F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 1
SECTION 265600 - EXTERIOR LIGHTING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Exterior luminaires with lamps and ballasts.
2. Luminaire-mounted photoelectric relays.
3. Poles and accessories.
B. Related Sections include the following:
1. Division 26 Section "Interior Lighting" for exterior luminaires normally mounted on exterior surfaces of buildings.
1.3 DEFINITIONS
A. CRI: Color-rendering index.
B. HID: High-intensity discharge.
C. Luminaire: Complete lighting fixture, including ballast housing if provided.
D. Pole: Luminaire support structure, including tower used for large area illumination.
E. Standard: Same definition as "Pole" above.
1.4 STRUCTURAL ANALYSIS CRITERIA FOR POLE SELECTION
A. Dead Load: Weight of luminaire and its horizontal and vertical supports, lowering devices, and supporting structure, applied as stated in AASHTO LTS-4.
B. Live Load: Single load of 500 lbf, distributed as stated in AASHTO LTS-4.
C. Ice Load: Load of 3 lbf/sq. ft., applied as stated in AASHTO LTS-4.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 2
D. Wind Load: Pressure of wind on pole and luminaire, calculated and applied as stated in AASHTO LTS-4.
1. Wind speed for calculating wind load for poles 50 feet or less in height is 90 mph.
1.5 SUBMITTALS
A. Product Data: For each luminaire, pole, and support component, arranged in order of lighting unit designation. Include data on features, accessories, finishes, and the following:
1. Physical description of luminaire, including materials, dimensions, effective projected area, and verification of indicated parameters.
2. Details of attaching luminaires and accessories.
3. Details of installation and construction.
4. Luminaire materials.
5. Photometric data based on laboratory tests of each luminaire type, complete with indicated lamps, ballasts, and accessories.
a. Photometric data shall be certified by manufacturer's laboratory with a current accreditation under the National Voluntary Laboratory Accreditation Program for Energy Efficient Lighting Products.
6. Photoelectric relays.
7. Ballasts, including energy-efficiency data.
8. Lamps, including life, output, and energy-efficiency data.
9. Materials, dimensions, and finishes of poles.
10. Means of attaching luminaires to supports, and indication that attachment is suitable for components involved.
11. Anchor bolts for poles.
12. Manufactured pole foundations.
B. Shop Drawings:
1. Anchor-bolt templates keyed to specific poles and certified by manufacturer.
2. Design calculations, certified by a qualified professional engineer, indicating strength of screw foundations and soil conditions on which they are based.
3. Wiring Diagrams: Power and control wiring.
C. Pole and Support Component Certificates: Signed by manufacturers of poles, certifying that products are designed for indicated load requirements in AASHTO LTS-4 and that load imposed by luminaire has been included in design.
D. Qualification Data: For agencies providing photometric data for lighting fixtures.
E. Field quality-control test reports.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 3
F. Operation and Maintenance Data: For luminaires and poles to include in emergency, operation, and maintenance manuals.
G. Warranty: Special warranty specified in this Section.
1.6 QUALITY ASSURANCE
A. Luminaire Photometric Data Testing Laboratory Qualifications: Provided by manufacturers' laboratories that are accredited under the National Volunteer Laboratory Accreditation Program for Energy Efficient Lighting Products.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
C. Comply with IEEE C2, "National Electrical Safety Code."
D. Comply with NFPA 70.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Package aluminum poles for shipping according to ASTM B 660.
B. Store poles on decay-resistant-treated skids at least 12 inches above grade and vegetation. Support poles to prevent distortion and arrange to provide free air circulation.
C. Retain factory-applied pole wrappings on metal poles until right before pole installation. For poles with nonmetallic finishes, handle with web fabric straps.
1.8 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace products that fail in materials or workmanship; that corrode; or that fade, stain, perforate, erode, or chalk due to effects of weather or solar radiation within specified warranty period. Manufacturer may exclude lightning damage, hail damage, vandalism, abuse, or unauthorized repairs or alterations from special warranty coverage.
1. Warranty Period for Luminaires: Five years from date of Substantial Completion.
2. Warranty Period for Metal Corrosion: Five years from date of Substantial Completion.
3. Warranty Period for Color Retention: Five years from date of Substantial Completion.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 4
4. Warranty Period for Lamps: Replace lamps and fuses that fail within 12 months from date of Substantial Completion; furnish replacement lamps and fuses that fail within the second 12 months from date of Substantial Completion.
5. Warranty Period for Poles: Repair or replace lighting poles and standards that fail in finish, materials, and workmanship within manufacturer's standard warranty period, but not less than three years from date of Substantial Completion.
1.9 EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
B. Lamps: 10 for every 100 of each type and rating installed. Furnish at least one of each type.
C. Glass and Plastic Lenses, Covers, and Other Optical Parts: 10 for every 100 of each type and rating installed. Furnish at least one of each type.
D. Ballasts: 10 for every 100 of each type and rating installed. Furnish at least one of each type.
E. Globes and Guards: 10 for every 20 of each type and rating installed. Furnish at least one of each type.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In Lighting Fixture Schedule where titles below are column or row headings that introduce lists, the following requirements apply to product selection:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacture listed on the drawings.
2.2 LUMINAIRES, GENERAL REQUIREMENTS
A. Luminaires shall comply with UL 1598 and be listed and labeled for installation in wet locations by an NRTL acceptable to authorities having jurisdiction.
B. Comply with IESNA RP-8 for parameters of lateral light distribution patterns indicated for luminaires.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 5
C. Metal Parts: Free of burrs and sharp corners and edges.
D. Sheet Metal Components: Corrosion-resistant aluminum, unless otherwise indicated.
Form and support to prevent warping and sagging.
E. Housings: Rigidly formed, weather- and light-tight enclosures that will not warp, sag, or deform in use. Provide filter/breather for enclosed luminaires.
F. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage under operating conditions, and designed to permit relamping without use of tools.
Designed to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during relamping and when secured in operating position. Doors shall be removable for cleaning or replacing lenses. Designed to disconnect ballast when door opens.
G. Exposed Hardware Material: Stainless steel.
H. Plastic Parts: High resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.
I. Light Shields: Metal baffles, factory installed and field adjustable, arranged to block light distribution to indicated portion of normally illuminated area or field.
J. Reflecting surfaces shall have minimum reflectance as follows, unless otherwise indicated:
1. White Surfaces: 85 percent.
2. Specular Surfaces: 83 percent.
3. Diffusing Specular Surfaces: 75 percent.
K. Lenses and Refractors Gaskets: Use heat- and aging-resistant resilient gaskets to seal and cushion lenses and refractors in luminaire doors.
L. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -tested luminaire before shipping. Where indicated, match finish process and color of pole or support materials.
M. Factory-Applied Finish for Aluminum Luminaires: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
1. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes.
2. Class I, Clear Anodic Finish: AA-M32C22A41 (Mechanical Finish: medium satin; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class I, clear coating 8 mm or thicker) complying with AAMA 611.
3. Class I, Color Anodic Finish: AA-M32C22A42/A44 (Mechanical Finish:
medium satin; Chemical Finish: etched, medium matte; Anodic Coating:
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 6
Architectural Class I, integrally colored or electrolytically deposited color coating 8 mm or thicker complying with AAMA 611.
a. Color: Dark bronze unless otherwise specified in Lighting Fixture Schedule on the Drawings.
2.3 LUMINAIRE-MOUNTED PHOTOELECTRIC RELAYS
A. Comply with UL 773 or UL 773A.
B. Contact Relays: Factory mounted, single throw, designed to fail in the on position, and factory set to turn light unit on at 1.5 to 3 fc and off at 4.5 to 10 fc with 15-second minimum time delay. Relay shall have directional lens in front of photocell to prevent artificial light sources from causing false turnoff.
1. Relay with locking-type receptacle shall comply with NEMA C13.
2. Adjustable window slide for adjusting on-off set points.
2.4 BALLASTS FOR HID LAMPS
A. Comply with ANSI C82.4 and UL 1029 and capable of open-circuit operation without reduction of average lamp life. Include the following features, unless otherwise indicated:
1. Ballast Circuit: Constant-wattage autotransformer or regulating high-power-factor type.
2. Minimum Starting Temperature: Minus 22 deg F.
3. Normal Ambient Operating Temperature: 104 deg F.
4. Ballast Fuses: One in each ungrounded power supply conductor. Voltage and current ratings as recommended by ballast manufacturer.
B. Auxiliary, Instant-On, Quartz System: Factory-installed feature automatically switches quartz lamp on when fixture is initially energized and when momentary power outages occur. System automatically turns quartz lamp off when HID lamp reaches approximately 60 percent of light output.
2.5 HID LAMPS
A. Metal-Halide Lamps: ANSI C772, with a minimum CRI 65, and color temperature 4000 K.
2.6 POLES AND SUPPORT COMPONENTS, GENERAL REQUIREMENTS
A. Structural Characteristics: Comply with AASHTO LTS-4.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 7
1. Wind-Load Strength of Poles: Adequate at indicated heights above grade without failure, permanent deflection, or whipping in steady winds of speed indicated in Part 1 "Structural Analysis Criteria for Pole Selection" Article, with a gust factor of 1.3.
2. Strength Analysis: For each pole, multiply the actual equivalent projected area of luminaires and brackets by a factor of 1.1 to obtain the equivalent projected area to be used in pole selection strength analysis.
B. Luminaire Attachment Provisions: Comply with luminaire manufacturers' mounting requirements. Use stainless-steel fasteners and mounting bolts, unless otherwise indicated.
C. Mountings, Fasteners, and Appurtenances: Corrosion-resistant items compatible with support components.
1. Materials: Shall not cause galvanic action at contact points.
2. Anchor Bolts, Leveling Nuts, Bolt Caps, and Washers: Hot-dip galvanized after fabrication, unless stainless-steel items are indicated.
3. Anchor-Bolt Template: Plywood or steel.
D. Concrete Pole Foundations: Cast in place, with anchor bolts to match pole-base flange. Concrete, reinforcement, and formwork are specified in Division 03 Section "Cast-in-Place Concrete."
2.7 ALUMINUM POLES
A. Poles: Seamless, extruded structural tube complying with ASTM B 429, Alloy 6063- T6 with access handhole in pole wall.
B. Poles: ASTM B 209, 5052-H34 marine sheet alloy with access handhole in pole wall.
1. Shape: Round, tapered.
2. Mounting Provisions: Butt flange for bolted mounting on foundation or breakaway support.
C. Pole-Top Tenons: Fabricated to support luminaire or luminaires and brackets indicated, and securely fastened to pole top.
D. Grounding and Bonding Lugs: Welded 1/2-inch threaded lug, complying with requirements in Division 26 Section "Grounding and Bonding for Electrical Systems," listed for attaching grounding and bonding conductors of type and size listed in that Section, and accessible through handhole.
E. Brackets for Luminaires: Detachable, with pole and adapter fittings of cast aluminum.
Adapter fitting welded to pole and bracket, then bolted together with stainless-steel bolts.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 8
1. Tapered oval cross section, with straight tubular end section to accommodate luminaire.
2. Finish: Same as pole.
F. Prime-Coat Finish: Manufacturer's standard prime-coat finish ready for field painting.
G. Aluminum Finish: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
1. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes.
2. Natural Satin Finish: Provide fine, directional, medium satin polish (AA-M32);
buff complying with AA-M20; and seal aluminum surfaces with clear, hard-coat wax.
3. Class I, Clear Anodic Finish: AA-M32C22A41 (Mechanical Finish: medium satin; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class I, clear coating 8 mm or thicker) complying with AAMA 611.
4. Class I, Color Anodic Finish: AA-M32C22A42/A44 (Mechanical Finish:
medium satin; Chemical Finish: etched, medium matte; Anodic Coating:
Architectural Class I, integrally colored or electrolytically deposited color coating 8 mm or thicker) complying with AAMA 611.
a. Color: Dark bronze unless otherwise specified in Lighting Fixture Schedule on the Drawings.
2.8 POLE ACCESSORIES
A. Base Covers: Manufacturers' standard metal units, arranged to cover pole's mounting bolts and nuts. Finish same as pole.
PART 3 - EXECUTION
3.1 LUMINAIRE INSTALLATION
A. Install lamps in each luminaire.
B. Fasten luminaire to indicated structural supports.
1. Use fastening methods and materials selected to resist seismic forces defined for the application and approved by manufacturer.
C. Adjust luminaires that require field adjustment or aiming. Include adjustment of photoelectric device to prevent false operation of relay by artificial light sources.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 9
3.2 POLE INSTALLATION
A. Align pole foundations and poles for optimum directional alignment of luminaires and their mounting provisions on the pole.
B. Concrete Pole Foundations: Set anchor bolts according to anchor-bolt templates furnished by pole manufacturer. Concrete materials, installation, and finishing requirements are specified in Division 03 Section "Cast-in-Place Concrete."
3.3 BOLLARD LUMINAIRE INSTALLATION
A. Align units for optimum directional alignment of light distribution.
B. Install on concrete base with top 4 inches above finished grade or surface at bollard location. Cast conduit into base, and shape base to match shape of bollard base.
Finish by troweling and rubbing smooth. Concrete materials, installation, and finishing are specified in Division 03 Section "Cast-in-Place Concrete."
3.4 INSTALLATION OF INDIVIDUAL GROUND-MOUNTING LUMINAIRES
A. Install on concrete base with top 4 inches above finished grade or surface at luminaire location. Cast conduit into base, and finish by troweling and rubbing smooth. Concrete materials, installation, and finishing are specified in Division 03 Section "Cast-in-Place Concrete."
3.5 CORROSION PREVENTION
A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with a dissimilar metal, protect aluminum by insulating fittings or treatment.
3.6 GROUNDING
1. Install grounding conductor pigtail in the base for connecting luminaire to grounding system.
3.7 FIELD QUALITY CONTROL
A. Inspect each installed fixture for damage. Replace damaged fixtures and components.
B. Illumination Observations: Verify normal operation of lighting units after installing luminaires and energizing circuits with normal power source.
1. Verify operation of photoelectric controls.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
EXTERIOR LIGHTING 265600- 10
C. Tests and Observations: Verify normal operation of lighting units after installing luminaries and energizing circuits with normal power source, and as follows:
1. Measure tight intensities at night if specific illumination performance is indicated. Use photometers with calibration referenced to NIST standards.
2. Check intensity and uniformity of illumination.
3. Check excessively noise ballasts.
D. Prepare a written report of tests, inspections, observations, and verifications indicating and interpreting results. If adjustments are made to lighting system, retest to demonstrate compliance with standards.
3.8 CLEANING AND ADJUSTING
A. Clean units after installation. Use methods and materials recommended by manufacturer.
B. Adjust amiable luminaries and luminaries with adjustable lamp position top provide required light distributions and intensities.
END OF SECTION 265600