Question_3.docx

DOCX document 13 KB Posted

Attached to
Construct ACA Alert Crew Quarters Federal contract opportunity
Solicitation number
W91364-16-R-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

Questions and answers 3.

View the file

Other files for this federal contract opportunity

Other files attached to Construct ACA Alert Crew Quarters, newest first.
File Type Posted
W91364-16-C-0001_ACA_Crew_Fac.pdf PDF
W91364-16-R-0001_AMENDMENT_06_ACA_Crew.doc DOC document
Sec_26_0513_MEDIUM-VOLTAGE_CABLES.pdf PDF
Sec_22_1313_SANITARY_SEWERS.pdf PDF
Sec_22_1113_WATER_DISTRIBUTION_PIPING.pdf PDF
Sec_26_0913_POWER_MONITORING.pdf PDF
Sec_26_1200_MEDIUM-VOLTAGE_TRANSFORMERS.pdf PDF
Sec_26_4100_LIGHTNING_PROTECTION.pdf PDF
Sec_27_0538_L-V_CABLE_TRAY.pdf PDF
M1-1.pdf PDF
M5-3.pdf PDF
237400ADD1.pdf PDF
OANG_Addendum_No_1_write_up.pdf PDF
M1-2.pdf PDF
ES-1-Updated.pdf PDF
Prebid_slides_-_ACA_crew_quarters.ppt PPT presentation
Section_26_3100_PV_Array.pdf PDF
W91364-16-R-0001_AMENDMENT_02_ACA_Crew.doc DOC document
Pre-bid_attendance_list.pdf PDF
Attachment_B_ENVIRONMENTAL_Forms.pdf PDF
Attachment_A_AF_3065_Breakout_Divisions.xls XLS spreadsheet
5_D._Energy_Econ_Analysis.pdf PDF
W91364-16-R-0001_ACA_Crew_Fac.pdf PDF
Vol_2_B3_Submission_12_01_2015.pdf PDF
4_EPACT_Energy_Score_Sheet.pdf PDF
3_LEED_Checklist_AirCrew_TypeB3__30_Dec_2015.pdf PDF
1_ACA_Crew_B-3_Narrative_30_Dec_2015.pdf PDF
ACA_soil_report.pdf PDF
Vol_1_B3_Submission_12-01-2015.pdf PDF
Construct_ACA_Crew_Building_Type_B3_Documents_2015_12_01.pdf PDF
ACA_crew_facility_construction_and_work_areas.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question: On the one-line drawing (E5-1) it shows that the feed to the new transformer is to originate from building 601 T-1 location. But on the site drawing (ES-1) it shows a new sectionalizing switch.

Is the sectionalizing switch eliminated and if so can you tell me if building 601 T-1 is the transformer shown on the site drawings next to building 601?

Answer: T-1 is the transformer next to building 601. T-1 is a 300KVA transformer, primary voltage 12470, secondary is 480/277V. The intent is to tap off the secondary side of the transformer (existing T-1) to feed the new transformer and facility eliminating the need for a medium voltage sectionalizing switch. The electrical vault shown on the plans contains medium voltage conductors. See revised plans for update to ES-1.