014000 quality requirements.pdf

PDF 25 KB Posted

Attached to
CONSTRUCT USPFO WAREHOUSE
Solicitation number
W91364-09-B-0003
Issued by

About this file

014000 quality requirements.pdf

View the file

Other files

File Type Posted
ADDENDUM NO 03 USPFO Narrative.pdf PDF
ADDENDUM NO 03 CSMS PH II Narrative.pdf PDF
USPFO_S201W.pdf PDF
E101.pdf PDF
E404.pdf PDF
USPFO_S002W.pdf PDF
262726 wiring devices.pdf PDF
000 USPFO Specs Combined.pdf PDF
220519 meters and gages for plumbing piping.pdf PDF
USPFO_S401W.pdf PDF
013300d attachment submittal register.pdf PDF
095113 acoustical panel ceilings.pdf PDF
224500 emergency plumbing fixtures.pdf PDF
015000 temporary facilities and controls.pdf PDF
072410 polymer-based exterior finish system —
C500.pdf PDF
USPFO_F303W.pdf PDF
USPFO_M401W.pdf PDF
USPFO_FA602W.pdf PDF
OHARNG-USPFO-A-212bW .pdf PDF
079200 joint sealants.pdf PDF
OHARNG-USPFO-A-724W .pdf PDF
I101.pdf PDF
USPFO_P601W.pdf PDF
088500 decorative film for glass.pdf PDF
OHARNG-USPFO-A-816W .pdf PDF
079500 expansion control.pdf PDF
013100 project management and coordination.pdf PDF
OHARNG-USPFO-A-415W .pdf PDF
099113 exterior painting.pdf PDF
USPFO_S212W.pdf PDF
012300 optional bid items.pdf PDF
220548 vibration and seismic controls for plumbing piping and equipment.pdf PDF
220529 hangers and supports for plumbing piping and equipment.pdf PDF
104416 fire extinguishers.pdf PDF
230553 identification for hvac piping and equipment.pdf PDF
263323 central battery equipment.pdf PDF
275116 public address system.pdf PDF
OHARNG-USPFO-G-115W .pdf PDF
OHARNG_USPFO_Q203W.pdf PDF
E502.pdf PDF
018113 sustainable design requirements.pdf PDF
210500 common work results for fire suppression.pdf PDF
OHARNG-USPFO-G-120W .pdf PDF
260543 underground ducts and raceways for electrical systems.pdf PDF
262816 enclosed switches and circuit breakers.pdf PDF
OHARNG-USPFO-A-710W .pdf PDF
E302.pdf PDF
C200.pdf PDF
019113 general commissioning requirements.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and -control requirements for individual construction ac-tivities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Con-tract Document requirements.

3. Requirements for Contractor to provide quality-assurance and -control services re-quired by Government are not limited by provisions of this Section.

C. Related Sections include the following:

1. Section 013200 "Construction Progress Documentation" for developing a schedule of required tests and inspections.

2. Section 017329 "Cutting and Patching" for repair and restoration of construction disturbed by testing and inspecting activities.

3. Divisions 02 through 34 Sections for specific test and inspection requirements.

1.2 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substanti-ate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Contracting Officer.

C. Mockups: Full-size, physical assemblies that are constructed on-site. Mockups are used to verify selections made under sample submittals, to demonstrate aesthetic ef-fects and, where indicated, qualities of materials and execution, and to review con-struction, coordination, testing, or operation; they are not Samples. Approved mockups establish the standard by which the Work will be judged.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 2

D. Laboratory Mockups: Full-size, physical assemblies that are constructed at testing fa-cility to verify performance characteristics.

E. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify perform-ance or compliance with specified criteria.

F. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities hav-ing jurisdiction, to establish product performance and compliance with industry stan-dards.

G. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

H. Field Quality-Control Testing: Tests and inspections that are performed on-site for in-stallation of the Work and for completed Work.

I. Testing Agency: An entity engaged to perform specific tests, inspections, or both.

Testing laboratory shall mean the same as testing agency.

J. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding ge-neric name, such as "carpenter." It also does not imply that requirements speci-fied apply exclusively to tradespeople of the corresponding generic name.

K. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project;

being familiar with special requirements indicated; and having complied with require-ments of authorities having jurisdiction.

1.3 CONFLICTING REQUIREMENTS

A. General: If compliance with two or more standards is specified and the standards es-tablish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contracting Officer for a decision before proceed-ing using specified RFI format, or format approved by Contracting Officer.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply ex-actly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer un-certainties to Contracting Officer for a decision before proceeding.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 3

1.4 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized author-ity. Government shall contract directly with testing agency.

B. Schedule of Tests and Inspections: Prepare in tabular form and include the following:

1. Specification Section number and title.

2. Description of test and inspection.

3. Identification of applicable standards.

4. Identification of test and inspection methods.

5. Number of tests and inspections required.

6. Time schedule or time span for tests and inspections.

7. Entity responsible for performing tests and inspections.

8. Requirements for obtaining samples.

9. Unique characteristics of each quality-control service.

C. Reports: Prepare and submit certified written reports that include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

D. Permits, Licenses, and Certificates: For Government's records, submit copies of per-mits, licenses, certifications, inspection reports, releases, jurisdictional settlements, no-tices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on per-formance of the Work.

1.5 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 4

B. Installer Qualifications: A firm or individual experienced in installing, erecting, or as-sembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service per-formance.

C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service per-formance, as well as sufficient production capacity to produce required units.

D. Fabricator Qualifications: A firm experienced in producing products similar to those in-dicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent.

F. Specialists: Certain sections of the Specifications require that specific construction ac-tivities shall be performed by entities who are recognized experts in those operations.

Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirement for specialists shall not supersede building codes and regulations governing the Work.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as docu-mented according to ASTM E 548; and with additional qualifications specified in indi-vidual Sections; and where required by authorities having jurisdiction, that is accept-able to authorities. Government shall contract directly with testing agency.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary

Laboratory Accreditation Program.

H. Factory-Authorized Service Representative Qualifications: An authorized representa-tive of manufacturer who is trained and approved by manufacturer to inspect installa-tion of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following:

1. Contractor responsibilities include the following:

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 5

a. Provide test specimens representative of proposed products and construc-tion.

b. Submit specimens in a timely manner with sufficient time for testing and ana-lyzing results to prevent delaying the Work.

c. Provide sizes and configurations of test assemblies, mockups, and labora-tory mockups to adequately demonstrate capability of products to comply with performance requirements.

d. Build site-assembled test assemblies and mockups using installers who will perform same tasks for Project.

e. Build laboratory mockups at testing facility using personnel, products, and methods of construction indicated for the completed Work.

f. When testing is complete, remove test specimens, assemblies, mockups, and laboratory mockups; do not reuse products on Project.

2. Testing Agency Responsibilities: Submit a certified written report of each test, in-spection, and similar quality-assurance service to Contracting Officer, with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by Contracting Officer.

2. Notify Contracting Officer seven days in advance of dates and times when mock-ups will be constructed.

3. Demonstrate the proposed range of aesthetic effects, quality and workmanship.

4. Obtain Contracting Officer's approval of mockups before starting work, fabrication, or construction.

a. Allow seven days for initial review and each re-review of each mockup.

5. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

6. Demolish and remove mockups when directed, unless otherwise indicated.

7. Include the following mockups:

a. Window mockup with flashing details.

b. Roofing system mockup with flashing.

c. Metal Wall Panels

K. Laboratory Mockups: Comply with requirements of preconstruction testing and those specified in individual Sections in Divisions 02 through 34.

1.6 QUALITY CONTROL

A. Contractor Responsibilities: Contractor will engage a qualified testing agency to per-form testing services.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 6

1. Contractor will furnish Goverment with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

2. Payment for these services will be made by the Contractor.

3. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Con-tractor.

4. Testing and inspecting requested by Contractor and not required b the Contract are Contractor's responsibility.

5. Notify testing agencies at least 24 hours in advance of time when Work that re-quires testing or inspecting will be performed.

6. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

B. Retesting/Reinspecting: Regardless of whether original tests or inspections were Con-tractor's responsibility, provide quality-control services, including retesting and rein-specting, for construction that replaced Work that failed to comply with the Contract Documents.

C. Testing Agency Responsibilities: Cooperate with Contracting Officer and Contractor in performance of duties. Provide qualified personnel to perform required tests and in-spections.

1. Notify Contracting Officer and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform any duties of Contractor.

D. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as re-quested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Delivery of samples to testing agencies.

6. Preliminary design mix proposed for use for material mixes that require control by testing agency.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 7

7. Security and protection for samples and for testing and inspecting equipment at Project site.

E. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of re-moving and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

F. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and simi-lar quality-control services required by the Contract Documents. Submit schedule within 30 days after Contract award.

1. Distribution: Distribute schedule to Contracting Officer, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.

1.7 SPECIAL TESTS AND INSPECTIONS

A. Special Tests and Inspections: Contractor will engage a qualified testing agency to conduct special tests and inspections required by Government, and as follows:

1. Verifying that manufacturer maintains detailed fabrication and quality-control pro-cedures and reviewing the completeness and adequacy of those procedures to perform the Work.

2. Notifying Contracting Officer and Contractor promptly of irregularities and deficien-cies observed in the Work during performance of its services.

3. Submitting a certified written report of each test, inspection, and similar quality-control service to Contracting Officer with copy to Contractor and to authorities having jurisdiction.

4. Submitting a final report of special tests and inspections at beneficial occupancy, which includes a list of unresolved deficiencies.

5. Interpreting tests and inspections and stating in each report whether tested and in-spected work complies with or deviates from the Contract Documents.

6. Retesting and reinspecting corrected work at no cost to Government.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted.

2. Description of the Work tested or inspected.

3. Date test or inspection results were transmitted to Contracting Officer.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

QUALITY REQUIREMENTS 014000 – 8

4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and inspection log for Contracting Officer's reference during normal working hours.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, re-pair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoin-ing areas with durable seams that are as invisible as possible.

2. Comply with the Contract Document requirements for Section 017329 "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 014000