credit is to use low-flow fixtures for all plumbing fixtures.
Installation costs are unaffected. Fixture costs are slightly higher.
ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.
A-E Comment:Due to the newest LEED baseline fixture comsumption requirements, this will not be achievable in the facility.
40% Reduction 1 1 $1,000 n/a
A-E Comment: A-E Comment:Due to the newest
LEED baseline fixture comsumption requirements, this will not be achievable in the facility.
1 $1,500
No Potable Water Use or Irrigation $0
$3,500
$0 n/a
Credit 7.2 Heat Island Effect, Roof 1 $3,500
2 $0
Energy & Atmosphere Possible Points: 35
ANG
Required
(2 points)
Reduce by 50%
Water Efficiency Possible Points: 10
ANG Recom.
(2 points) $02
ANG
Required
$3,500
ANG Recom.
(1 point)35% Reduction
30% Reduction $3,500 2
ANG
Required
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
Prereq 1 Fundamental Commissioning of
Building Energy Systems
USGBC
Prereq X $13,000 $13,000
A-E Comment: Meeting this USGBC prerequisite will add to the cost of the project, above what is currently required by ANG design policy.
IMPORTANT NOTE: Decision to go after enhanced commissioning point (later in score sheet) must be decided prior to Type B services so that the appropriate and required type of commissioning agent can be integrated into the design team.
Prereq 2 Minimum Energy Performance
USGBC
Prereq X $0 $0
A-E Comment: This point is met by conformance with basic ANG design policy and is within the overall scope of the project.
Prereq 3 Fundamental Refrigerant
Management
USGBC
Prereq X $0 $0
A-E Comment: Requirements for management will be iincluded in the project specifications. This credit is required regardless of LEED, so it represents no additional cost to the project.
Credit 1 Optimize Energy Performance 1 to 19 Points
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
See below
See below
See below
See below
See below See below
See below
ANG Prov.
Required
(1 point)
ANG Prov.
Required
(1 point)
16% New Buildings or 12%
Existing Building Renovations
ANG Prov.
Required
(1 point)
14% New Buildings or 10%
Existing Building Renovations
12% New Buildings or 8%
Existing Building Renovations
ANG Prov.
Required
(1 point) 1 See below
See below1
See below
18% New Buildings or 14%
Existing Building Renovations
ANG Prov.
Required
(1 point)
20% New Buildings or 16%
Existing Building Renovations
See below
22% New Buildings or 18%
Existing Building Renovations
1See below ANG Prov.
Required
(1 point)
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: See 30% threshold for comments.
ANG Provisional Requirement. EPAct 2005 -
30% Energy Use Reduction. Federal
Sustainable Buildings MOU. A-E to ensure project achieves this point, only as life cycle cost effective and meet 2005 EPAct 30% reduction.
A-E Comment: A/E will design the building to achieve the required 2005 EPACT 30% savings for a new building (26% for a renovation) only as life cycle cost effective. The design will take in to account electrical systems, mechanical systems, and building envelope.
32% New Buildings or 28%
Existing Building Renovations 1 1 See above See above
A-E Comment:
34% New Buildings or 30%
36% New Buildings or 32%
38% New Buildings or 34%
40% New Buildings or 36%
42% New Buildings or 38%
44% New Buildings or 40%
46% New Buildings or 42%
48% New Buildings or 44%
1 1 See above See above
A-E Comment:
Credit 2 On-Site Renewable Energy 1 to 7 Points
See below
$156,000
See below
See below1
26% New Buildings or 22%
Existing Building Renovations
ANG Prov.
Required
(1 point)
28% New Buildings or 24%
Existing Building Renovations
ANG Prov.
Required
(1 point)
$156,000
See below
30% New Buildings or 26%
Existing Building Renovations
ANG Prov.
Required
(1 point)
24% New Buildings or 20%
Existing Building Renovations
ANG Prov.
Required
(1 point) 1 See below
See below
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
ANG Recommended. EPAct 2005 and EISA
2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment: EA 2 will be an Option or ABI.
Based on initial reaction to the budget, it is unlikely these systems will fall within the budget scope.
The design team will also need guidance related to limitations of roof mounted collectors on a facility that sits on the flightilne.
ANG Recommended. EPAct 2005 and EISA
2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
ANG Recommended. EPAct 2005 and EISA
2007. Provide 30% domestic hot water via solar system if LCC effective. Provide roof mounted photovoltaic systems if LCC effective. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
ANG Provisional Recommendation - see above.
EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
ANG Provisional Recommendation - see above.
EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
ANG Provisional Recommendation - see above.
EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
ANG Provisional Recommendation - see above.
EPAct 2005 and EISA 2007. A-E must thoroughly evaluate feasibility of project achieving this point as base bid items or options. Provide complete LCC analysis.
A-E Comment:
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD1
3% Renewable Energy ANG Recom.
(1 point) TBD1
1% Renewable Energy ANG Recom.
(1 point)
13% Renewable Energy ANG Prov.
Recom.
(1 point)
5% Renewable Energy ANG Recom.
(1 point)
9% Renewable Energy ANG Prov.
Recom.
(1 point)
7% Renewable Energy ANG Prov.
Recom.
(1 point)
11% Renewable Energy ANG Prov.
Recom.
(1 point)
TBD
1 TBD
1 TBD
TBD
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
ANG Recommended. EPAct 2005 - Energy
Conservation. E.O. 13423 - Energy
Conservation. Federal Sustainable Buildings
MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.
A-E Comment: URS recommends this point and will include it in the specifications as an option or
ABI.
ANG Recommended. E.O. 13423 - Reduction of
Toxic and Hazardous Materials Acquired.
Federal Sustainable Buildings MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.
A-E Comment:
ANG Requirement. EPAct 2005 - Metering of
Utility with Smart Metering. Federal
Sustainable Buildings MOU. A-E must ensure project achieves this point.
A-E Comment: This LEED point includes the required smart metering and monitoring as required by EPAct. All metering is tied to the DDC system. Specifications will require the control system to include creation of specific monitoring and utility consumption data.
Credit 6 Green Power 2 2 $3,000 2 $3,000
A-E Comment: This credit is purely administrative and represents relatively inexpensive points if needed. However, purchase of Green Power has no impact on the construction of the building itself.
Must be evaluated against any military regulations pertaining to utility credit purchase contracts.
Also E.O. 13423 - Waste Prevention and
Recycling Programs in Facilities.
A-E Comment: Space for recycling will be accomodated in the kitchen and storage room as required.
Credit 1.1 Building Reuse, Maintain Existing
Walls, Floors & Roof
1 to 3
Points
Maintain 55% of Existing Walls, Floors
& Roof 1 n/a 1 n/a
A-E Comment: This credit is not applicable for new construction.
Maintain 75% of Existing Walls, Floors
& Roof 1 n/a 1 n/a
A-E Comment: This credit is not applicable for new construction.
Maintain 95% of Existing Walls, Floors
& Roof 1 n/a 1 n/a
A-E Comment: This credit is not applicable for new construction.
Credit 1.2 Building Reuse, Maintain 50% of
Interior Non-Structural Elements 1 n/a 1 n/a
A-E Comment: This credit is not applicable for new construction.
Credit 2 Construction Waste Management 1 to 2
Points
ANG Requirement. E.O. 13423 - Increase
Diversion of Solid Waste. Federal Sustainable
Buildings MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit.
$5,000
$1,000
$12,000
$2,500
$13,650
$13,650
$2,500
$12,000
Credit 3 Enhanced Commissioning ANG Recom.
(2 points)
Credit 5
Credit 4 Enhanced Refrigerant Management ANG Recom.
(2 points)
Measurement & Verification
ANG
Required 3
ANG
Required $5,000
Prereq 1 Storage & Collection of Recyclables
USGBC
Prereq X $1,000
Materials & Resources Possible Points: 14
Divert 50% from Landfill
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
ANG Requirement. E.O. 13423 - Increase
Diversion of Solid Waste. Federal Sustainable
Buildings MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit.
Credit 3 Materials Reuse 1 to 2
Points
Reuse 5% 1 n/a 1 n/a A-E Comment: Re-used or salvaged materials are not feasible for this project due to the nature of its construction.
Reuse 10% 1 n/a 1 n/a A-E Comment: Re-used or salvaged materials are not feasible for this project due to the nature of its construction.
Credit 4 Recycled Content 1 to 2
Points
ANG Required. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Recycled content is common place and should not add cost to the project. Administrative cost will be necessary for the contractor to track progress.
20% (post-consumer + ½ pre-consumer) 1 1 $0 1 $0
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Recycled content is common place and should not add cost to the project. Administrative cost will be necessary for the contractor to track progress.
Credit 5 Regional Materials 1 to 2
Points
ANG Required. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Given the location of the project, a large number of products are manufactured within the required radius and should not add material cost to the project. Administrative cost will be necessary for the contractor to track progress.
20% Extracted, Processed &
Manufactured Regionally 1 1 $0 1 $0
A-E Comment: A-E will include specification language for the contractor to comply with this credit.
Credit 6 Rapidly Renewable Materials
ANG Recommended. Federal Sustainable
Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope.
A-E Comment: Not feasible given construction type
& use. Rapidly renewable finish materials will not have the durability required for this facility.
Credit 7 Certified Wood
ANG Recommended. Federal Sustainable
Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Material costs and tracking this credit will add cost. Installation costs are unaffected.
$3,500
$1,000
$2,500 n/a
$1,000
Divert 75% from Landfill
ANG
Required
10% (post-consumer + ½ pre-consumer)
ANG
Recom.
(1 point)
$2,5001
ANG
Required
$1,000
Indoor Environmental Quality Possible Points: 15
11 $3,500 n/a 1
ANG
Recom.
(1 point)
10% Extracted, Processed &
Manufactured Regionally
ANG
Required 1 $1,000 1
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
Also Federal Sustainable Buildings MOU.
A-E Comment: This credit is a matter of good design practice and will not add cost to the project.
Also Federal, DoD and Air Force Regulation.
A-E Comment: Installation is non-smoking.
Credit 1 Outdoor Air Delivery Monitoring 1 1 $9,000 1 $9,000 A-E Comment:
Credit 2 Increased Ventilation 1 n/a 1 n/a
A-E Comment: This point negatively affects enegry savings because a higher volume of air needs to be conditioned. Given the relative lack of indoor air contaminants likely in this building, URS does not recommend this credit.
ANG Required. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Proper IAQ during construction is a matter of good practice and should not add any cost to achieve.
ANG Requirement. Federal Sustainable
Buildings MOU. A-E must ensure project achieves this point.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Added cost for air quality testing will be required.
ANG Required - If Applicable. E.O. 13423 -
Reduction of Toxic and Hazardous Materials
Acquired. Federal Sustainable Buildings MOU.
A-E must achieve if applicable by project scope.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Low-voc materials are common and do not represent any added costs.
ANG Required - If Applicable. E.O. 13423 -
Reduction of Toxic and Hazardous Materials
Acquired. Federal Sustainable Buildings MOU.
A-E must achieve if applicable by project scope.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Low-voc materials are common and do not represent any added costs.
ANG Required - If Applicable. E.O. 13423 -
Reduction of Toxic and Hazardous Materials
Acquired. Federal Sustainable Buildings MOU.
A-E must achieve if applicable by project scope.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Low-voc materials are common and do not represent any added costs.
ANG Required - If Applicable. E.O. 13423 -
Reduction of Toxic and Hazardous Materials
Acquired. Federal Sustainable Buildings MOU.
A-E must achieve if applicable by project scope.
A-E Comment: A-E will include specification language for the contractor to comply with this credit. Low-voc materials are common and do not represent any added costs.
$0
$0
$0
$0
$5,000
$0 1
$0
$0
$5,000
$0
$0
X
X $0
Prereq 2
$0 1
$0
1 $0
$0
ANG
Required
Environmental Tobacco Smoke
(ETS) Control
USGBC
Prereq
1Credit 3.2 Construction IAQ Management Plan, Before Occupancy
ANG
Required
Credit 3.1 Construction IAQ Management Plan, During Construction
Prereq 1 Minimum IAQ Performance
USGBC
Prereq
Credit 4.2 Low-Emitting Materials, Paints & Coatings
ANG
Required
Credit 4.1 Low-Emitting Materials, Adhesives & Sealants
ANG
Required
Low-Emitting Materials, Carpet Systems
ANG
Required
ANG
Required
Low-Emitting Materials, Composite Wood & Agrifiber Products Credit 4.4
Credit 4.3
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
Credit 5 Indoor Chemical & Pollutant Source
Control 1 1 $2,500 1 $2,500
A-E Comment: This credit requires recess walk-off grilles @ entries, mechanical exhaust isolation at rooms w/contaminants, and MERV 13 filtration for occupied areas.
ANG Required. EPAct 2005 - Energy
Conservation. E.O. 13423 - Energy
Conservation. Federal Sustainable Buildings
MOU. A-E must ensure project achieves this point.
A-E Comment: Most of what is necessary to achieve this point is inscluded in the installation standards (occupancy sensors, etc.) and would be done anyway.
Credit 6.2 Controllability of Systems, Thermal Comfort
1 1 TBD TBD $1
A-E Comment: Controlability for thermal is possible, but cost will be dictated by the type of mechanical system selected.
ANG Recommended. Federal Sustainable
Buildings MOU. A-E must achieve this point if applicable by project scope.
A-E Comment: The facility will be designed per the requirements of this credit. This effort is already included in URS's contract.
Credit 7.2 Thermal Comfort, Verification 1 1 $0 1 $0 A-E Comment:A-E will include a sample thermal comfort survey for the ANG to administer.
ANG Required. Federal Sustainable Buildings
MOU. A-E must ensure that project achieves this point. A7O project manager can waive requirement if A-E demonstrates that obtaining point is not possible due to project scope.
A-E Comment: Due to the limited size and number of windows allowed for this facility, this ANG requirement is not feasible.
Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 n/a 1 n/a
A-E Comment: Due to the limited size and number of windows allowed for this facility, this ANG requirement is not feasible.
Credit 1.1
Innovation in Design:
MR Credit 4.2 - Exemplary
Performance
1 1 $0 $0
A-E Comment: MR exemplary performance credits will be pursued, but cannot be guaranteed.
Achieving this credit, if possible, represents no additional cost compared to the figure listed earlier for this credit.
Credit 1.2
Innovation in Design:
MR Credit 5.2 - Exemplary
Performance
1 1 $0 $0
A-E Comment: MR exemplary performance credits will be pursued, but cannot be guaranteed.
Achieving this credit, if possible, represents no additional cost compared to the figure listed earlier for this credit.
Credit 1.3 Innovation in Design:
MR Credit 7 - Exemplary Performance 1 1 $2,000 $2,000
A-E Comment: MR exemplary performance credits will be pursued, but cannot be guaranteed.
Credit 1.4 Innovation in Design:
EA Credit 6 - Exemplary Performance 1 1 $3,000 1 $3,000
A-E Comment: This credit is available by doubling the required purchase of Green Power. This credit is purely administrative and does not affect the actual building.
ANG Policy. EPAct 2005.
A-E must ensure project achieves this point.
A-E Comment: A LEED AP from URS is assigned to this project. This item is already included in
URS's contract.
n/a
$0
$5,000
$0
Credit 7.1 Thermal Comfort, Design
ANG
Recom.
(1 point)
1 $0 n/a 1
Credit 6.1 Controllability of Systems, Lighting
LEED
Accredited Professional
Innovation & Design Process Possible Points: 6
Credit 8.1 Daylight & Views, Daylight 75% of Spaces
ANG
Required
$01
ANG
Required 1Credit 2
ANG
Required 1 $5,000
Air National Guard Sustainable Design and Energy Conservation Score Sheet
Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation
Date:Base: Toledo Express Airport, OH
Points and Point Cost Impact
USGBC Project Registration Access #:
30-Dec-15 Type B3 Services
USGBC Project Title: ASA Alert Crew Quarters Facility ID:1000032542/Access Code:1494402642155957Program FY:
LEED
- AP Project Comments:
Project Design
Point Cost
Estimates
Project Num:
Project Title:
WYTD079032
ASA Alert Crew Quarters
Point and
Prereq.
Cost
Estimates
Design Status:
Project
Design
Points
(Goals)
Credit Description Other
Design
Points
Points
Non
Achieva ble
Points
ANG
Req.
Points
Credit
Credit 1.1 EA Credit 1 (30% new/26% Existing)
Optimize Energy Performance 1 1 $0 1 $0
A-E Comment: See above for a description of this point. Regional priority represents no additional cost beyond what is listed above.
Credit 1.2 SS Credit 6.1
Stormwater Design: Quantity Control 1 n/a 1 n/a
A-E Comment: See above for a description of this point.
Credit 1.3 SS Credit 6.2
Stormwater Design: Quality Control 1 n/a 1 n/a
A-E Comment: See above for a description of this point.
Credit 1.4 WE Credit 2
Innovative Wastewater Technologies 1 n/a 1 n/a
A-E Comment: See above for a description of this point.
Req.
Pts.
Oth.
Pts.
All Point
Cost Est.
X Pts.
Proj.
Goal
Proj. Goal
Cost Est.
Points and Point Cost Impact Summary 110 30 48 $260,000 31 53 $257,501
Summary: Project LEED Score and
Cost Estimate
USGBC Rating System:
ANG Category Requirements:
Score: 53
Vertical - USGBC Silver 50 to 59 points. Industrial - USGBC Silver 50 to 59 points.
Horizontal - 11-13 USGBC points. Utility - 9-10 USGBC points.
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80+ points
Cost: $257,501
Regional Priority Possible Points: 4
File details come from the government source that posted it. Updated .