W912PQ19B9000_0001.pdf

PDF 716 KB Posted

Attached to
Construct Exterior Lighting Federal contract opportunity
Solicitation number
W912PQ19B9000
Issued by
Department of the Army New York Army National Guard

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Construct Exterior Lighting, newest first.
File Type Posted
Attendance_Sheet.pdf PDF
Abstract_-_Construct_Exterior_Lighting.pdf PDF
W912PQ19B9000_0007.pdf PDF
W912PQ19B9000_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0004.pdf PDF
W912PQ19B9000_0003.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
W912PQ19B9000_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
W912PQ19B9000_0007.pdf PDF
W912PQ19B9000_0005.pdf PDF
W912PQ19B9000_0006.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0001.pdf PDF
Amendment_0006.pdf PDF
W912PQ19B9000_0005.pdf PDF
SF24-16.pdf PDF
W912PQ19B9000_0004.pdf PDF
W912PQ19B9000_0003.pdf PDF
W912PQ19B9000_0002.pdf PDF
W912PQ19B9000_0003.pdf PDF
PREBID_Slides.pdf PDF
Attendance_Sheet_Page_1_&_2.pdf PDF
Specifications_-_April_2018.pdf PDF
W912PQ19B9000.pdf PDF
Drawings_-_April_2018.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PQ19B9000

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to answ er Request for Information (RFI) 1-8.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PQ19B9000

X 9B. DATED (SEE ITEM 11)

01-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2019

CODE

106 NEW YORK AIR NATIONAL GUARD

106 MSG/MSC - WAWF W912PQ

150 RIVERHEAD ROAD

WESTHAMPTON BEACH NY 11978-1201

W912PQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI 1-8

Request for Information 1-8 Question 1- E-001 of ED-101and E-002 of ED-102 Says demolish all conduit and wiring associated with security cameras back to source—Where is the source for security cameras located.

Answer 1- Security cameras are wired back to the Comm Room E051 in BDOC in Building 250. Coordinate location of security panels with Security Forces prior to removal.

Question 2- E-003 of ED-101 says remove floodlights on light poles. Wiring and supports to be removed back to source—looks like all the wiring is underground, Do we have to break everything to take out the wiring or just disconnect power to the wire and remove back to ground and leave everything that’s in the ground.

Answer 2- Bidders are to disconnect power and remove wiring entirely. Any subsurface conduit shall be abandoned in place. Bidders are not to disturb recently improved parking lot and/or roadway pavements.

Question 3- E-007 of ED-103 says remove light pole conduits, wiring, supports back to source?------How far is the source?----- looks like all the wiring is underground, Do we have to break everything to take out the wiring or just disconnect power to the wire and remove back to ground and leave everything that’s in the ground

Answer 3- Power source for the noted fixture is in Building 345. Bidders are to disconnect power and remove wiring entirely. Any subsurface conduit shall be abandoned in place. Bidders are not to disturb recently improved parking lot and/or roadway pavements. Coordinate location of the panelboard serving the light pole with the Base Electrician prior to removal.

Question 4- E-003 of ED-105 says cobra head, wiring and supports to be removed back to source .existing utility pole overhead wiring and concrete base to remain---How far is the source?----overhead wiring is mentioned which makes me think if it is being fed from underground or over head?-----existing utility pole to remain---is the light fixture mounted on utility pole.

Answer 4- Power source for the noted fixture is in Building 212. Light fixture is fed from underground. Both existing and proposed light fixture is mounted on existing utility pole to remain. Coordinate with PSEG-LI and the Base Electrician prior to removal and install of new fixture.

Question 5- E-004 of ES-101 says co-ordinate new pole locations with existing utility poles and overhead power and communication wiring---Are we feeding it from overhead wiring? Please explain

Answer 5- New branch circuiting for light poles and pole mounted lighting fixtures shall be installed underground as noted by the dashed lines on Drawing ES101. There is an existing PSEG-LI utility pole line with overhead lines that run within the base perimeter fence along Old Riverhead Road behind Building

250. Coordinate locations of the new light poles with the existing utility poles and overhead utility lines.

Question 6- E-008 of ED-105 says heads are coming out. pole, Base and wiring to remain but at the same locations E-004 of ES-105 says heads mount on new round tampered pole on existing concrete base.? Are we just installing new heads on existing poles or remove existing pole and install new pole and new heads.

Answer 6- Keyed Note E004 on Drawing ES105 to be revised as follows: “PROVIDE NEW LED AREA LIGHT FIXTURE AS NOTED. MOUNT TO NEW EXISTING ROUND TAPERED POLE ON EXISTING CONCRETE BASE AND CONNECT TO EXISTING WIRING. PROVIDE………RECOMMENDATIONS.” Fixtures are to be mounted to the existing poles.

Question 7- Note # E-001 of Drawing # ED-101 and note # E-003 of drawing # ED-102 call out the removal of the concrete base, however note # E-004 of Drawing # ES-101 and note # E-003 of Drawing # ES-102 calls for the coordination of a new pole location, but notes does not included information about installation of new concrete base. Please clarify if installation of new concrete base is a part of Contract, if yes please provide design of concrete base.

Answer 7- All proposed site light fixtures are to be installed on a newly constructed light pole base unless otherwise noted in the contract drawings to utilize the existing concrete bases. Existing poles 25006, 25007, 25008, and 25009 shall be removed in their entirety, including concreted bases. New bases, poles and lighting fixtures shall be provided as noted on Drawings ES101 and ES102. New branch circuiting for light poles and pole mounted lighting fixtures shall be installed underground as noted by the dashed lines on Drawing ES101. There is an existing PSEG-LI utility pole line with overhead lines that run within the base perimeter fence along Old Riverhead Road behind Building 250. Coordinate locations of the new light poles with the existing utility poles and overhead utility lines.

Refer to Detail 4 on Drawing E-501 for typical light pole installation detail, including concrete base.

Question 8- Drawing ED 101 note E001 and Drawing ED 102 note E003 both state "Demolish all conduit and wiring associated with security cameras back to source." Please provide information that identifies the location, routing and distance from the poles to the source for the security system noted.

Answer 8- Security cameras are wired back to the Comm Room E051 in BDOC in Building 250. Coordinate location of security panels with Security Forces prior to removal.

(End of Summary of Changes)

File details come from the government source that posted it.