Text version
F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
LIGHTNING PROTECTION FOR STRUCTURES 264113 - 1
SECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes lightning protection for structures.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: For air terminals and mounting accessories.
1. Layout of the lightning protection system, along with details of the components to be used in the installation.
2. Include indications for use of raceway, data on how concealment requirements will be met, and calculations required by NFPA 780 for bonding of grounded and isolated metal bodies.
C. Qualification Data: For qualified Installer and manufacturer. Include data on listing or certification by UL.
D. Certification, signed by Contractor, that roof adhesive is approved by manufacturer of roofing material.
E. Field quality-control reports.
F. Comply with recommendations in NFPA 780, Annex D, "Inspection and Maintenance of Lightning Protection Systems," for maintenance of the lightning protection system.
G. Other Informational Submittals: Plans showing dimensioned as-built locations of grounding features, including the following:
1. Ground rods.
2. Ground loop conductor.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
LIGHTNING PROTECTION FOR STRUCTURES 264113 - 2
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Certified by UL, trained and approved for installation of units required for this Project.
B. System Certificate:
1. UL Master Label.
2. LPI System Certificate.
3. UL Master Label Recertification.
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 780, "Definitions" Article.
1.5 COORDINATION
A. Coordinate installation of lightning protection with installation of other building systems and components, including electrical wiring, supporting structures and building materials, metal bodies requiring bonding to lightning protection components, and building finishes.
B. Coordinate installation of air terminals attached to roof systems with roofing manufacturer and Installer.
C. Flashings of through-roof assemblies shall comply with roofing manufacturers' specifications.
PART 2 - PRODUCTS
2.1 LIGHTNING PROTECTION SYSTEM COMPONENTS
A. Comply with UL 96 and NFPA 780.
B. Roof-Mounted Air Terminals: NFPA 780, Class I, aluminum unless otherwise indicated.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. East Coast Lightning Equipment Inc.
b. ERICO International Corporation.
c. Harger.
d. Heary Bros. Lightning Protection Co. Inc.
e. Independent Protection Co.
f. Preferred Lightning Protection.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
LIGHTNING PROTECTION FOR STRUCTURES 264113 - 3
g. Robbins Lightning, Inc.
h. Thompson Lightning Protection, Inc.
2. Air Terminals More than 24 Inches Long: With brace attached to the terminal at not less than half the height of the terminal.
3. Single-Membrane, Roof-Mounted Air Terminals: Designed specifically for single-membrane roof system materials. Comply with requirements in Division 07 roofing Sections.
C. Main and Bonding Conductors: Copper.
D. Ground Loop Conductor: The same size and type as the main conductor except tinned.
E. Ground Rods: Copper-clad steel; 3/4 inch in diameter by 10 feet long.
F. Heavy-Duty, Stack-Mounted, Lightning Protection Components: Stainless steel.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install lightning protection components and systems according to UL 96A and
NFPA 780.
B. Install conductors with direct paths from air terminals to ground connections. Avoid sharp bends.
C. Conceal the following conductors:
1. System conductors.
2. Down conductors.
3. Interior conductors.
4. Conductors within normal view of exterior locations at grade within 200 feet of building.
D. Cable Connections: Use crimped or bolted connections for all conductor splices and connections between conductors and other components. Use exothermic-welded connections in underground portions of the system.
E. Cable Connections: Use exothermic-welded connections for all conductor splices and connections between conductors and other components.
1. Exception: In single-ply membrane roofing, exothermic-welded connections may be used only below the roof level.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
LIGHTNING PROTECTION FOR STRUCTURES 264113 - 4
F. Air Terminals on Single-Ply Membrane Roofing: Comply with roofing membrane and adhesive manufacturer's written instructions.
G. Bond extremities of vertical metal bodies exceeding 60 feet in length to lightning protection components.
H. Ground Loop: Install ground-level, potential equalization conductor and extend around the perimeter of structure.
1. Bury ground ring not less than 24 inches from building foundation.
2. Bond ground terminals to the ground loop.
3. Bond grounded building systems to the ground loop conductor within 12 feet of grade level.
I. Bond lightning protection components with intermediate-level interconnection loop conductors to grounded metal bodies of building at 60-foot intervals.
3.2 CORROSION PROTECTION
A. Do not combine materials that can form an electrolytic couple that will accelerate corrosion in the presence of moisture unless moisture is permanently excluded from junction of such materials.
B. Use conductors with protective coatings where conditions cause deterioration or corrosion of conductors.
3.3 FIELD QUALITY CONTROL
A. Notify Architect at least 48 hours in advance of inspection before concealing lightning protection components.
B. UL Inspection: Meet requirements to obtain a UL Master Label for system.
C. LPI System Inspection: Meet requirements to obtain an LPI System Certificate.