W912PQ19B9000_0007.pdf

PDF 516 KB Posted

Attached to
Construct Exterior Lighting Federal contract opportunity
Solicitation number
W912PQ19B9000
Issued by
Department of the Army New York Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Exterior Lighting, newest first.
File Type Posted
Abstract_-_Construct_Exterior_Lighting.pdf PDF
Attendance_Sheet.pdf PDF
W912PQ19B9000_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0004.pdf PDF
W912PQ19B9000_0003.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
W912PQ19B9000_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
W912PQ19B9000_0007.pdf PDF
W912PQ19B9000_0001.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0006.pdf PDF
Amendment_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
SF24-16.pdf PDF
W912PQ19B9000_0004.pdf PDF
W912PQ19B9000_0003.pdf PDF
W912PQ19B9000_0003.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
PREBID_Slides.pdf PDF
Attendance_Sheet_Page_1_&_2.pdf PDF
Specifications_-_April_2018.pdf PDF
W912PQ19B9000.pdf PDF
Drawings_-_April_2018.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to answ er Request for Information (RFI) 24 to 29 and to extend the bid due date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Mar-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PQ19B9000

X 9B. DATED (SEE ITEM 11)

01-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2019

CODE

106 NEW YORK AIR NATIONAL GUARD

106 MSG/MSC - WAWF W912PQ

150 RIVERHEAD ROAD

WESTHAMPTON BEACH NY 11978-1201

W912PQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PQ19B9000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI

Question 24 - Please clarify if Contractor is responsible for the Concrete, Concrete Reinforcement and Soil Testing for this Project or will it be done by Government.

Answer 24 - Yes, the contractor is responsible for concrete, concrete reinforcement and soil testing.

Question 25 - Reference is made to drawing E-001 General Notes # 1, 2, 9, 14, 15 & 16 all make reference to utility outages and providing temporary power. However, the bid documents do not specify why or how power to any of the buildings power would be disrupted since the power interaction is only for lighting circuits. Please clarify.

Answer 25 - The “Site Work Notes” referred to are general in nature and the Contractor shall be required to shut down circuits within panels in noted buildings. Electrical service shut down to these buildings should not be required. If in the event or circumstance that complete power to a building is required to be shut off, then the Contractor will coordinate with the Base CE a minimum 48 hours prior to the shutdown. As noted, provisions for temporary power will be provided by the Contractor for any period over 6 hours.

Question 26 - Drawing E-001 General note 12 make reference to excavation which traverse roadways.

However note 17 states that all conduits under paved areas required for this project were installed under the previous contract # WKVB182092 which would eliminate the need to excavate roadways and other paved areas. Please clarify.

Answer 26 - As noted in “Site Work Notes” number 17, all of the underground conduit has been installed under a separate contract for the lighting contract. The Contractor will not have to excavate or open any roadways for the installation of conduit or wire under this contract.

Question 27 - Regarding the sample fixture, will the base give the fixture back to use to install or do we need to add one additional fixture per type to our bid.

Answer 27 - Contractor shall provide one sample of each light fixture to the Base CE. The fixture will not be utilized in the installation of work associated with the contract.

Question 28 - What is the size of the conduit to be used for all underground runs, panel schedule states 2” but on bid proposal 0002 states ¾?

Answer 28 - The contract drawings note on sheets ES101 – ES105 to provide two-inch underground, direct bury PVC conduit.

Queston 29 - Are the poles along the main road by property line feed from overhead?

Answer 29 - All site light poles are fed from underground including those adjacent to the perimeter fence along Old Riverhead Road.

W912PQ19B9000

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 07-Mar-2019 01:00 PM to 12-Mar-2019 12:00 PM.

(End of Summary of Changes)