078413 - PENETRATION FIRESTOPPING.DOC

DOC document 56 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) Federal contract opportunity
Solicitation number
W91364-12-R-0005
Issued by
Department of the Army Ohio Army National Guard

About this file

078413

View the file

Other files for this federal contract opportunity

Other files attached to Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC), newest first.
File Type Posted
proposal questions and answers MATOC.pdf PDF
site visit information.pdf PDF
329200 - TURF AND GRASSES.DOC DOC document
334100 - STORM UTILITY DRAINAGE PIPING.DOC DOC document
312000 - EARTH MOVING.DOC DOC document
315000 - EXCAVATION SUPPORT AND PROTECTION.DOC DOC document
12-R-0005-0001.pdf PDF
A201.pdf PDF
P-102.PDF PDF
E-102.pdf PDF
013200 - CONSTRUCTION PROGRESS DOCUMENTATION.DOC DOC document
S-104.PDF PDF
A303.pdf PDF
015000 - TEMPORARY FACILITIES AND CONTROLS.DOC DOC document
221119 SF - DOMESTIC WATER PIPING SPECIALTIES.DOC DOC document
E-109.pdf PDF
E-107.pdf PDF
cr_recyclables_tracking_report_form_9feb2011.xlsx XLSX spreadsheet
265100 - INTERIOR LIGHTING.DOC DOC document
237339 SF - INDOOR DIRECT-FIRED HEATING AND VENTILATING UNITS.DOC DOC document
012500 - SUBSTITUTION PROCEDURES.DOC DOC document
104416 - FIRE EXTINGUISHERS.DOC DOC document
016000 - PRODUCT REQUIREMENTS.DOC DOC document
101400 - SIGNAGE.DOC DOC document
013100 - PROJECT MANAGEMENT AND COORDINATION.DOC DOC document
133419 - METAL BUILDING SYSTEMS.DOC DOC document
220529 SF - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT.DOC DOC document
224500 SF - EMERGENCY PLUMBING FIXTURES.DOC DOC document
260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.DOC DOC document
072100 - THERMAL INSULATION.DOC DOC document
089119 - FIXED LOUVERS.doc DOC document
232123 SF - HYDRONIC PUMPS.doc DOC document
042200 - CONCRETE UNIT MASONRY.DOC DOC document
083613 - SECTIONAL DOORS.DOC DOC document
ED-100.pdf PDF
085113 - ALUMINUM WINDOWS.DOC DOC document
230500_FL - COMMON WORK RESULTS FOR HVAC.DOC DOC document
233713 SF - DIFFUSERS REGISTERS AND GRILLES.DOC DOC document
230516 SF - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.DOC DOC document
230553 SF - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT.DOC DOC document
017839 - PROJECT RECORD DOCUMENTS.DOC DOC document
230523 SF - GENERAL-DUTY VALVES FOR HVAC PIPING.DOC DOC document
C-103.pdf PDF
C-010.PDF PDF
E-106.pdf PDF
051200 STRUCTURAL STEEL FRAMING.DOC DOC document
220548 SF - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT.DOC DOC document
M-104.PDF PDF
230713 SF - DUCT INSULATION.DOC DOC document
088000 - GLAZING.DOC DOC document
Show all 50

Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT TRAINING EQUIPMENT SITE ADD/ALT

Copyright 2010 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 078413 - PENETRATION FIRESTOPPING

Revise this Section by deleting and inserting text to meet Project-specific requirements.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

Retain or delete this article in all Sections of Project Manual.

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Penetrations in fire-resistance-rated walls.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Product Schedule: For each penetration firestopping system. Include location and design designation of qualified testing and inspecting agency.

Retain subparagraph below only after verifying that authorities having jurisdiction will accept modifications handled by method in subparagraph.

1. Where Project conditions require modification to a qualified testing and inspecting agency's illustration for a particular penetration firestopping condition, submit illustration, with modifications marked, approved by penetration firestopping manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly.

1.4 QUALITY ASSURANCE

Retain one of first two paragraphs below. If retaining first paragraph, verify that installers are available to perform work in Project location. A list of FM Global-approved firestop contractors may be found in Ch. 16 of FM Global's "Building Materials Approval Guide," and a list of UL-qualified firestop contractors may be found on www.ul.com/contractor. A list of firestop contractors who are approved or qualified and are also members of Firestop Contractors International Association may be found at www.fcia.org.

A. Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991, "Approval of Firestop Contractors," or been evaluated by UL and found to comply with its "Qualified Firestop Contractor Program Requirements."

B. Installer Qualifications: A firm experienced in installing penetration firestopping similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful performance. Qualifications include having the necessary experience, staff, and training to install manufacturer's products per specified requirements. Manufacturer's willingness to sell its penetration firestopping products to Contractor or to Installer engaged by Contractor does not in itself confer qualification on buyer.

C. Fire-Test-Response Characteristics: Penetration firestopping shall comply with the following requirements:

1. Penetration firestopping tests are performed by a qualified testing agency acceptable to authorities having jurisdiction.

2. Penetration firestopping is identical to those tested per testing standard referenced in "Penetration Firestopping" Article. Provide rated systems complying with the following requirements:

a. Penetration firestopping products bear classification marking of qualified testing and inspecting agency.

b. Classification markings on penetration firestopping correspond to designations listed by the following:

Retain only those subparagraphs below that reference the directories of testing and inspecting agency or agencies approved by authorities having jurisdiction.

1) UL in its "Fire Resistance Directory."

2) Intertek ETL SEMKO in its "Directory of Listed Building Products."

3) FM Global in its "Building Materials Approval Guide."

Retain paragraph below if Work of this Section is extensive or complex enough to justify a preinstallation conference.

D. Preinstallation Conference: Conduct conference at Project site.

1.5 PROJECT CONDITIONS

A. Environmental Limitations: Do not install penetration firestopping when ambient or substrate temperatures are outside limits permitted by penetration firestopping manufacturers or when substrates are wet because of rain, frost, condensation, or other causes.

B. Install and cure penetration firestopping per manufacturer's written instructions using natural means of ventilations or, where this is inadequate, forced-air circulation.

1.6 COORDINATION

A. Coordinate construction of openings and penetrating items to ensure that penetration firestopping is installed according to specified requirements.

B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate penetration firestopping.

Retain paragraph below if Owner plans to engage a testing agency to examine penetration firestopping.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers. Retain paragraph and list of manufacturers in this article. See Section 016000 "Product Requirements."

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. A/D Fire Protection Systems Inc.

2. Grace Construction Products.

3. Hilti, Inc.

4. Johns Manville.

5. Nelson Firestop Products.

6. NUCO Inc.

7. Passive Fire Protection Partners.

8. RectorSeal Corporation.

9. Specified Technologies Inc.

10. 3M Fire Protection Products.

11. Tremco, Inc.; Tremco Fire Protection Systems Group.

12. USG Corporation.

13. Or approved equal.

2.2 PENETRATION FIRESTOPPING

A. Provide penetration firestopping that is produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. Penetration firestopping systems shall be compatible with one another, with the substrates forming openings, and with penetrating items if any.

B. Penetrations in Fire-Resistance-Rated Walls: Provide penetration firestopping with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg (2.49 Pa).

Options in first subparagraph below correspond to the 2006 IBC. Retain types of constructions included in Project and indicate locations on Drawings. Coordinate with the Penetration Firestopping Schedule.

1. Fire-resistance-rated walls include fire walls and fire-barrier walls.

F-rating in subparagraph below indicates resistance to flame spread.

2. F-Rating: Not less than the fire-resistance rating of constructions penetrated.

Retain first paragraph below if smoke barriers are included in Project, and indicate locations on Drawings. Coordinate with the Penetration Firestopping Schedule.

Retain first paragraph below if horizontal assemblies require W-ratings. W-rating indicates resistance to water leakage. W-ratings are not required by the 2006 IBC.

C. Exposed Penetration Firestopping: Provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84.

Retain first paragraph below if required for LEED-NC, LEED-CI, or LEED-CS Credit IEQ 4.1. Coordinate with product selections in other Part 2 articles to ensure that products comply.

D. VOC Content: Penetration firestopping sealants and sealant primers shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

1. Sealants: 250 g/L.

2. Sealant Primers for Nonporous Substrates: 250 g/L.

3. Sealant Primers for Porous Substrates: 775 g/L.

Retain "Low-Emitting Materials" Paragraph below if required for LEED for Schools Credit IEQ 4.

E. Accessories: Provide components for each penetration firestopping system that are needed to install fill materials and to maintain ratings required. Use only those components specified by penetration firestopping manufacturer and approved by qualified testing and inspecting agency for firestopping indicated.

Retain accessories in subparagraphs below required for penetration firestopping indicated.

1. Permanent forming/damming/backing materials, including the following:

a. Slag-wool-fiber or rock-wool-fiber insulation.

b. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state.

c. Fire-rated form board.

d. Fillers for sealants.

2. Temporary forming materials.

3. Substrate primers.

4. Collars.

5. Steel sleeves.

2.3 FILL MATERIALS

If fill materials are Contractor's choice, retain only those paragraphs below that suit Project. If retaining fill materials in the Penetration Firestopping Schedule, coordinate paragraphs with materials specified in the Schedule.

A. Latex Sealants: Single-component latex formulations that do not re-emulsify after cure during exposure to moisture.

B. Firestop Devices: Factory-assembled collars formed from galvanized steel and lined with intumescent material sized to fit specific diameter of penetrant.

C. Intumescent Putties: Nonhardening dielectric, water-resistant putties containing no solvents, inorganic fibers, or silicone compounds.

D. Intumescent Wrap Strips: Single-component intumescent elastomeric sheets with aluminum foil on one side.

E. Mortars: Prepackaged dry mixes consisting of a blend of inorganic binders, hydraulic cement, fillers, and lightweight aggregate formulated for mixing with water at Project site to form a nonshrinking, homogeneous mortar.

F. Pillows/Bags: Reusable heat-expanding pillows/bags consisting of glass-fiber cloth cases filled with a combination of mineral-fiber, water-insoluble expansion agents, and fire-retardant additives. Where exposed, cover openings with steel-reinforcing wire mesh to protect pillows/bags from being easily removed.

G. Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed, expand and cure in place to produce a flexible, nonshrinking foam.

H. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric sealants of grade indicated below:

1. Grade: Nonsag formulation for openings in vertical and sloped surfaces

2.4 MIXING

Retain this article if products are specified that require mixing before application.

A. For those products requiring mixing before application, comply with penetration firestopping manufacturer's written instructions for accurate proportioning of materials, water (if required), type of mixing equipment, selection of mixer speeds, mixing containers, mixing time, and other items or procedures needed to produce products of uniform quality with optimum performance characteristics for application indicated.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Cleaning: Clean out openings immediately before installing penetration firestopping to comply with manufacturer's written instructions and with the following requirements:

1. Remove from surfaces of opening substrates and from penetrating items foreign materials that could interfere with adhesion of penetration firestopping.

2. Clean opening substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with penetration firestopping. Remove loose particles remaining from cleaning operation.

3. Remove laitance and form-release agents from concrete.

Retain first paragraph below if products selected require priming.

B. Priming: Prime substrates where recommended in writing by manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.

Retain paragraph below if products selected require masking tape to prevent staining or damage.

C. Masking Tape: Use masking tape to prevent penetration firestopping from contacting adjoining surfaces that will remain exposed on completion of the Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove stains. Remove tape as soon as possible without disturbing firestopping's seal with substrates.

3.3 INSTALLATION

A. General: Install penetration firestopping to comply with manufacturer's written installation instructions and published drawings for products and applications indicated.

B. Install forming materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated.

1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not indicated as permanent components of firestopping.

C. Install fill materials for firestopping by proven techniques to produce the following results:

1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items as required to achieve fire-resistance ratings indicated.

2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.

3. For fill materials that will remain exposed after completing the Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.

3.4 IDENTIFICATION

Retain this article if labels are required; revise if labeling is limited to selected applications.

A. Identify penetration firestopping with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches (150 mm) of firestopping edge so labels will be visible to anyone seeking to remove penetrating items or firestopping. Use mechanical fasteners or self-adhering-type labels with adhesives capable of permanently bonding labels to surfaces on which labels are placed. Include the following information on labels:

1. The words "Warning - Penetration Firestopping - Do Not Disturb. Notify Building Management of Any Damage."

2. Contractor's name, address, and phone number.

3. Designation of applicable testing and inspecting agency.

4. Date of installation.

5. Manufacturer's name.

6. Installer's name.

3.5 CLEANING AND PROTECTION

A. Clean off excess fill materials adjacent to openings as the Work progresses by methods and with cleaning materials that are approved in writing by penetration firestopping manufacturers and that do not damage materials in which openings occur.

B. Provide final protection and maintain conditions during and after installation that ensure that penetration firestopping is without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, immediately cut out and remove damaged or deteriorated penetration firestopping and install new materials to produce systems complying with specified requirements.

3.6 PENETRATION FIRESTOPPING SCHEDULE

Retain paragraphs in schedule below and revise to suit Project. Delete schedule if penetration firestopping systems are to be selected by Contractor.

Retain first paragraph below if UL-classified systems are required.

A. Where UL-classified systems are indicated, they refer to system numbers in UL's "Fire Resistance Directory" under product Category XHEZ.

Retain first paragraph below if Intertek ETL SEMKO-listed systems are required.

Retain first paragraph below if FM Global-approved systems are required.

Copy and re-edit remaining paragraphs for each system required. Coordinate with manufacturers specified in Part 2. If retaining "FS" option as means of identifying location of each firestopping application on Drawings, insert number to complete drawing designation.

B. Firestopping for Metallic Pipes, Conduit, or Tubing FS-#1:

Retain one or more of first three subparagraphs below if required. If retaining first subparagraph, retain one alpha-alpha option followed by either a four-digit number or range of four-digit numbers. See Evaluations for explanation of UL-system numbers.

Retain one or more of six subparagraphs below if not retaining subparagraphs above.

1. F-Rating: 3 hours.

2. Type of Fill Materials: Silicone Sealants.

C. Firestopping for Nonmetallic Pipe, Conduit, or Tubing FS-#2:

Retain one or more of first three subparagraphs below if required. If retaining first subparagraph, retain one alpha-alpha option followed by either a four-digit number or range of four-digit numbers. See Evaluations for explanation of UL-system numbers.

Retain one or more of six subparagraphs below if not retaining subparagraphs above.

1. F-Rating: 3 hours.

2. Type of Fill Materials: Silicone Sealants.

D. Firestopping for Miscellaneous Electrical Penetrants FS-#3:

Retain one or more of first three subparagraphs below if required. If retaining first subparagraph, retain one alpha-alpha option followed by either a four-digit number or range of four-digit numbers. See Evaluations for explanation of UL-system numbers.

Retain one or more of six subparagraphs below if not retaining subparagraphs above.

1. F-Rating: 3 hours.

2. Type of Fill Materials: Silicone Sealants.

E. Firestopping for Miscellaneous Mechanical Penetrants FS-#4:

Retain one or more of first three subparagraphs below if required. If retaining first subparagraph, retain one alpha-alpha option followed by either a four-digit number or range of four-digit numbers. See Evaluations for explanation of UL-system numbers.

Retain one or more of six subparagraphs below if not retaining subparagraphs above.

1. F-Rating: 3 hours.

2. Type of Fill Materials: Silicone Sealants.

F. Firestopping for Groupings of Penetrants FS-#5:

Retain one or more of first three subparagraphs below if required. If retaining first subparagraph, retain one alpha-alpha option followed by either a four-digit number or range of four-digit numbers. See Evaluations for explanation of UL-system numbers.

Retain one or more of six subparagraphs below if not retaining subparagraphs above.

1. F-Rating: 3 hours.

2. Type of Fill Materials: As required to achieve rating.

END OF SECTION 078413