W912PM24B0004_AMDT0003_WH Anchorage Basin_MOTSU_Final.pdf
PDF 1 MB Posted
- Solicitation number
- W912PM-24-B-0004
About this file
This document is an amendment to a solicitation for maintenance dredging of the Wilmington Harbor Anchorage Basin and Military Ocean Terminal, Sunny Point (MOTSU) in North Carolina. The purpose of this amendment is to update the specifications for the National Dredging Quality Management Program (DQM) requirements for scow monitoring.
Key details:
- The solicitation number is W912PM-24-B-0004, issued by the U.S. Army Corps of Engineers, Wilmington District.
- The work consists of maintenance dredging of the Wilmington Harbor Anchorage Basin (600,000 to 800,000 cubic yards) and various channels around MOTSU (500,000 to 700,000 cubic yards).
- The dredging depth for the Anchorage Basin is 42 feet plus 2 feet of allowable over-depth, using mechanical dredges only.
- There is an environmental window for dredging at MOTSU from October 1 to June 30, allowing for both mechanical and cutterhead pipeline dredges.
- The contractor is required to use the National Dredging Quality Management Program to monitor the status of the scows during the contract, with specific requirements for data reporting, telemetry, and backup.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the specif ications. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM24B0004
X 9B. DATED (SEE ITEM 11)
08-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2024
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM24B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The Issued By organization has changed from
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
to
USACE CONTRACTING, WILMINGTON DISTRICT
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
(End of Summary of Changes)
Solicitation # W912PM24B0004 Date: 26 JULY 2024 Project Title – MAINTENANCE DREDGING, WILMINGTON HARBOR ANCHORAGE BASIN AND
MOTSU NORTH CAROLINA
Amendment No. 0003
TECHNICAL SUMMARY OF CHANGES
1. CHANGES TO SPECIFICATIONS. Attached hereto are [new, revised and deleted] sections to the specifications. Revision mark “***AMENDMENT 0003***” is shown on each revised page.
A. REVISE SECTION.
Section 35 20 23.13 – NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM –
SCOW MONTIRING PROFILE
1.2 – SUBMITTALS
o REVISED: SD-01 Certificates SD-07 Certificates National Dredging Quality Management Program Certification, Wilmington District; G
SUBMITTAL REGISTER
o 35 20 23.13 – SD-01 PRECONSTRUCTION SUBMITTALS
REVISED: SD-01 PRECONSTRUCTION SUBMITTAL
NATIONAL DREDGING QUALITY MANAGEMENT PLAN
CERTIFICATION
2. CHANGES TO DRAWINGS.
A. NONE
…end of summary…
Solicitation No. W912PM24B0004 Contract No. W912PM24XXXXX
MAINTENANCE DREDGING,
WILMINGTON HARBOR
ANCHORAGE BASIN AND MOTSU
NORTH CAROLINA
AMENDMENT 0003 SPECIFICATIONS
26-JULY-2024
FY24- 25 WHAB & MOTSU Mai nt enance Dr edgi ng FY25WHABMOTSU
W912PM24B0004 AMDT0003
SECTI ON TABLE OF CONTENTS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
SECTI ON 35 20 23. 13
NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM - SCOW MONI TORI NG PROFI LE
02/ 22
PART 1 GENERAL
1. 1 DESCRI PTI ON
1. 2 SUBMI TTALS
1. 3 PAYMENT
1. 4 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM CERTI FI CATI ON
1. 4. 1 Cer t i f i cat i on
1. 4. 2 Qual i t y Assur ance ( QA)
1. 4. 3 Recer t i f i cat i on
1. 5 DREDGE PLANT I NSTRUMENTATI ON PLAN ( DPI P)
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 REQUI REMENTS FOR REPORTED DATA
3. 1. 1 Scow Name
3. 1. 2 Cont r act Number
3. 1. 3 Load Number
3. 1. 4 Hor i zont al Posi t i oni ng
3. 1. 5 Dat e and Ti me
3. 1. 6 Hul l St at us
3. 1. 6. 1 Open- Wat er Di sposal
3. 1. 6. 2 Of f l oadi ng
3. 1. 7 Cour se
3. 1. 8 Speed
3. 1. 9 Headi ng
3. 1. 10 Dr af t
3. 1. 11 Di spl acement
3. 2 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SYSTEM REQUI REMENTS
3. 2. 1 Tel emet r y
3. 2. 2 Dat a Repor t i ng Fr equency
3. 2. 3 Dat a Tr ansmi ssi on t o t he Web Ser vi ce
3. 2. 4 XML- For mat t ed Sensor Dat a St r i ng
3. 2. 5 Cont r act or Dat a Backup
3. 3 PERFORMANCE REQUI REMENTS
3. 4 LI ST OF I TEMS TO BE PROVI DED BY THE CONTRACTOR
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 35 20 23. 13 Page 1
SECTI ON 35 20 23. 13
NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM - SCOW MONI TORI NG PROFI LE
02/ 22
PART 1 GENERAL
1. 1 DESCRI PTI ON
The wor k under t hi s cont r act r equi r es use of t he Nat i onal Dr edgi ng Qual i t y Management Pr ogr am ( DQM) t o moni t or t he dr edge' s st at us at al l t i mes dur i ng t he cont r act and t o manage dat a hi st or y. For t he pur pose of t hese speci f i cat i ons, a scow i s def i ned as any non- sel f - pr opel l ed vessel used t o t r anspor t dr edged mat er i al . Thi s i ncl udes, but i s not l i mi t ed t o, spl i t - hul l scows, pocket scows, hopper bar ges, and deck bar ges.
Thi s per f or mance- based speci f i cat i on sect i on i dent i f i es t he mi ni mum r equi r ed out put and t he pr eci s i on and i nst r ument at i on r equi r ement s. The r equi r ement s may be sat i sf i ed usi ng equi pment and t echni cal pr ocedur es sel ect ed by t he Cont r act or .
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
* * * AMDT0003* * *
SD- 01 Cer t i f i cat esSD- 07 Cer t i f i cat es
Nat i onal Dr edgi ng Qual i t y Management Pr ogr am Cer t i f i cat i on, Wi l mi ngt on Di st r i ct ; G
* * * AMDT0003* * *
1. 3 PAYMENT
Separ at e payment f or i nst al l at i on, oper at i on, and mai nt enance of t he DQM- cer t i f i ed syst em as speci f i ed her ei n f or t he dur at i on of t he dr edgi ng oper at i ons i s not al l owed; al l cost s i n connect i on t her ewi t h ar e consi der ed a subsi di ar y obl i gat i on of t he Cont r act or and ar e cover ed under t he cont r act uni t pr i ce f or dr edgi ng i n t he bi ddi ng schedul e.
1. 4 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM CERTI FI CATI ON
1. 4. 1 Cer t i f i cat i on
The Cont r act or i s r equi r ed t o have a cur r ent cer t i f i cat i on f r om DQM f or t he scow i nst r ument at i on syst em t o be used under t hi s cont r act . Cr i t er i a f or cer t i f i cat i on i s based on t he most r ecent speci f i cat i on post ed on t he DQM websi t e ht t ps: / / www. sam. usace. ar my. mi l / Mi ssi ons/ Spat i al - Dat a- Br anch/ Dr edgi ng- Qual i t y- Management / , Ver i f y compl i ance wi t h t hese cr i t er i a by onsi t e qual i t y assur ance ( QA)
SECTI ON 35 20 23. 13 Page 2 checks conduct ed by t he DQM Suppor t Cent er Dat a Acqui s i t i on and Anal ysi s Team and by per i odi c r evi ew of t he t r ansmi t t ed dat a. I f a syst em i s i nst al l ed speci f i cal l y f or t hi s cont r act , i n or der t o ensur e t hat i t i s capabl e of t r ansmi t t i ng qual i t y dat a t o t he DQM dat abase, t he QA checks shoul d t ake pl ace ei t her pr i or t o t he st ar t of t he cont r act or , wi t h pr i or appr oval of t he l ocal USACE Di st r i ct , as soon as pr act i cal af t er dr edgi ng commences. DQM Cer t i f i cat i on i s val i d f or one year f r om t he dat e of cer t i f i cat i on and i s cont i ngent upon t he syst em' s abi l i t y t o meet t he per f or mance r equi r ement s as out l i ned i n par agr aph PERFORMANCE REQUI REMENTS. I f i ssues wi t h dat a qual i t y ar e not cor r ect ed wi t hi n 48 hour s, t he syst em cer t i f i cat i on wi l l be r evoked and addi t i onal QA checks by t he Dat a Acqui s i t i on and Anal ysi s Team may be necessar y. Annual DQM Cer t i f i cat i on must be based on t he f ol l owi ng:
A ser i es of QA checks as out l i ned on t he DQM websi t e ht t ps: / / www. sam. usace. ar my. mi l / Mi ssi ons/ Spat i al - Dat a- Br anch/ Dr edgi ng- Qual i t y- Management /
Ver i f i cat i on of dat a acqui s i t i on and t r ansf er as descr i bed i n par agr aph PERFORMANCE REQUI REMENTS
Revi ew of t he Dr edge Pl ant I nst r ument at i on Pl an ( DPI P) as descr i bed i n par agr aph DREDGE PLANT I NSTRUMENTATI ON PLAN ( DPI P)
1. 4. 2 Qual i t y Assur ance ( QA)
The Dr edgi ng Cont r act or must have per sonnel who ar e f ami l i ar wi t h t he syst em i nst r ument at i on and who have t he abi l i t y t o r ecal i br at e t he sensor s on si t e dur i ng t he QA pr ocess. The Dr edgi ng Cont r act or must coor di nat e pi ckup t i mes and l ocat i ons and pr ovi de t r anspor t at i on t o and f r om any pl at f or m wi t h a DQM syst em t o t eam per sonnel i n a t i mel y manner . The Dr edgi ng Cont r act or must al so have on si t e f or t he QA checks a t ug capabl e of t owi ng t he scow. As a gener al r ul e, DQM Dat a Acqui s i t i on and Anal ysi s Team per sonnel wi l l come wi t h per sonal pr ot ect i ve equi pment ( PPE) consi st i ng of har dhat s, st eel t oe boot s, and l i f e j acket s. I f addi t i onal saf et y equi pment i s needed, such as eye pr ot ect i on, saf et y har nesses, wor k gl oves, or per sonal l ocat i on beacons, pr ovi de t hese i t ems t o t he t eam whi l e on si t e. Submi t a t est dat a package t o t he DQM dat abase f r om t he syst em on each scow and have i t accept ed by t he DQM Suppor t Cent er pr i or t o scow compl i ance checks. Al so submi t dat a col l ect ed dur i ng t he QA Checks f r om t he scow moni t or i ng syst em t o t he DQM dat abase and t he Dat a Acqui s i t i on and Anal ysi s Team per sonnel whi l e on si t e. I t i s t he Dr edgi ng Cont r act or ' s obl i gat i on t o i nf or m t he QA t eam i f t he l ocat i on desi gnat ed f or t he QA checks has any si t e- speci f i c saf et y concer ns pr i or t o t hei r ar r i val on s i t e.
The owner or oper at or of t he scow must cont act DQM at DQM- Annual QA@r psgr oup. com on an annual basi s, or at l east t hr ee weeks pr i or t o t he pr oposed begi nni ng of dr edgi ng, t o schedul e QA checks. Thi s not i f i cat i on i s meant t o make t he Dat a Acqui s i t i on and Anal ysi s Team awar e of a t ar get dat e and t he cont r act on whi ch t he pl ant wi l l be used. At l east one week pr i or t o t he t ar get dat e, t he Dr edgi ng Cont r act or must cont act t he Dat a Acqui s i t i on and Anal ysi s Team and ver bal l y coor di nat e a speci f i c dat e and l ocat i on.
The Cont r act or must t hen f ol l ow up t hi s conver sat i on wi t h a wr i t t en emai l conf i r mat i on. The owner / oper at or must coor di nat e t he QA checks wi t h al l l ocal aut hor i t i es i ncl udi ng, but not l i mi t ed t o, t he l ocal USACE Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) .
SECTI ON 35 20 23. 13 Page 3
1. 4. 3 Recer t i f i cat i on
Recer t i f i cat i on i s r equi r ed f or any yar d wor k whi ch pr oduces modi f i cat i on t o di spl acement ( f or exampl e, a change i n scow l i nes, or r eposi t i oni ng or r epai nt i ng hul l mar ks) , modi f i cat i on t o bi n vol ume ( change i n bi n di mensi ons or addi t i on or subt r act i on of st r uct ur e) , or changes i n sensor t ype or l ocat i on; r epor t t hese changes i n t he sensor l og sect i on of t he DPI P. A syst em does not have t o be t r ansmi t t i ng dat a bet ween j obs;
however , i n or der t o r et ai n cer t i f i cat i on dur i ng t hi s per i od, t he syst em sensor s or har dwar e shoul d not be di sconnect ed or r emoved f r om t he scow.
I f t he syst em i s power ed down, r et ai n cal i br at i on coef f i c i ent s.
1. 5 DREDGE PLANT I NSTRUMENTATI ON PLAN ( DPI P)
The Cont r act or must have a di gi t al copy of t he DPI P on f i l e wi t h t he DQM Suppor t Cent er . Whi l e wor ki ng on si t e, t he Cont r act or must al so mai nt ai n on t he dr edge a copy of t he DPI P whi ch i s easi l y accessi bl e t o Gover nment per sonnel at al l t i mes. Thi s document must descr i be t he sensor s used, conf i gur at i on of t he syst em, how sensor dat a wi l l be col l ect ed, how qual i t y cont r ol on t he dat a wi l l be per f or med, and how sensor s/ dat a r epor t i ng equi pment wi l l be cal i br at ed and r epai r ed i f t hey f ai l . A descr i pt i on of comput ed scow- speci f i c dat a and how t he sensor dat a wi l l be t r ansmi t t ed t o t he DQM dat abase must al so be i ncl uded. The Cont r act or must submi t t o t he DQM Suppor t Cent er any addendum or modi f i cat i ons made t o t he pl an, subsequent t o i t s or i gi nal submi ssi on, pr i or t o st ar t of wor k.
A compl et e l i s t of t he r equi r ed DPI P cont ent s i s pr ovi ded on t he DQM websi t eht t ps: / / www. sam. usace. ar my. mi l / Mi ssi ons/ Spat i al - Dat a- Br anch/ Dr edgi ng- Qual i t y- Management / .
Submi t t o t he DQM Suppor t Cent er any addendum or modi f i cat i ons made t o t he pl an, subsequent t o i t s or i gi nal submi ssi on, pr i or t o t he st ar t of wor k.
Any changes t o t he comput at i on met hods must be appr oved by t he DQM Suppor t Cent er pr i or t o t hei r i mpl ement at i on.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
3. 1 REQUI REMENTS FOR REPORTED DATA
Pr ovi de, oper at e, and mai nt ai n al l har dwar e and sof t war e t o meet t hese speci f i cat i ons. The Cont r act or i s r esponsi bl e f or r epl acement , r epai r , and cal i br at i on of sensor s and ot her necessar y dat a acqui s i t i on equi pment needed t o suppl y t he r equi r ed dat a. Compl et e r epai r s wi t hi n 48 hour s of any sensor f ai l ur e. Not i f y t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) upon compl et i on of a r epai r , r epl acement , i nst al l at i on, modi f i cat i on, or cal i br at i on. The COR may r equest r ecal i br at i on of sensor s or ot her har dwar e component s at any t i me dur i ng t he cont r act as deemed necessar y.
Keep a l og of sensor r epai r , r epl acement , i nst al l at i on, modi f i cat i on, and cal i br at i on i n t he onsi t e copy of t he DPI P. The l og must cont ai n a t hr ee- year hi st or y of sensor mai nt enance, i ncl udi ng t he t i me of sensor f ai l ur es ( and subsequent r epai r s) , t he t i me and r esul t s of sensor cal i br at i ons, t he t i me of sensor r epl acement s, and t he t i me t hat backup sensor syst ems wer e i ni t i at ed t o pr ovi de t he r equi r ed dat a. I t must al so cont ai n t he name of t he per son r esponsi bl e f or t he sensor wor k. I nst al l sensor s t hat ar e capabl e of col l ect i ng par amet er s wi t hi n speci f i ed accur aci es and r esol ut i ons i ndi cat ed i n t he f ol l owi ng subpar agr aphs.
SECTI ON 35 20 23. 13 Page 4
Wi t h t he except i on of posi t i on and any val ue cal cul at ed, r epor t ed sensor val ues shoul d r epr esent a wei ght ed aver age wi t h t he hi ghest and l owest val ues not i ncl uded i n t he cal cul at ed aver age f or t he gi ven i nt er val . The aver agi ng r out i ne used shoul d be consi st ent acr oss al l event t r i gger s.
Thi s i nf or mat i on shoul d be document ed i n t he DPI P sect i ons t hat say " Cal cul at i ons done ext er nal t o t he i nst r ument at i on. " These dat a- r epor t i ng r equi r ement s cover t he col l ect i on of el ect r oni c dat a on a scow t hr ough t he ent i r e dr edgi ng cycl e. Di sposal event s can consi st of bot h open- wat er di sposal and of f l oadi ng. Open- wat er di sposal i s t he pl acement of mat er i al v i a bot t om door s or spl i t hul l . Of f l oadi ng i s t he pl acement of mat er i al v i a ei t her hydr aul i c or mechani cal means.
3. 1. 1 Scow Name
Assi gn a uni que name f or each scow t hat wi l l r emai n const ant f r om one dr edgi ng oper at i on t o t he next .
3. 1. 2 Cont r act Number
The USACE- assi gned cont r act number f or t he pr oj ect wi l l be r epor t ed.
3. 1. 3 Load Number
A DQM l oad number must document t he end of a di sposal event f or a gi ven scow.
3. 1. 4 Hor i zont al Posi t i oni ng
Recor d hor i zont al posi t i oni ng as t he geogr aphi c coor di nat es of t he vessel as i ndi cat ed by t he l ocat i on of t he Gl obal Posi t i oni ng Syst em ( GPS) ant enna. Obt ai n al l l ocat i ons usi ng a posi t i oni ng syst em oper at i ng wi t h a mi ni mum accur acy l evel of 3 t o 10 f eet hor i zont al Ci r cul ar Er r or Pr obabl e ( CEP) . Repor t posi t i ons as Lat i t ude/ Longi t ude WGS 84 i n deci mal degr ees.
West Longi t ude and Sout h Lat i t ude val ues ar e r epor t ed as negat i ve.
3. 1. 5 Dat e and Ti me
Repor t t he dat e and t i me t o t he near est second and r ef er enced t o Uni ver sal Ti me Coor di nat ed ( UTC) based on a 24- hour f or mat : yyyy- mm- dd hh: mm: ss.
3. 1. 6 Hul l St at us
Hul l st at us i s meant t o r ef l ect a condi t i on when mat er i al coul d be r emoved or r el eased f r om t he scow. For t hi s cont r act , hul l st at us must r egi st er c l osed pr i or t o l eavi ng t he di sposal ar ea.
3. 1. 6. 1 Open- Wat er Di sposal
I ndi cat e an open spl i t hul l or open bot t om door of a scow by r epor t i ng an " OPEN" val ue. I ndi cat e a c l osed spl i t hul l or c l osed bot t om door of a scow by r epor t i ng a " CLOSED" val ue. An open st at us must be i ndi cat ed as t he bi n st ar t s t o open, and a c l osed st at us must be i ndi cat ed onl y once t he bi n i s f ul l y c l osed. For pocket scows, t he open/ cl osed st at us must cor r espond t o t he compar t ment whi ch i s f i r st t o open and l ast t o c l ose.
3. 1. 6. 2 Of f l oadi ng
For non- dumpi ng scows, an " OPEN" val ue i ndi cat es t hat t he bi n i s i n t he
SECTI ON 35 20 23. 13 Page 5 pr ocess of bei ng unl oaded, ei t her by pumpi ng or mechani cal means.
3. 1. 7 Cour se
Pr ovi de scow cour se- over - gr ound ( COG) usi ng i ndust r y- st andar d equi pment .
Pr ovi de scow cour se- over - gr ound ( t o t he near est whol e degr ee) wi t h val ues f r om 000 ( t r ue nor t h) t o 359 degr ees r ef er enced t o a c l ockwi se posi t i ve di r ect i on convent i on.
3. 1. 8 Speed
Pr ovi de scow speed- over - gr ound i n knot s usi ng i ndust r y- st andar d equi pment wi t h a mi ni mum accur acy of 1. 0 knot and r esol ut i on t o t he near est 0. 1 knot .
3. 1. 9 Headi ng
Pr ovi de scow headi ng usi ng i ndust r y- st andar d equi pment . The scow headi ng must be accur at e t o wi t hi n 5 degr ees and r epor t ed t o t he near est whol e degr ee wi t h val ues f r om 000 ( t r ue nor t h) t o 359 degr ees r ef er enced t o a c l ockwi se posi t i ve di r ect i on convent i on.
3. 1. 10 Dr af t
Repor t al l dr af t measur ement s i n f eet , t ent hs, and hundr edt hs wi t h an accur acy of pl us or mi nus 0. 1 f oot r el at i ve t o obser ved physi cal dr af t r eadi ngs. Repor t t he measur ement s at a r esol ut i on of t wo deci mal pl aces ( hundr edt hs of a f oot ) . The r epor t ed f or war d dr af t val ue must be equal t o t he sum of t he v i sual f or war d por t and st ar boar d dr af t mar k r eadi ngs di v i ded by t wo. The r epor t ed af t dr af t val ue must be equal t o t he sum of t he v i sual af t por t and st ar boar d dr af t mar k r eadi ngs di v i ded by t wo.
For war d dr af t , af t dr af t , and aver age dr af t wi l l be r epor t ed. Pl ace sensor s at an opt i mum l ocat i on on t he scow t o be r ef l ect i ve of obser ved physi cal dr af t mar k r eadi ngs at any t r i m or l i s t . Mi ni mum accur aci es ar e condi t i onal t o r el at i vel y cal m wat er . The r epor t ed sensor val ue i s an aver age of at l east t en sampl es per event , wi t h at l east one maxi mum val ue and one mi ni mum val ue r emoved, and t he mi ni mum ei ght r emai ni ng val ues aver aged. When t he aver age dr af t i s cal cul at ed f or t he pur pose of det er mi ni ng di spl acement , mai nt ai n s i gni f i cant di gi t s f or aver age dr af t such t hat i f f or war d dr af t wer e 0. 15 and af t dr af t wer e 0. 1, t hen t he aver age dr af t woul d be 0. 125.
3. 1. 11 Di spl acement
Repor t scow di spl acement i n l ong t ons, based on t he most accur at e met hod avai l abl e f or t he scow. The mi ni mum st andar d of accur acy f or di spl acement i s i nt er pol at i on f r om t he di spl acement t abl e, based on t he aver age dr af t .
For t hi s cont r act t he densi t y of wat er used t o cal cul at e di spl acement i s 63* l bs/ cubi c f oot and i s used f or an addi t i onal i nt er pol at i on bet ween t he f r esh and sal t wat er t abl es.
* The wat er densi t y used i s pr oj ect - / l ocat i on- speci f i c . Ent er t he appr opr i at e wat er densi t y i n t he bl ank:
Fr esh Wat er : 62. 43 l bs/ cubi c f oot Sal t Wat er : 64. 11 - 64. 30 l bs/ cubi c f oot
3. 2 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SYSTEM REQUI REMENTS
The Cont r act or ' s DQM syst em must be capabl e of col l ect i ng, di spl ayi ng, and
SECTI ON 35 20 23. 13 Page 6 t r ansmi t t i ng i nf or mat i on t o t he DQM dat abase. The par amet er s whi ch must be r epor t ed t o t he DQM dat abase i ncl ude t r i p number , dat e and t i me, hul l st at us, scow cour se, scow speed, scow headi ng, dr af t , di spl acement , ul l age, and bi n vol ume. Pr ovi de an easi l y accessi bl e, per manent v i sual di spl ay on t he scow t o show i n r eal t i me t he par amet er s col l ect ed by t he syst em i n t he same uni t s as t he dat a submi t t ed t o t he DQM dat abase. I n t he event a r epor t ed par amet er i s cal cul at ed based on mul t i pl e sensor s, t he sensor val ues as used i n t he equat i on must be abl e t o be vi ewed i n addi t i on t o t he r equi r ed par amet er . I f a har dwar e pr obl em occur s, or i f a par t of t he syst em i s physi cal l y damaged, t he Cont r act or i s be r esponsi bl e f or r epai r i ng i t wi t hi n 48 hour s of det er mi nat i on of t he condi t i on.
3. 2. 1 Tel emet r y
The Cont r act or may sel ect any commer ci al sat el l i t e, cel l ul ar phone, or ot her dat a communi cat i ons syst ems avai l abl e, as l ong as i t i s capabl e of t r ansmi t t i ng r eal - t i me dat a as wel l as enough addi t i onal bandwi dt h t o c l ear hi st or i cal l y queued dat a when a connect i on i s r eobt ai ned. I f connect i v i t y i s l ost , que and t r ansmi t unsent dat a upon r est or at i on of connect i v i t y. Del ays i n pushi ng r eal - t i me dat a t o t he DQM dat abase shoul d not exceed f our hour s. Except i ons t o t hese r equi r ement s may be gr ant ed by t he DQM Cent er on a case- by- case basi s wi t h consi der at i on f or cont r act - speci f i c r equi r ement s, s i t e- speci f i c condi t i ons, and ext r eme weat her event s.
The dat a t r ansmi ssi on pr ocess f r om t he scow t o t he DQM dat abase must be aut omat ed. The dat a may be sent f r om t he scow di r ect l y t o t he DQM dat abase or t o a shor e- based syst em. Dat a t r ansmi t t ed t o t he DQM dat abase shoul d be r aw dat a; use r epeat abl e aut omat ed sof t war e or pr ogr ammi ng r out i ne t o pr ocess any shor esi de dat a. I ncl ude a descr i pt i on of t hi s pr ocess i n t he DPI P.
3. 2. 2 Dat a Repor t i ng Fr equency
Log di sposal act i v i t i es wi t h hi gh t empor al and spat i al r esol ut i on. Log dat a as a ser i es of event s. Each set of measur ement s ( t i me, posi t i on, et c. ) wi l l be consi der ed an event . Col l ect any r equi r ed i nf or mat i on i n par agr aph REQUI REMENTS FOR REPORTED DATA, t hat i s not an aver aged var i abl e ( t hat i s , dr af t and ul l age) wi t hi n 1 second of t he r epor t ed t i me. Measur e dat a wi t h suf f i c i ent f r equency by t he scow syst em t o r esol ve t he event s t o t he accur acy speci f i ed i n t he f ol l owi ng t abl e. Any aver aged var i abl e must be col l ect ed and comput ed wi t hi n t hi s sampl i ng i nt er val . Event t ypes " Sai l i ng, " " Loadi ng/ St at i onar y, " " Of f l oadi ng, " and " Open Wat er Di sposal " ar e t r i gger ed by a t i me cr i t er i on; t he cr i t er i on shoul d be consi st ent acr oss t he " Sai l i ng" and " Open Wat er Di sposal " event t ypes and shoul d not change f or t he dat a col l ect ed on a gi ven scow. Thi s cr i t er i on shoul d be document ed by t he Cont r act or i n t he DPI P.
SECTI ON 35 20 23. 13 Page 7
Event Type Event Tr i gger Descr i pt i ons Event Ti me Resol ut i on
Event Posi t i on Resol ut i on
Loadi ng/ St at i onar y
No change i n posi t i on wi t h hul l st at us cl osed An el apsed t i me of 1 hour si nce t he l ast event .
NONCLOSURE
I n t he event a scow has compl et ed an open wat er di sposal and t r ansi t ed back t o a hol di ng st at i on wi t hout c l osi ng t he hul l , t he sampl i ng must be changed t o once per hour .
1 mi nut e N/ A
Sai l i ng Change i n posi t i on wi t h hul l st at us cl osed Ti me f r om t he l ast sampl e equal s 1 mi nut e.
1 second pl us or mi nus 10 f t
Open Wat er Di sposal
Hul l st at us open A posi t i on must be r ecor ded wi t hi n 1 second of t he hul l st at us goi ng f r om cl osed t o open and agai n wi t hi n 1 second of t he hul l st at us goi ng f r om open t o cl osed. Repor t t he posi t i on at any equal i nt er val f r om 6 t o 12 seconds. Thi s i nt er val must al ways r emai n consi st ent f or t he dr edge pl ant .
1 second pl us or mi nus 10 f t
Of f l oadi ng Of f l oadi ng mat er i al , hul l st at us r epor t ed as open A posi t i on must be r ecor ded wi t hi n 1 mi nut e ar r i val at t he of f l oad l ocat i on and wi t hi n one secnd of t he mat er i al st ar t i ng t o be r emoved f r om scow. The t i me f r om t he l ast sampl e equal s 1 mi nut e.
STANDBY OFFLOADI NG
I n t he even a scow i s not bei ng act i vel y of f l oaded at t he of f l oad l ocat i on f or a t i me equal t o one hour , t he sampl i ng i nt er val must be equal t o once an hour .
1 second
1 mi nut e pl us or mi nus 10 f t
Exampl e: The scow i s st at i onar y f or 1 hour and 15 mi nut es, and t hen i t sai l s t o t he di sposal ar ea. You shoul d have a " Loadi ng/ St at i onar y" event at t i me 0, t i me 1 hour , and t i me 1 hour and 15 mi nut es. Then, f or " Sai l i ng, " wi t hi n 1 second of an el apsed t i me of 1 mi nut e f r om t he 1 hour and 15 mi nut es event , anot her event occur s.
3. 2. 3 Dat a Tr ansmi ssi on t o t he Web Ser vi ce
Use a Si mpl e Obj ect Access Pr ot ocol ( SOAP) web ser vi ce t o r epor t sensor dat a t o t he DQM dat abase. Tr ansmi t dat a as i t i s col l ect ed i n r eal t i me and pushed t o t he DQM web ser vi ce. I f t he web ser vi ce i s not avai l abl e or r et ur ns an er r or message, st or e t he dat a i n a queue and t r ansmi t upon r e- est abl i shment of t he connect i on, st ar t i ng wi t h t he ol dest dat a i n t he queue and cont i nui ng unt i l r eal - t i me t r ansmi ssi on i s r est or ed. Del ays i n pushi ng r eal - t i me dat a t o t he DQM dat abase shoul d not exceed f our hour s.
Except i ons t o t hese r equi r ement s may be gr ant ed by t he DQM Suppor t Cent er
SECTI ON 35 20 23. 13 Page 8 on a case- by- case basi s wi t h consi der at i on f or cont r act - speci f i c r equi r ement s, s i t e- speci f i c condi t i ons, and ext r eme weat her event s.
Cont act dqm- suppor t @usace. ar my. mi l t o obt ai n t he web ser vi ce URL and t he appr opr i at e key cr edent i al s and communi cat i on pr ot ocol .
The dat a t r ansmi ssi on met hod cal l t akes t wo ar gument s: a st r i ng cont ai ni ng t he pl ant i dent i f i er assi gned by t he DQM Suppor t Cent er and a second st r i ng cont ai ni ng t he XML- f or mat t ed sensor dat a. The met hod r et ur ns t he st r i ng " OK" i f t he dat a i s r ecei ved. I f t he dat a i s not r ecei ved, ei t her t he web ser vi ce or t he c l i ent appl i cat i on t hr ows an er r or .
3. 2. 4 XML- For mat t ed Sensor Dat a St r i ng
Pass each scow event as a st r i ng on one cont i nuous l i ne of dat a. The exampl e bel ow i s br oken up by var i abl e f or ease of r eadi ng:
<?xml ver si on=" 1. 0" ?> <SCOW_DREDGI NG_DATA ver si on=" 2. 5" >
<SCOW_NAME>AU1994</ SCOW_NAME>
<CONTRACT>W123BA- 09- D- 0087_RL01</ CONTRACT>
<TRI P_NUMBER>34</ TRI P_NUMBER>
<X_POSI TI ON>- 81. 670632</ X_POSI TI ON>
<Y_POSI TI ON>41. 528987</ Y_POSI TI ON>
<DATE_TI ME>2010- 08- 14 10: 50: 15</ DATE_TI ME>
<SCOW_SPEED>0. 0</ SCOW_SPEED>
<SCOW_COURSE>0. 0</ SCOW_COURSE>
<HULL_STATUS>OPEN</ HULL_STATUS>
<SCOW_HEADI NG></ SCOW_HEADI NG>
<SCOW_FWD_DRAFT></ SCOW_FWD_DRAFT>
<SCOW_AFT_DRAFT></ SCOW_AFT_DRAFT>
<SCOW_AVG_DRAFT></ SCOW_AVG_DRAFT>
<ULLAGE_FWD></ ULLAGE_FWD>
<ULLAGE_AFT></ ULLAGE_AFT>
<ULLAGE_AVG></ ULLAGE_AVG>
<SCOW_BI N_VOLUME></ SCOW_BI N_VOLUME>
<SCOW_DI SPLACEMENT></ SCOW_DI SPLACEMENT>
<SCOW_LI GHTSHI P></ SCOW_LI GHTSHI P>
<SCOW_TDS></ SCOW_TDS>
<ADDI TI ONAL_DATA>Some mor e scow i nf o, i f needed</ ADDI TI ONAL_DATA>
</ SCOW_DREDGI NG_DATA>
For mat DATE_TI ME val ues as YYYY- MM- DD HH: MM: SS, as shown above. I f , f or any r eason, a f i el d has no val ue, t he encl osi ng XML t ags shoul d be sent wi t h not hi ng bet ween t hem ( f or exampl e, <DRAFT_AFT></ DRAFT_AFT>) . The web ser vi ce cannot handl e a " nul l " val ue or any ot her i ndi cat or s of no val ue col l ect ed.
3. 2. 5 Cont r act or Dat a Backup
Mai nt ai n an ar chi ve of al l dat a sent t o t he DQM dat abase dur i ng t he dr edgi ng cont r act . The Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) may r equi r e, at no i ncr ease i n t he cont r act pr i ce, t hat t he Cont r act or pr ovi de a copy of t hese dat a cover i ng speci f i ed t i me per i ods. Pr ovi de t he dat a i n t he HTML f or mat whi ch woul d have been t r ansmi t t ed t o t he DQM dat abase.
Submi t dat a v i a st or age medi um accept abl e t o t he COR.
At t he end of t he dr edgi ng cont act , cont act t he DQM Suppor t Cent er pr i or t o di scar di ng t he dat a. The DQM Suppor t Cent er wi l l ver i f y t hat al l dat a
SECTI ON 35 20 23. 13 Page 9 has been r ecei ved and appr opr i at el y ar chi ved bef or e gi v i ng t he Cont r act or di scar d per mi ssi on. Recor d i n a separ at e sect i on at t he end of t he scow' s onsi t e copy of t he DPI P t he f ol l owi ng i nf or mat i on:
Per son who made t he cal l Dat e of t he cal l DQM r epr esent at i ve who gave per mi ssi on t o di scar d
3. 3 PERFORMANCE REQUI REMENTS
The Cont r act or ' s DQM syst em must be f ul l y oper at i onal at t he st ar t of dr edgi ng oper at i ons and f ul l y cer t i f i ed pr i or t o movi ng dr edge mat er i al on t he cont r act ( see par agr aph NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM CERTI FI CATI ON) . To meet cont r act r equi r ement s f or oper abi l i t y , i n addi t i on t o cer t i f i cat i on, t he Cont r act or ' s syst em must pr ovi de a dat a st r i ng wi t h val ues f or al l par amet er s whi l e oper at i ng, as descr i bed wi t hi n t he speci f i cat i ons. Addi t i onal l y, al l har dwar e must be compl i ant wi t h DPI P r equi r ement s ( see par agr aph DREDGE PLANT I NSTRUMENTATI ON PLAN ( DPI P) ) . Qual i t y dat a st r i ngs ar e consi der ed t o be t hose pr ovi di ng val ues f or al l par amet er s r epor t ed when oper at i ng accor di ng t o t he speci f i cat i on. Make r epai r s necessar y t o r est or e dat a r et ur n compl i ance wi t hi n 48 hour s. Fai l ur e by t he Cont r act or t o r epor t t he r equi r ed dat a wi t hi n t he speci f i ed t i me wi ndow f or scow measur ement s ( see par agr aph DATA REPORTI NG FREQUENCY, and par agr aph DATA TRANSMI SSI ON TO THE WEB SERVI CE) and f ai l ur e t o r ecei ve DQM cer t i f i cat i on pr i or t o dr edgi ng wi l l r esul t i n wi t hhol di ng of up t o 10 per cent of t he cont r act pr ogr ess payment per FAR
52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s.
3. 4 LI ST OF I TEMS TO BE PROVI DED BY THE CONTRACTOR
DPI P
ht t ps: / / www. sam. usace. ar my. mi l / Mi ssi ons/ Spat i al - Dat a- Br anch/ Dr edgi ng- Qual i t y- Management /
DQM SYSTEM
Sensor i nst r ument at i on - Par agr aph REQUI REMENTS FOR REPORTED DATA
SCOW DATA
Event document at i on - Par agr aph DATA REPORTI NG FREQUENCY Dat a r epor t s - Par agr aph DATA TRANSMI SSI ON TO THE WEB SERVI CE
QA EQUI PMENT ON THE DREDGE
Cl ear and accur at e dr af t mar ks
- - End of Sect i on - -
SECTI ON 35 20 23. 13 Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
FY24-25 WHAB & MOTSU Maintenance Dredging
01 10 00.10 38 SD-01 Preconstruction Submittals
1.20List of Subcontractors
1.19 G AProgress Chart
1.20 G AQuality Control Plan
1.20Certificate of Insurance
G AAccident Prevention Plan
G AEnvironmental Protection Plan
1.15Initial Progress Schedule
SD-03 Product Data
1.14WORK PLAN
1.15PROGRESS SCHEDULE
SD-07 Certificates
1.20Certificate of Insurance
1.11U.S. Coast Guard Certification
1.20Completion of Corps CQC
Course
1.20Letter Appointing Superintendent
1.18 G Atesting laboratory
1.18 G Atesting laboratory
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.3.1 GInitial Project Schedule
3.3.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.2.3Delegation of Authority
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
1.17 GDive Operations Plan
SD-06 Test Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
SD-07 Certificates
1.7.6Crane Operators/Riggers
1.9 GActivity Hazard Analysis (AHA)
1.13.4Certificate of Compliance
1.14Hot Work Permit
1.15.1 GPortable Gauge Operations
Planning Worksheet
1.15.1 GRadiography Operation Planning
Work Sheet
1.13.4 GStandard Lift Plan
1.13.5Third Party Certification Of
Floating Cranes And
Barge-Mounted Mobile Cranes
1.15License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
3.6.5Certificate Of Insurance
3.6.5Quality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
01 45 00.00 10 3.6.5Completion Of Corps Cqc Course
3.6.5Letter Appointing Superintendent
3.6.5List Of Subcontractors
3.6.5Progress Chart
3.6.5 GAccident Prevention Plan (App)
3.6.5 GSafe Access Plan
Required Construction Meetings
SD-06 Test Reports
3.10.2Verification Statement
SD-07 Certificates
3.5.3 GTesting Laboratory
SD-11 Closeout Submittals
3.6.5Certificate Of Insurance
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
1.6.4 GEnvironmental Manager
Qualifications
1.6.5 GEmployee Training Records
3.17.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
AIS Numbers; G
SD-06 Test Reports
3.2.1.1Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
01 57 19 SD-07 Certificates
1.6.5 GEmployee Training Records
Certificate of Competency
SD-11 Closeout Submittals
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
As-Built Topographic Survey
Contractor Certification; G
3.11.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
35 20 23 SD-01 Preconstruction Submittals
3.6.2Work Plan
3.7.1Dredge Material Placement Plan
Preconstruction Video Survey
1.5Communications Plan
3.6.2Communications Plan
SD-02 Shop Drawings
3.6.2Dredging Plan
3.6.3Dredging Plan
3.6.3Dredging Plan
3.6.2Dredged Material Placement Plan
3.7.1Dredged Material Placement Plan
SD-06 Test Reports
3.3Daily Observer Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
35 20 23 Protection Plan
1.10.3U.S. Coast Guard certification
35 20 23.13 SD-01 Preconstruction Submittals
1.4 GNational Dredging Quality
Management Program Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
***AMDT0003*** ****AMDT0003***
| NOFE-AMDT0003-SPECS-TECH-SUMMARY-W912PM24B0004-WHAB-MOTSU.pdf |
| AMDT0003 TECHNICAL SUMMARY |
| USACE AMDT0003 COVER |
| DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION |
| 35 20 23.13 - NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - SCOW MONITORING PROFILE |
| 35 20 23.13 - NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - SCOW MONITORING PROFILE |
| PART 1 GENERAL |
| 1.1 DESCRIPTION |
| ***AMDT003***1.2 SUBMITTALS |
| 1.3 PAYMENT |
| 1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION |
| 1.4.1 Certification |
| 1.4.2 Quality Assurance QA |
| 1.4.3 Recertification |
1.5 DREDGE PLANT INSTRUMENTATION PLAN DPIP
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 REQUIREMENTS FOR REPORTED DATA |
| 3.1.1 Scow Name |
| 3.1.2 Contract Number |
| 3.1.3 Load Number |
| 3.1.4 Horizontal Positioning |
| 3.1.5 Date and Time |
| 3.1.6 Hull Status |
| 3.1.6.1 Open-Water Disposal |
| 3.1.6.2 Offloading |
| 3.1.7 Course |
| 3.1.8 Speed |
| 3.1.9 Heading |
| 3.1.10 Draft |
| 3.1.11 Displacement |
| 3.2 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM REQUIREMENTS |
| 3.2.1 Telemetry |
| 3.2.2 Data Reporting Frequency |
| 3.2.3 Data Transmission to the Web Service |
| 3.2.4 XML-Formatted Sensor Data String |
| 3.2.5 Contractor Data Backup |
| 3.3 PERFORMANCE REQUIREMENTS |
| 3.4 LIST OF ITEMS TO BE PROVIDED BY THE CONTRACTOR |
***AMDT003***SUBMITTAL REGISTER
File details come from the government source that posted it. Updated .