Prebid_slides_-_ACA_crew_quarters.ppt
PPT presentation 573 KB Posted
- Attached to
- Construct ACA Alert Crew Quarters Federal contract opportunity
- Solicitation number
- W91364-16-R-0001
About this file
Pre-Bid Slides
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prebid Meeting & Site Survey
WYTD079032: Construct ACA Alert Crew Quarters
Performance period: 270 days
Project is funded
Construction Phasing
| Phase 1 – Install temporary construction & security fencing |
| Phase 2 – Remove portion of existing south fence as required. |
| Phase 3 – Construct Alert Crew Facility |
| Phase 4 – Reinstall existing fence to the south of the new facility. |
| Phase 5 – Remove temporary fencing and demobilize. |
Scope of Work
| Base Bid – 6500 sf facility and all supporting demolition, site work and utilities for a complete and usable facility. |
| Project to be certified to LEED Silver |
| 6 Optional Bid Items including roof mounted PV array and solar water heating |
| Clean-up will be as needed to prevent debris on the parking apron – No Foreign Object Debris (FOD) damage |
Site Plan
Site Access, Staging and Security
Single Source Items
| Building automation system – Johnson Controls |
| Fire alarm transceivers – Monaco for reporting fire alarm signals to the base central monitoring station at building 102. |
| Building Mass Notification Systems – Main Control Panel, Local operating consoles and transceivers – ATI. Strobes, speakers, and other items may be from another manufacturer. The completed system must communicate with the central station at bldg. 118. |
| Intrusion Detection System – Advantor |
| Cores for locksets – Schlage Primus 6-pin interchangeable cores with sidebit milling. |
Speicial Features of Work
| Fire suppression system – wet pipe sprinkler system |
| HVAC: Lochnivar boilers with an AAON RTU and VAVs |
| “Easy Button” – Overhead hangar door control – see drawing E3-1. Wiring to connect to 2” UG conduit west of 601. |
| Room A-107 – SCIF – acoustical and physical security features. |
| Klaxon – alert system with ready lights, etc |
Miscellaneous
| Stored materials – won’t be paid for unless properly stored, and supplier invoices provided. Only large ticket items, etc… |
| Laydown areas will be the grass and landscaped areas to the west of building 127 or as approved by the contracting officer |
| Contractor parking will be in the base centralized parking lots. |
| FAA requirements for cranes |
| Questions |