RFIs dated 8 August 2019

View the file

Other files

File Type Posted
Abstract_OF1419_W912SV19B5002.pdf PDF
Bid_Opening_Sign_In_Sheet.pdf PDF
W912SV19B5002_Amendment_0002.pdf PDF
AXQD132712_Drawings_20190808.pdf PDF
W912SV-19-R-5002_Site_Visit_Sign-In_Sheet.pdf PDF
JA_Best_Access_System_Key.pdf PDF
JA_SNE.pdf PDF
JA_Advantor.pdf PDF
JA_Monaco.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AXQD132712 -- W912SV19B5002

RFI Questions and Responses

8 August 2019

1. Refer to section 12 61 16 – Upholstered Audience Seating.

a. The spec section states that the Basis of Design is Model 7.71, however, the description in the specs describe an auditorium style seat more like model 90.12.86 or 91.12.00 shown on page 8 of the attached pdf brochure. Please confirm model number.

Response: Specification is not unduly incompatible with basis of design.

b. Please confirm fabric mill and pattern.

Response: Fabric mill and pattern to be selected during submittal process.

c. Please confirm row spacing so proper clearance can be determined.

Response: per specification Section 12 61 13, seating plans are to be submitted for approval, including row spacing.

2. Drawing E-601 calls for us to replace the main switch board MDP with a new 1200Amp switch board MSWBD is it going in same location or a new location.

Response: Yes, confirmed same location.

3. How long can the service be shut down for?

Response: The facility will continue to be occupied in the nic areas, including the OPS desk, which oversees flying operations. All outages will have to be coordinated with the Contracting

Officer. Per specification 01 35 26, outages must be submitted 5 days in advance.

4. Drawing E-602 shows a new 400Amp feeder going to an existing generator outlet. Please provide a location on the floor plan.

Response: The generator outlet is located on the exterior north wall of the Equipment

Courtyard Room 159. Very near to the double doors into Electrical Room 158.

5. Drawing E-602 shows a new 2500Amp feeder going to an existing 400Amp disconnect. Please

Response: The new 250A feeder is going to the existing disconnect switch adjacent to the ATS in the Equipment Courtyard Room 159.

6. Drawing E-602 shows a new 400Amp feeder going to an existing panel C1. Please provide a location on the floor plan.

Response: C1 is located on the north wall of Chute/FAB Room 150. See E-111A.

7. Drawing E-602 shows a new 400Amp feeder going to an existing 12”x12” Wireway. Please

Response: The wireway is located directly above panels HP and BP1 in Electrical Room 158

(panels shown on E-401).

AXQD132712 -- W912SV19B5002

RFI Questions and Responses

8 August 2019

8. Drawing E602 calls for us to refeed existing loads can we reuse the existing raceway, or does it need to be replaced?

Response: Provide new raceway as indicated (the conduit and conductor sizes being replaced are bold and correlate to the chart of the same sheet, E-602).

9. Can the AISC certification for steel fabrication and erection be waived?

Response: No, the certification cannot be waived.

10. Please confirm that Bid item no 0002 is for both communication and security systems as it is shown on Drawing T001 (Bid notes)?

Response: Drawing T001 was amended with a date of 8 August 2019.

11. Please clarify that bid item no 0002 is either base bid or option item?

Response: Line Item 0002 is a required line and is not an option item.

12. Is there any possibility that the project duration can be extended?

Response: The project duration cannot be extended.