Justification and Approval - Monaco

View the file

Other files

File Type Posted
Abstract_OF1419_W912SV19B5002.pdf PDF
Bid_Opening_Sign_In_Sheet.pdf PDF
AXQD132712_Drawings_20190808.pdf PDF
RFI_20190808_AXQD132712.pdf PDF
W912SV19B5002_Amendment_0002.pdf PDF
W912SV-19-R-5002_Site_Visit_Sign-In_Sheet.pdf PDF
JA_SNE.pdf PDF
JA_Best_Access_System_Key.pdf PDF
JA_Advantor.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No: 19-5002 MON

Justification Review Document for Other Than Full and Open Competition

Program/Equipment: Monaco Enterprises Fire Alarm System

Authority: FAR 6.302-1(a)(2)(iii)(A) and FAR 6.302-1(a)(2)(iii)(A) – Only One Responsible

Source and No Other Supplies or Services Will Satisfy Agency Requirements for the listed equipment and the installation.

Amount: $37,300

Prepared by:

Typed Name: Maj Jeremy Dugan DSN: _698-1737_____________

Title: Civil Engineer Date: _6 Mar 19______________

E-mail: jeremy.j.dugan2.mil@mail.mil

Contracting Officer:

Typed Name: Erika Reinikainen-Rovinelli DSN: ______________________

Date Reviewed: ___________________

E-Mail: erika.l.reinikainen-rovinelli.civ@mail.mil

Technical Representative:

Typed Name: Maj Jeremy Dugan DSN: _698-1737_____________

Title: Civil Engineer Date Reviewed: 6 Mar 19______

Reviews: I have reviewed this justification and find it adequate to support other than full and open competition.

Legal Counsel – Not Required

Typed Name: DSN: ______________________

Signature: ______________________ Date: ______________________

Special Competition Advocate

Typed Name: DSN: ______________________

Signature: ______________________ Date: ______________________

2 |5

JA - SNE – Renovate Building 25 Control No: 19-5002 MON

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

Monaco Fire Systems

1. Contracting Activity: 104the Fighter Wing, 175 Falcon Dr, Westfield, MA, 01085-1482

2. Description of Action:

The 104th Fighter Wing Contracting Office intends to award a firm-fixed price contract on or about 30

July 2019. Under the contract derived from solicitation number W912SV-19-B-5002. The project includes one brand name comments along with the sole source for the installation of the components.

3. Description of Supplies/Services:

The Government will require of the awardee, as part of the energy reduction measures to

a. Procure and install a brand-name requirement of Monaco Enterprises. This system is a single source solution for the fire alarm system (FAS).

b. Procure the services of Monaco Enterprises for the installation.

The work includes FAS components and parts for notification and alarms for fire safety. This includes communication back to the Fire Department on the existing system, new infrastructure internal to the building, and end-item equipment on or near facility entrances. Contractor shall verify compatibility and system completeness to ensure a complete system meeting the owner’s needs as described in the

Statement of Work.

4. Authority Cited:

The statutory authority permitting Other than Full and Open Competition is 10 U.S.C. 2304(c)(1) as implemented by FAR 6.203-1, Only one responsible source and no other supplies or services will satisfy agency requirements. It is likely that any other source would result in substantial duplication of cost to the Government that will not be recovered through competition.

5. Reason for Authority Cited:

a. FAR 6.302-1(c) provides the use of brand name descriptions when the requirement can only be met by one brand name product the current product is an FAS. The use of a single product line/manufacturer enables the systematic management and seamless operation of our IDS/ACS within the facilities. Utilizing the common product line for our IDS/ACS within our facilities allow for reduced staff to operate and maintain our IDS/ASC as well as the equipment the IDS/ACS interfaces with. This results in reduced maintenance and training costs over the lifecycle of the building. Departing from the standardization would not be sustainable, and would be detrimental to the organization. The estimate to purchase the equipment is approximately $8,000.

b. Monaco is the only known source for additional system integration and upgrade to the FAS that is presently in operation at Barnes Any other manufacturer would void the warranty and could result in conflict issues and ability to have the system work. The estimate to install the equipment is approximately $29,300.

6. Efforts to Obtain Competition:

The solicitation for the Renovate Bldg 25 project will be a competitive Invitation for Bid (IFB) set aside for small businesses. The brand name components represent a small portion, less than 5% of the overall construction project that is being competed.

3 |5

Control No: 19-5002 MON

7. Actions to Increase Competition:

This J&A will be posted to FedBizOpps with the solicitation and potential suppliers may have the opportunity to propose compatible products for consideration.

8. Market Research:

The following market research techniques were conducted within the previous 12 months.

Project AXQD082415 was completed and used Monaco Enterprises for the fire alarm system, which was approximately $100,000. This project on the main hangar was more complicated than this effort.

During multiple contracts acquisitions, other fire alarm system manufacturers and installers have been contacted. All have stated they cannot install Monaco parts and their parts are not compatible with the Monaco FAS.

9. Interested Sources:

To date, no other sources have written to express an interest. There are no known alternative systems that are fully compatible with the aforementioned systems based upon lessons learned and experience of the Barnes Air National Guard and National Guard Bureau.

10. Other Facts:

Per UFC 3-600-1, para 5-2.3, “Alarm reporting systems must conform to NFPA 72 National Fire Alarm and Signaling code, NFPA 70, National Electric Code and must provide the following where applicable.

Transmitters must be listed or approved for use with the existing base reporting system. Barns ANG is currently using the Monaco system and is compatible with the complete fire alarm system and has proven reliable over the years with the system already installed. The base currently has multiple Monaco Fire

Alarm panels installed, which assists emergency personnel to know only one panel type. This improves response time for any life safety issues that could occur. It also reduces cost of repair and maintenance by having only one type of system to operate, maintain, and have bench stock on hand.

4 |5

11. Technical Certification:

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Jeremy J. Dugan, Maj, MA ANG Date: 6 Mar 19

Title: Base Civil Engineer Signature:

12. Requirements Certification:

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief:

Typed Name: Jeremy J. Dugan, Maj, MA ANG Date: 6 Mar 19

Title: Base Civil Engineer Signature:

13. Fair and Reasonable Cost Determination:

I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. The basis of determination is made based on a technical review/cost analysis by Jeremy

Dugan and Dana Thayer with their knowledge of the same equipment and service for other ANG facilities on Barnes ANG.

Typed Name: Erika Reinikainen-Rovinelli Date:

Title: Contracting Officer Signature:

14. Contracting Officer Certification:

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Typed Name: Erika Reinikainen-Rovinelli Date:

Title: Contracting Officer Signature:

5 |5

Approval

Based on the foregoing justification, I hereby approve the procurement of the Monaco Fire Alarm panels and devices and services of Monaco Enterprises, on the other than full and open competition basis pursuant to the authority of 10. U.S.C. 2304(c)(1), FAR Part 6.302+-1(a)(2)(ii)(A) and 6.302-

1(a)(2)(iii)(A), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency

Requirements, subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.

Date: Signature:

Name: Erika Reinikainen-Rovinelli

Text31:
Text32:
Text33:
Text34:
Text35:
DATE1: 28 Mar 19
DATE6: 28 Mar 19
DATE5: 28 Mar 19
DATE4: 28 Mar 19
DATE3:
DATE2:
2019-03-28T09:14:15-0400
REINIKAINEN-ROVINELLI.ERIKA.LEE.1010526996
2019-03-28T09:14:34-0400
REINIKAINEN-ROVINELLI.ERIKA.LEE.1010526996
2019-03-06T12:42:13-0500
DUGAN.JEREMY.JAMES.1254046139
2019-03-06T12:42:22-0500
DUGAN.JEREMY.JAMES.1254046139
2019-03-28T09:17:13-0400
REINIKAINEN-ROVINELLI.ERIKA.LEE.1010526996

File details come from the government source that posted it.