RFP NO.: W912PL19R0011
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
REQUEST FOR PROPOSALS
CONSTRUCTION OF CBP Project
IFT (Integrated Fixed Tower) SITE PREP AJO &
CASA GRANDE AOR
TOHONO O'ODHAM NATION, ARIZONA
Tucson Sector, Customs and Border Protection
CONSTRUCTION SOLICITATION AND SPECIFICATIONS
May 2019
IFT SITE PREP AJO & CASA GRANDE AOR W912PL19R0011
PROJECT TABLE OF CONTENTS
DIVISION 00 –
00 01 05 Certification Page 00 10 00 CLIN Schedule 00 21 16 Instructions to Proposers 00 22 00 Supplementary Instructions 00 22 16 Supplementary Instructions to Proposers
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 73 00 SUPPLEMENTARY CONDITIONS
00 73 46 WAGE RATES
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 STATEMENT OF WORK
01 27 00 Measurement and Payment
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 37 00 SECURITY AND OPERATIONAL REQUIREMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION (PROVIDED IN NEXT SUBMITTAL)
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED / RECOVERED MATERIALS
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 39 00.00 10 CONCRETE CURING
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 11 34 PORTLAND CEMENT-STABILIZED SURFACE COURSE
32 15 00 AGGREGATE SURFACE COURSE
32 15 00.00 29 SURFACE BLADING
32 92 19 SEEDING
DIVISION 33 – UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
SOLICITATION, OFFER,
AND AWARD W912PL19R0011 □ SEALED BID {IFB)
(Construction, Alteration, or Repair)
� NEGOTIATED (RFP)
IMPORTANT-The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 1 6. PROJECT NUMBER
404331
7. ISSUED BY CODE
USACE, Los Angeles District Contracting Division, East Region Branch C/O Christina M. Chavez 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017
8. ADDRESS OFFER TO
SAME AS BLOCK #7
►JA. NAME
9. FORINFORMATIONCALL ·ichristina M. Chavez I
B. TELEPHONE NUMBER {Include area code) (NO COLLECT CALLS)
213-452-3246
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
The U.S. Army Corps of Engineers Los Angeles District is soliciting for award of a construction contract for the Tohono O'odham Nation and Customs and Border Patrol - Integrated Fixed Tower (TON IFT) Project Road and Site Preparation. The project is to construct 30 miles of road and site preparation of 9 towers sites and upgrade of 89 low water crossings located southwest of Tucson, AZ.
This solicitation is a Small Business Set Aside
Estimated cost range for this project is between $10,000,000 and $15,000,000.
Solicitation W912PL19R0011 and all amendments for this acquisition will be posted on FedBizOpps (FBO) (www.fbo.gov). THE GOVERNMENT INTENDS TO ISSUE THIS SOLICITATION AND ALL AMENDMENTS
THROUGH THE USE OF THE INTERNET (WEB ONLY). No additional media (CD ROMs, Floppy Disks, Faxes, or paper) will be provided unless the Government determines that it is necessary.
ALL OFFERORS/BIDDERS ARE ALSO ADVISED THAT THIS PROCUREMENT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, EVALUATION NEGOTIATION, AND/OR FINAL AWARD PROCESS.
11. The Contractor shall begin performance within 10 calendar days and complete it within 2 7 0 calendar days after receiving
D award, � notice to proceed. This performance period is � mandatory, D negotiable. (See *Section 00 73 00
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 128.)
�YES □ NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
12B. CALENDAR DAYS
A. Sealed offers in original and __ 4 _____ copies to perform the work required are due at the place specified in Item 8 by _1_4_o_o __ {hour) local time JUNE 2 7TH 2019 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee �is, D is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than be rejected.
__ 1_2_0 ___ calendar days for Government acceptance after the date offers are due will not be considered and will
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA· FAR (48 CFR) 53.236-1(d)
W912PL-17-R-0010
SECTION 00 01 05 - 1
SECTION 00 01 05 – CERTIFICATION PAGE
CERTIFICATE OF CORPORATE PRINCIPAL
1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:
(Company Name) (Signature) (Title)
SECTION 00 01 05 - 2
2) IF THE OFFEROR IS PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:
3) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION
SHOULD BE COMPLETED:
CERTIFICATION AS TO CORPORATE PRINCIPAL
I, , certify that I am the Secretary of the corporation named as principal in the within contract; that , who signed the said contract on behalf of the principal, was the of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
CORPORATE PRINCIPAL
CORPORATE SEAL
SECRETARY
(4) IF THE OFFEROR IS A LIMITED LIABILITY COMPANY, LIST FULL NAME OF
ALL MANAGERS BELOW. SIGNATURES BY ALL MANAGERS HERE SIGNIFY THAT
SECTION 00 01 05 - 3
THAT THE INDIVIDUAL WHO SIGNED THE OFFER IN BLOCK 20B HAS THE
AUTHORITY TO BIND THE LIMITED LIABILITY COMPANY.
Name Signature
SECTION 00 10 00 – 1
SECTION 00 10 00 PRICE SCHEDULE
Item No. Description of Item QTY Unit Unit Price Amount
BASE ITEMS
0001 Roads and sites at 3 locations in AJO Station Area of Responsibility (AJO 0448, 0450, 0446,), complete.
1 JOB . $_________
0002 Provide Security for Roads and sites at 3locations in AJO Station of Responsibility Area ( TCA AJO 0448, 0450, 0446), complete
1 JOB $_________
0003 Roads and sites at 6 locations in CASA GRANDE and AJO Station Area of Responsibility (TCA CAG 0430, 0434, 0436, 0438, 0440, 0442), complete.
1 JOB $_________
0004 Provide Security for Roads and sites at 6 locations in CASA GRANDE and AJO Station Area of Responsibility (TCA
CAG 0430, 0434, 0436, 0438, 0440,
0442), complete
1 JOB $_________
0005 Traditional Northern Road (TNR) Low Water Crossing Upgrades, complete
1 JOB $_________
0006 Provide Security for Traditional Northern Road (TNR) Low Water Crossing Upgrades, complete
1 JOB $_________
TOTAL OF BASE ITEMS $____________________
OPTION ITEMS
Item No. Description of Item QTY Unit Unit Price Amount
0007 Option Item No. 1: Road and site at location in CASA GRANDE Station Area of Responsibility (TCA CAG 0444), complete.
1 JOB $_________
0008 Option Item No. 2: Provide Security for Road and site at location in CASA GRANDE Station Area of Responsibility (TCA CAG 0444), complete
1 JOB $_________
SECTION 00 10 00 – PRICE SCHEDULE - 2
Item No. Description of Item QTY Unit Unit Price Amount
0009 Option Item No. 3: Provide 100 Y3aggregate base, 1 JOB $_________
0010 Option Item No. 4: Provide additional 100 Y3 small RIP RAP (see Mike about grouting the northern road), complete
1 JOB $_________
0011 Option Item No. 5: Provide additional 100 Y3 medium RIP RAP, complete
1 JOB $_________
0012 Option Item No. 6: Provide 50 Y3 concrete 3000 PSI, complete
1 JOB $_________
0013 Option Item No. 7: Provide 50 Y3 concrete 5000 PSI, complete.
1 JOB $_________
0014 Option Item No. 8: Provide 100 Y3 classified fill, complete
1 JOB $_________
TOTAL OF OPTION ITEMS NOs 1 – 8 (CLINS 0007-0014) $____________________
TOTAL OF BASE BID (CLINS 0001-0006) AND
OPTION ITEMS NOs 1 – 8 (CLINS 0007-0014)
OFFERORS NOTES
1. EVALUATION: The Government intends to issue a task order resulting from the Request for Proposals (RFP) to the responsible Offeror whose proposal represents the Best Value (Trade Off) to the Government Sections 00 22 00 and 00 22 16
2. The Army will procure this project through a technical and price competition in accordance with the provisions set forth in this Request for Proposal (RFP). When a task order is awarded, it will be a "Firm Fixed Price” task order.
3. POST-AWARD CONFERENCE: The contractor agrees to attend any post-award conference(s) convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.1003.
4. Prices must be submitted on all individual line items of the Price Schedule; otherwise, the Offer may be considered non-compliant and may be rejected.
5. The lump sum “LS” line items in the Price Schedule are not “Estimated Quantity” line items and are not subject to the “Variation in Estimated Quantity” contract clause.
6. Contract Clause 52.232-27, “Prompt Payment for Construction Contracts” requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
7. The Contracting Officer who signs the task order will be the Principal Contracting Officer for the task order.
However, any Contracting Officer assigned to the Los Angeles, contracting within their authority, may take formal action on the task order when the Principal Contracting Officer is unavailable and the action needs to be take
8. Amounts and prices shall be indicated in either words or figures, NOT BOTH.
9. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractor’s attention is directed to Contract Clause 52.232-33 “Mandatory Information for Electronic Funds Transfer.”
SECTION 00 10 00 – PRICE SCHEDULE - 3
10. The Government will review all submitted Price Schedules for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may be considered unacceptable and may cause the Offeror to be ineligible for award.
11. The Offeror shall furnish all plant, labor, material (excluding any Government furnished material that is detailed within this RFP) equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in this solicitation, to include all attachments thereto.
12. PLEASE NOTE: Submit solicitation inquiries in accordance with the instructions found in Section 00 21 16, 52.0000-4010 entitled “Inquiries”. Inquires MUST be received no later than five (5) business days prior to proposal due date.
13 Construciton shall start with CLIN 03 and 04.
14 Please note that there will be no work during the Saguro Fruit harvest location (End of June to Mid of July) and the Gu Vo Cerimonial hunt. (August)
15 .Limited access to GAG (Casa Grande) sites west of the Vamori Wash during the Monsoon Season.
16. Construction work week shall be limited to Monday through Friday (7-5) excluding Federal and Tribal Holidays.
17 The evaluation will be be based on base bid only, options are excluded from the evaluations
IFT SITE PREP AJO & CASA GRANDE AOR
TOHONO O’ODHAM NATION SECTION 00 21 165 W912PL19R0011
00 21 16 - 1
Section 00 21 16 - Instructions to Proposers
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code
Reporting
JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance
JUL 2016
52.204-22 Alternative Line Item Proposal JAN 2017 52.211-1 Availability of Specifications Listed in the GSA
Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29
AUG 1998
52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
APR 2014
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-22 Limitations on Pass-Through Charges-- Identification of Subcontract Effort
OCT 2009
52.217-3 Evaluation Of Options APR 1984 52.222-5 Construction Wage Rate Requirements--Secondary
Site of the Work
MAY 2014
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.232-38 Submission of Electronic Funds Transfer
Information with Offer
JUL 2013
52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense
Information Controls
OCT 2016
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.0000-4010 INQUIRIES
52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) Error! Bookmark not defined.
00 21 16 - 2
52.211-4 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX
OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988)
..................................................................................................................................... Error! Bookmark not defined.
52.216-1 TYPE OF CONTRACT (APR 1984)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
52.233-2 SERVICE OF PROTEST (SEP 2006)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
52.0000-4010 INQUIRIES
1. Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders/offerors before submission of their bids/offers. Oral explanations or instructions given before award of a contract are not binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if lack of it would be prejudicial to other prospective bidders/offerors.
2. All inquiries relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
A. To submit and review bid inquiry items, bidders will need to be a current registered user, or self register into the ProjNet system.
To access the Bid Inquiry system, go to the ProjNet web page and fill in:
- Managing Agency - USACE
- Email address
- Key Access (this is the Bidder Inquiry Key - see below for key)
- Click on “Sign In”
- You will be prompted for the answer to your secret question on the next screen http://www.projnet.org/projnet
00 21 16 - 3
If this is your first time accessing ProjNet, you will be directed to a screen titled “User account not found. Please create one using the form below”. Fill in the requested information (name, company, city, phone #, etc)
B. From this page, you may view all bidder inquiries or add an inquiry. Please Note:
Offerors shall only submit one question per inquiry. All inquiries containing multiple questions may be rejected.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by the technical team.
D. The Solicitation Number is: W912PL19R0011.
The Bidder Inquiry Key is: RF3DWB-E89X7C
3. The Bidder Inquiry System will be unavailable for new inquiries 5 business days prior to bid/proposal submission in order to ensure adequate time allotted to form an appropriate response and amend the solicitation if necessary.
4. Offerors are requested to review the specifications in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
5. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
6. Responses on the Bidder Inquiry System do not revise, change, amend or supersede the provisions of the solicitation. Changes to the solicitation must be by written amendment thereto. Any Bidder Inquiry System response that can be interpreted to be in conflict with the solicitation or amendment, shall be subordinate to the conflicting provision, term, and/or note, wherever it appears in the solicitation, until revised or altered by a written amendment to the solicitation.
Additionally, offerors may not anticipate a change to the solicitation until the change, revision, correction, or alteration of the solicitation is actually made, in writing and published as an amendment to the solicitation
(End of provision)
00 21 16 - 4
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.
(End of provision)
FAR 52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984) The Government will evaluate offers for award purposes by including only the price for the basic requirement;
i.e.,options will not be included in the evaluation for award purposes.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
25.0 – 30.0% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole
00 21 16 - 5 purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Tohono O'dham Nation, which is located southwest of Tucson, AZ, Pima County, AZ
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers, 915 Wilisre Bldg, Suie 930 Attn: CESPL-CTE Sandra Oquita Los Angeles, CA 90017
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and
00 21 16 - 6
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
May 29 and May 30. The start time will be at 8:00 am. The POC is Karl Ahlen and PH # is 213 280 8580
(c) Participants will meet at-- Everyone will meet at the San Miguel Gate which is at the end of IR 19. The directions are to drive to Seles AZ 86 go south on IR 19 until there is a 90 degree left turn. Go onto the gravel road and stop by the gate at the border. 31O33’18.39” N and 111o46”12.25”W
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
NA
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
00 21 16 - 7
(b) The use in this solicitation of any NA (48 CFR Chapter NA) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
IFT SITE PREP AJO & CASA GRANDE AOR W912PL-19-R-0011
SECTION 00 22 00 - 1
SECTION 00 22 00 - SUPPLEMENTARY INSTRU1CTIONS
I. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSAL
II. GENERAL INSTRUCTIONS
III. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL, VOLUME 1
IV. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL, VOLUME 2
V. TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS
VI. PROPOSAL EXPENSE AND PRE-AWARD COSTS
VII. ATTACHMENTS
SECTION 00 22 00 - 2
I. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSAL
A. EACH OFFEROR MUST SUBMIT BOTH A PRICE PROPOSAL AND A
TECHNICAL PROPOSAL. THE PRICE PROPOSAL AND THE TECHNICAL
PROPOSAL MUST BE SUBMITTED AS SEPARATE (I.E., PHYSICALLY
DISTINCT) VOLUMES. BOTH THE PRICE PROPOSAL AND THE TECHNICAL
PROPOSAL MUST BE RECEIVED BY THE CLOSING DATE AND TIME SET FOR
RECEIPT OF PROPOSALS.
B. THE PRICE PROPOSAL (VOLUME 1) MUST INCLUDE THE SIGNED
ACKNOWLEDGEMENT SHEET(STANDARD FORM SF-1442, BLOCK #19),
INCLUDING ACKNOWLEDGEMENT OF ALL AMENDMENTS; THE
COMPLETED PRICING SCHEDULE; THE OFFEROR’S OFFICIAL ONLINE ORCA
REPRESENTATIONS AND CERTIFICATIONS; BID BOND, AND ANY OTHER
REQUIREMENTS DESCRIBED IN PARAGRAPH 3 BELOW.
C. THE TECHNICAL PROPOSAL (VOLUME 2) CONSISTS OF ALL INFORMATION
AND MATERIAL SUBMITTED OR PROVIDED FOR EVALUATION IN RESPONSE
TO THE TECHNICAL (NON-COST) EVALUATION FACTORS SPECIFIED IN
BOTH THIS SECTION AND SECTION 00 22 16: SUPPLEMENTARY
INSTRUCTIONS TO PROPOSERS. THE PURPOSE OF THE TECHNICAL
EVALUATION IS TO ASSESS THE QUALITY OF EACH OFFER (I.E., THE
QUALITY OF THE PROPOSED PRODUCT OR SERVICE), TO DETERMINE THE
CAPABILITY OF EACH OFFEROR, AND TO DETERMINE THE ABILITY OF
EACH OFFEROR TO PERFORM THE PERSPECTIVE CONTRACT
SUCCESSFULLY.
D. OFFERORS SUBMITTING PROPOSALS FOR THIS PROJECT SHOULD LIMIT
SUBMISSION TO DATA ESSENTIAL FOR EVALUATION OF PROPOSALS SO
THAT A MINIMUM OF TIME AND MONIES WILL HAVE BEEN EXPENDED IN
PREPARING THE INFORMATION REQUIRED HEREIN. HOWEVER, IN ORDER
TO BE EFFECTIVELY AND EQUITABLY EVALUATED, THE PROPOSALS MUST
INCLUDE INFORMATION SUFFICIENTLY DETAILED TO CLEARLY DESCRIBE
THE OFFEROR’S RESPONSES TO THE SOLICITATION FACTORS WHICH MAY
OR MAY NOT REQUIRE SUCH DETAILS ON EXPERIENCE, TECHNICAL
APPROACH AND MANAGEMENT CAPABILITIES TO SUCCESSFULLY
COMPLETE THE PROJECT. PROPOSALS SHOULD FOLLOW THE ORDER
SEQUENCE SET FORTH IN THE RFP. INFORMATION PROVIDED OUT OF
SEQUENCE WILL NOT BE EVALUATED AND MAY RESULT IN THE
OFFEROR’S DISQUALIFICATION FROM AWARD.
SECTION 00 22 00 - 3
II. GENERAL INSTRUCTIONS
A. WRITTEN PROPOSAL MATERIALS SHALL BE SUBMITTED IN STANDARD
THREE RING LOOSE-LEAF BINDERS AND ON A CD-ROM USING A
SEARCHABLE “.PDF” FORMAT. PROPOSALS SHALL BE TABBED AND
LABELED IN A MANNER TO AFFORD EASY IDENTIFICATION FROM A TABLE
OF CONTENTS. FONT SIZE SHALL NOT BE LESS THAN 10 POINT. EACH
PAGE SHALL BE IDENTIFIED WITH THE APPROPRIATE PAGE NUMBER
CENTERED AT THE BOTTOM OF THE PAGE. SHEET SIZE OF THE PROPOSAL
CONTENTS SHALL BE 8-1/2 INCHES X 11 INCHES. THE PROPOSED
PRELIMINARY CONSTRUCTION SCHEDULE SHEET SIZE MAY BE 11 INCHES
X 17 INCHES AND WILL COUNT AS ONE PAGE. OFFERORS THAT DO NOT
MEET THESE REQUIREMENTS MAY BE SUBJECT TO REJECTION.
B. PROPOSAL REVISIONS SHALL BE SUBMITTED AS PAGE REPLACEMENTS
WITH REVISED TEXT READILY IDENTIFIABLE, E.G., BOLD FACE PRINT OR
UNDERLINING. THE SOURCE OF THE REVISION, E.G., ERROR, OMISSION, OR
CLARIFICATION, OR AMENDMENT SHALL ALSO BE ANNOTATED FOR EACH
REVISION. PROPOSAL REPLACEMENT PAGES SHALL BE NUMBERED,
SHALL BE CLEARLY MARKED “REVISED” SHALL SHOW THE DATE OF THE
REVISION, SHALL BE SUBMITTED IN APPROPRIATE NUMBER OF COPIES
E.G., IF TWO (2) COPIES OF THE ORIGINAL PAGE WERE REQUIRED, THEN
TWO (2) COPIES OF THE REVISED PAGE WILL ALSO BE REQUIRED, AND
SHALL BE A DIFFERENT COLOR THAN THE ORIGINAL PAGE THEY ARE TO
REPLACE.
C. PLEASE ENSURE THAT THE OUTSIDE OF EACH SEPARATE VOLUME IS
CLEARLY MARKED TO INDICATE ITS CONTENTS AND THE IDENTITY OF
THE OFFEROR. ADDITIONALLY, THE ORIGINAL COST/PRICE PROPOSAL
AND ORIGINAL TECHNICAL PROPOSAL SHOULD BE CLEARLY INDICATED
ON THE OUTSIDE COVER.
D. “CONFIDENTIAL” PROJECTS CANNOT BE SUBMITTED TO DEMONSTRATE
CAPABILITY UNLESS ALL OF THE INFORMATION REQUIRED FOR
EVALUATION PURPOSES AS SPECIFIED HEREIN CAN NONETHELESS BE
PROVIDED TO THE GOVERNMENT AS PART OF THE OFFEROR’S TECHNICAL
PROPOSAL. OFFERORS THAT INCLUDE IN THEIR PROPOSALS
INFORMATION THAT THEY DO NOT WANT TO DISCLOSE TO THE PUBLIC
FOR ANY PURPOSE, OR USED BY THE GOVERNMENT EXCEPT FOR
EVALUATION PURPOSES, MUST BE CLEARLY MARKED IN ACCORDANCE
WITH THE INSTRUCTIONS AT FAR 52.215-1, “INSTRUCTIONS TO OFFEROR-
COMPETITIVE ACQUISITION,” PARAGRAPH (3), “RESTRICTIONS ON
DISCLOSURE AND USE OF DATA.”
E. DRAWINGS, SKETCHES AND SCHEDULES SUBMITTED AS PART OF
SECTION 00 22 00 - 4
OFFEROR’S VOLUME 2, TECHNICAL PROPOSAL, SHALL ONLY BE USED FOR
THE PURPOSE OF EVALUATING THE PROPOSAL. SUCH DOCUMENTS SHALL
NOT BE THE BASIS FOR ALTERING THE REQUIREMENTS, TERMS AND
CONDITIONS OF THE SOLICITATION. THE PROJECT DURATION AS STATED
IN SECTION 00 73 00 SUPPLEMENTARY CONDITIONS PARAGRAPH 52.211-10
“COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
IS AS SET FORTH THEREIN.
III. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL, VOLUME 1
A. NUMBER OF SETS OF THE PRICE PROPOSAL
SUBMIT THE PRICE PROPOSAL AS FOLLOWS: ONE ORIGINAL AND ONE
HARDCOPY (I.E., THE ORIGINAL AND HARDCOPY PACKAGED TOGETHER).
B. FORMAT AND CONTENTS OF THE PRICE PROPOSAL/LIST OF TABS
THE ORIGINAL AND ALL COPIES OF THE PRICE PROPOSAL SHALL BE
APPROPRIATELY LABELED AS SUCH, SHALL BE ORGANIZED AS
INDICATED BELOW, AND SHALL BE COMPRISED OF THE FOLLOWING:
PROPOSAL COVER SHEET. THE PROPOSAL COVER SHEET IS REQUIRED
BY FAR 52.215-1(C) (2). THIS PROVISION, ENTITLED “INSTRUCTIONS TO
OFFERORS—COMPETITIVE ACQUISITION,” HAS BEEN INCLUDED IN FULL
TEXT IN SECTION 00 21 00 INSTRUCTIONS. PROVIDE THE FOLLOWING
INFORMATION IN THE PROPOSAL COVER SHEET:
• SOLICITATION NUMBER.
• NAME, ADDRESS, TELEPHONE AND FACSIMILE NUMBERS OF THE
OFFEROR (AND EMAIL ADDRESS IF AVAILABLE).
• DUNS, CAGE, AND TAX IDENTIFICATION NUMBERS OF THE OFFEROR.
• STATEMENT SPECIFYING THE EXTENT OF AGREEMENT WITH ALL
TERMS, CONDITIONS, AND PROVISIONS INCLUDED IN THE
SOLICITATION AND THE OFFEROR’S AGREEMENT TO FURNISH ANY OR
ALL ITEMS UPON WHICH PRICES ARE OFFERED; AT THE PRICE SET
OPPOSITE EACH ITEM AS REFLECTED ON THE PROPOSAL SCHEDULE.
• NAMES, TITLES, TELEPHONE AND FACSIMILE NUMBERS (AND EMAIL
ADDRESSES IF AVAILABLE) OF PERSONS AUTHORIZED TO NEGOTIATE
ON THE OFFEROR’S BEHALF WITH THE GOVERNMENT IN CONNECTION
WITH THIS SOLICITATION.
• ACKNOWLEDGMENT THAT THE OFFEROR’S SYSTEM FOR AWARD
MANAGEMENT REGISTRATION IS CURRENT PER FAR CLAUSE 52.204-7,
SYSTEM FOR AWARD MANAGEMENT AND DFARS 252.204-7004,
ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT.
SECTION 00 22 00 - 5
TAB CONTENTS OF THE PRICE PROPOSAL
#1 TAB 1 SHALL CONTAIN THE COMPLETED SF 1442, ENTITLED
“SOLICITATION, OFFER AND AWARD” FRONT AND BACK; CERTIFICATE
OF CORPORATE PRINCIPAL, COMPLETED AS APPLICABLE, INCLUDING
CORPORATE SEAL, IF ANY.
#2 SECTION 00 10 00, CONTRACT LINE ITEM NUMBER SCHEDULE. THE
COMPLETED CONTRACT LINE ITEM NUMBER SCHEDULE WITH THE
OFFEROR’S PROPOSED CONTRACT LINE ITEM PRICES INSERTED IN THE
APPROPRIATE SPACES. PRICES MUST BE PROPOSED FOR ALL
CONTRACT LINE ITEMS AND PRICES SUB-LINE ITEMS. UNIT PRICES ARE
TO BE EXTENDED TO THE ACTUAL “DOLLAR AND CENTS” AMOUNTS
(I.E., TO TWO DECIMAL PLACES). DO NOT ROUND OFF TO THE NEAREST
DOLLAR. CHECK YOUR PRICING SUBMISSIONS VERY CAREFULLY FOR
MATHEMATICAL AND CLERICAL ERRORS PRIOR TO SUBMISSION.
#3 OFFICIAL ONLINE SAM (SYSTEM OF AWARD MANAGEMENT)
REPRESENTATIONS & CERTIFICATIONS
#4 A BID GUARANTEE, STANDARD FORM 24, “BID BOND.”
#5 TEAMING AGREEMENT OR IRREVOCABLE SUBCONTRACTOR OFFERS (IF
APPLICABLE)
IV. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL, VOLUME 2
A. THE TECHNICAL PROPOSAL SHALL NOT INCLUDE ANY COST
INFORMATION AND SHALL NOT EXCEED 35 PAGES.
VOLUME 2, TECHNICAL PROPOSAL, SHALL NOT EXCEED 35 PAGES,
EXCLUDING THE PROPOSAL COVER SHEET, TABLE OF CONTENTS, TAB
DIVIDERS. ALSO THE PAST PERFORMANCE QUESTIONNAIRES (PPQ),
PERFORMANCE EVALUATIONS FROM PAST PERFORMANCE INFORMATION
RETRIEVAL SYSTEM (PPIRS), INCLUDING CONTRACTOR PERFORMANCE
ASSESSMENT REPORTING SYSTEM (CPARS) WILL NOT COUNT AGAINST
THE PAGE LIMITATION. THE GOVERNMENT WILL NOT BE OBLIGATED TO
EVALUATE ANY INFORMATION BEYOND THE 35 PAGE LIMITATION NOTED
ABOVE. THE OFFEROR SHALL NOT SUBMIT VERBATIM SECTIONS OF THIS
SOLICITATION AS PART OF THEIR PROPOSAL. OFFERORS THAT DO NOT
MEET THESE REQUIREMENTS MAY BE SUBJECT TO REJECTION.
B. NUMBER OF SETS OF THE TECHNICAL PROPOSAL
SECTION 00 22 00 - 6
SUBMIT THE ORIGINAL AND THREE (3) ADDITIONAL SETS OF THE WRITTEN
TECHNICAL PROPOSAL (I.E., THE ORIGINAL AND THREE (3)) COPIES OF ALL OF
THE INFORMATION REQUIRED BELOW, WITH EACH SET SEPARATELY
PACKAGED). AN ELECTRONIC COPY OF VOLUME 2 SHALL BE SUBMITTED ON
A CD-ROM USING A SEARCHABLE “.PDF” FORMAT.
C. FORMAT AND CONTENTS OF THE TECHNICAL PROPOSAL/LIST OF TABS
THE ORIGINAL AND ALL COPIES OF THE TECHNICAL PROPOSAL SHALL
BE APPROPRIATELY LABELED AS SUCH, SHALL BE ORGANIZED AS
INDICATED BELOW, AND SHALL BE COMPRISED OF THE FOLLOWING:
THE PROPOSAL COVER SHEET AS REQUIRED BY FAR 52.215-1(C)(I)(V). THIS
PROVISION, TITLED “INSTRUCTIONS TO OFFERORS-COMPETITIVE
ACQUISITION,” IS PROVIDED IN FULL TEXT IN SECTION 00 21 00
INSTRUCTIONS.
THE ORIGINAL AND ALL COPIES OF THE TECHNICAL PROPOSAL SHALL BE
APPROPRIATELY LABELED AS SUCH, SHALL BE ORGANIZED AS INDICATED
BELOW, AND SHALL BE COMPRISED OF THE FOLLOWING:
TAB CONTENTS OF THE TECHNICAL PROPOSAL
TAB #1 FACTOR 1: ENVIRONMENTAL COMPLIANCE
TAB #2 FACTOR 2: TECHNICAL APPROACH
TAB #3 FACTOR 3: PAST EXPERIENCE
TAB #4 FACTOR 4: KEY PERSONNEL
TAB #5 FACTOR 5: PAST PERFORMANCE
TAB #6 FACTOR 6: SCHEDULE
V. TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS
SECTION 00 22 00 - 7
SEE ATTACHED FORMS AT THE END OF THIS SECTION AND SECTION 00 22 16
FOR PROPOSAL SUBMISSION REQUIREMENTS, LIST OF EVALUATION FACTORS,
FOR MORE DETAILS.
VI. PROPOSAL EXPENSE AND PRE-AWARD COSTS
THIS REQUEST FOR PROPOSAL DOES NOT COMMIT THE GOVERNMENT TO
PAY ANY COSTS INCURRED IN THE PREPARATION AND SUBMISSION OF
THE INITIAL AND ANY SUBSEQUENT PROPOSALS OR FOR ANY COSTS
INCURRED PRIOR TO EXECUTION OF A FORMAL CONTRACT.
VII. ATTACHMENTS
ATTACHMENT # 1: PROJECT EXPERIENCE FORM (TAB 3)
ATTACHMENT # 2: COVER LETTER AND PAST PERFORMANCE QUESTIONNAIRE
(PPQ) (TAB 5)
ATTACHMENT # 3: PERFORMANCE ASSESSMENT REPORT (PAR) (TAB 5)
ATTACHMENT # 4: PERSONNEL RESUME FORM (TAB 4)
SECTION 00 22 00 - 8
ATTACHMENT # 1
PROJECT EXPERIENCE FORM
(TAB 3)
OFFEROR’S NAME:
PROVIDE A COMPLETED FORM FOR EACH PROJECT FOR
WHICH EXPERIENCE IS BEING CLAIMED. EXPERIENCE
PROVIDED FOR (CHECK MORE THAN ONE BOX IF
APPLICABLE):
[ ] OFFEROR:
[ ] KEY CONSTRUCTION SUBCONTRACTOR:
WAS PROJECT A FIRM-FIXED-PRICE CONTRACT (Y/N)?
IF NO, WHAT TYPE WAS IT?
PROJECT NAME:
PROJECT LOCATION:
OWNER/CLIENT:
FOR THIS PROJECT FOR WHICH EXPERIENCE IS BEING CLAIMED, FIRM(S)
WORKED AS THE [ ] PRIME CONTRACTOR; OR [ ] SUBCONTRACTOR. IF
EXPERIENCE IS PROVIDED FOR MORE THAN ONE FIRM, CHECK MORE THAN ONE
BOX AS APPROPRIATE FOR EACH FIRM LISTED.
SECTION 00 22 00 - 9
BRIEF DESCRIPTION OF PROJECT (INCLUDE, AS APPLICABLE, HOW PROJECT
IS SIMILAR IN SCOPE AND MAGNITUDE TO THE WORK REQUIRED IN THIS
RFP)
CONSTRUCTION CONTRACT AMOUNT OR DESIGN FEE (FOR DESIGNER):
ORIGINAL CONTRACT COMPLETION DATE: ________________________
FINAL CONTRACT COMPLETION DATE: ________________________
ACTUAL COMPLETION DATE: ________________________
PERCENT OF COMPLETION (IF PROJECT IS CURRENTLY UNDER CONSTRUCTION)
EXPLANATION OF ANY LATE FINISH:
WAS THE PROJECT TERMINATED EARLY OR WERE CURE/SHOW CAUSE LETTERS
RECEIVED? ___YES ___NO
EXPLAIN EARLY TERMINATION (DEFAULT/CONVENIENCE) OR CURE/SHOW
CAUSE LETTERS
SAFETY RECORD: ____INJURIES WITH LOST WORKDAYS*, ____INJURIES WITHOUT
LOST WORKDAYS*
(*USE THE NUMBER REPORTED ON OSHA FORM NO. 200 OR EQUIVALENT)
LIST AND EXPLAIN ANY CUSTOMER CONCERNS OR DISSATISFACTION. EXPLAIN
HOW YOU RESPONDED.
SMALL BUSINESS SUBCONTRACTING (COMPLETE FOR OFFEROR (PRIME
CONTRACTOR) ONLY):
SECTION 00 22 00 - 10
LARGE BUSINESS OFFERORS ONLY: WHAT WERE T\HE VARIOUS SMALL
BUSINESS PERCENTAGE GOALS IN THE
ORIGINAL CONTRACT, IF APPLICABLE (SEE FAR 52.219-9)? SDB: _______ WOB:
SMALL BUSINESS: _______ VETERAN-OWNED: _______ HUBZONE: _______
WHAT WAS THE ACTUAL PERCENT ACHIEVED AT CONTRACT COMPLETION? SDB:
_______ WOB: _______
SMALL BUSINESS: _______ VETERAN-OWNED: _______ HUBZONE: _______
EXPLANATION—IF GOALS WERE NOT MET:
SECTION 00 22 00 - 11
ATTACHMENT #2
NAVFAC / USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ)
OWNER/CLIENT PAST PERFORMANCE SURVEY
(TAB 5)
SECTION 00 22 00 - 12
SAMPLE COVER LETTER
DATE
SUBJECT: NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE
NAME AND
ADDRESS OF
REFERENCE
LADIES AND GENTLEMEN:
THE U.S. ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT, IS
CONDUCTING A REVIEW OF OUR PAST PERFORMANCE HISTORY AS PART OF
AN UPCOMING SOURCE SELECTION ACQUISITION.
PLEASE COMPLETE THE ATTACHED NAVFAC/USACE PAST PERFORMANCE
QUESTIONNAIRE TO AID THE GOVERNMENT IN ITS EVALUATION OF OUR PAST
PERFORMANCE AND FAX IT DIRECTLY TO THE U.S. ARMY CORPS OF
ENGINEERS, ATTN: CHRISTINA CHAVEZ AT (213) 452-43246. IF YOU PREFER, YOU
MAY PROVIDE THE REQUESTED INFORMATION BY EMAIL TO
CHRISTINA.CHAVEZ@USACE.ARMY.MIL..
THE GOVERNMENT IS REQUESTING RECEIPT OF THIS INFORMATION BY 2:00
P.M. ON 27 JUNE 2019.
YOU ARE ADVISED THAT IT IS GOVERNMENT POLICY THAT THE IDENTITY OF
SOURCES PROVIDING PAST PERFORMANCE INFORMATION WILL NOT BE
RELEASED OUTSIDE THE GOVERNMENT.
WE APPRECIATE YOUR EFFORTS TO HELP THE GOVERNMENT FAIRLY
EVALUATE OUR RECORD OF PAST PERFORMANCE. SHOULD YOU HAVE ANY
QUESTIONS RELATED TO THIS MATTER, PLEASE CONTACT MS. CHAVEZ AT
TELEPHONE (213) 452-3246.
SINCERELY,
CONTRACTOR
ATTACHMENT
mailto:Christina.chavez@usace.army.mil
SECTION 00 22 00 - 13
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (FORM PPQ-0)
CONTRACT INFORMATION (CONTRACTOR TO COMPLETE BLOCKS 1-4)
1. CONTRACTOR INFORMATION
FIRM NAME: CAGE CODE:
ADDRESS: DUNS NUMBER:
PHONE NUMBER:
EMAIL ADDRESS:
POINT OF CONTACT: CONTACT PHONE NUMBER:
2. WORK PERFORMED AS: PRIME CONTRACTOR SUB CONTRACTOR JOINT
VENTURE OTHER (EXPLAIN)
PERCENT OF PROJECT WORK PERFORMED:
IF SUBCONTRACTOR, WHO WAS THE PRIME (NAME/PHONE #):
3. CONTRACT INFORMATION
CONTRACT NUMBER:
DELIVERY/TASK ORDER NUMBER (IF APPLICABLE):
CONTRACT TYPE: FIRM FIXED PRICE COST REIMBURSEMENT OTHER (PLEASE SPECIFY):
CONTRACT TITLE:
CONTRACT LOCATION:
AWARD DATE (MM/DD/YY):
CONTRACT COMPLETION DATE (MM/DD/YY):
ACTUAL COMPLETION DATE (MM/DD/YY):
EXPLAIN DIFFERENCES:
ORIGINAL CONTRACT PRICE (AWARD AMOUNT):
FINAL CONTRACT PRICE (TO INCLUDE ALL MODIFICATIONS, IF APPLICABLE):
EXPLAIN DIFFERENCES:
4. PROJECT DESCRIPTION:
COMPLEXITY OF WORK HIGH MED ROUTINE
HOW IS THIS PROJECT RELEVANT TO PROJECT OF SUBMISSION? (PLEASE PROVIDE DETAILS SUCH AS
SIMILAR EQUIPMENT, REQUIREMENTS, CONDITIONS, ETC.)
CLIENT INFORMATION (CLIENT TO COMPLETE BLOCKS 5-8)
5. CLIENT INFORMATION
NAME:
TITLE:
PHONE NUMBER:
EMAIL ADDRESS:
6. DESCRIBE THE CLIENT’S ROLE IN THE PROJECT:
7. DATE QUESTIONNAIRE WAS COMPLETED (MM/DD/YY):
8. CLIENT’S SIGNATURE:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
SECTION 00 22 00 - 14
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) EXCEPTIONAL PERFORMANCE MEETS CONTRACTUAL
REQUIREMENTS AND EXCEEDS MANY TO
THE GOVERNMENT/OWNER’S BENEFIT.
THE CONTRACTUAL PERFORMANCE OF
THE ELEMENT OR SUB-ELEMENT BEING
ASSESSED WAS ACCOMPLISHED WITH
FEW MINOR PROBLEMS FOR WHICH
CORRECTIVE ACTIONS TAKEN BY THE
CONTRACTOR WAS HIGHLY EFFECTIVE.
AN EXCEPTIONAL RATING IS
APPROPRIATE WHEN THE
CONTRACTOR SUCCESSFULLY
PERFORMED MULTIPLE
SIGNIFICANT EVENTS THAT WERE
OF BENEFIT TO THE
GOVERNMENT/OWNER. A
SINGULAR BENEFIT, HOWEVER,
COULD BE OF SUCH MAGNITUDE
THAT IT ALONE CONSTITUTES AN
EXCEPTIONAL RATING. ALSO,
THERE SHOULD HAVE BEEN NO
SIGNIFICANT WEAKNESSES
IDENTIFIED.
(VG) VERY GOOD PERFORMANCE MEETS CONTRACTUAL
REQUIREMENTS AND EXCEEDS SOME TO
THE GOVERNMENT’S/OWNER’S BENEFIT.
THE CONTRACTUAL PERFORMANCE OF
THE ELEMENT OR SUB-ELEMENT BEING
ASSESSED WAS ACCOMPLISHED WITH
SOME MINOR PROBLEMS FOR WHICH
CORRECTIVE ACTIONS TAKEN BY THE
CONTRACTOR WERE EFFECTIVE.
A VERY GOOD RATING IS
APPROPRIATE WHEN THE
CONTRACTOR SUCCESSFULLY
PERFORMED A SIGNIFICANT EVENT
THAT WAS A BENEFIT TO THE
GOVERNMENT/OWNER. THERE
SHOULD HAVE BEEN NO
SIGNIFICANT WEAKNESSES
IDENTIFIED.
(S)
SATISFACTORY
PERFORMANCE MEETS MINIMUM
CONTRACTUAL REQUIREMENTS. THE
CONTRACTUAL PERFORMANCE OF THE
ELEMENT OR SUB-ELEMENT CONTAINS
SOME MINOR PROBLEMS FOR WHICH
CORRECTIVE ACTIONS TAKEN BY THE
CONTRACTOR APPEAR OR WERE
SATISFACTORY.
A SATISFACTORY RATING IS
APPROPRIATE WHEN THERE WERE
ONLY MINOR PROBLEMS, OR
MAJOR PROBLEMS THAT THE
CONTRACTOR RECOVERED FROM
WITHOUT IMPACT TO THE
CONTRACT. THERE SHOULD HAVE
BEEN NO SIGNIFICANT
WEAKNESSES IDENTIFIED. PER DOD
POLICY, A FUNDAMENTAL
PRINCIPLE OF ASSIGNING RATINGS
IS THAT CONTRACTORS WILL NOT
BE ASSESSED A RATING LOWER
THAN SATISFACTORY SOLELY FOR
NOT PERFORMING BEYOND THE
REQUIREMENTS OF THE
CONTRACT.
(M) MARGINAL PERFORMANCE DOES NOT MEET SOME
CONTRACTUAL REQUIREMENTS. THE
CONTRACTUAL PERFORMANCE OF THE
ELEMENT OR SUB-ELEMENT BEING
ASSESSED REFLECTS A SERIOUS
PROBLEM FOR WHICH THE CONTRACTOR
HAS NOT YET IDENTIFIED CORRECTIVE
ACTIONS. THE CONTRACTOR'S
PROPOSED ACTIONS APPEAR ONLY
MARGINALLY EFFECTIVE OR WERE NOT
FULLY IMPLEMENTED.
A MARGINAL IS APPROPRIATE
WHEN A SIGNIFICANT EVENT
OCCURRED THAT THE
CONTRACTOR HAD TROUBLE
OVERCOMING WHICH IMPACTED
THE GOVERNMENT/OWNER.
SECTION 00 22 00 - 15
(U)
UNSATISFACTORY
PERFORMANCE DOES NOT MEET MOST
CONTRACTUAL REQUIREMENTS AND
RECOVERY IS NOT LIKELY IN A TIMELY
MANNER. THE CONTRACTUAL
PERFORMANCE OF THE ELEMENT OR
SUB-ELEMENT CONTAINS SERIOUS
PROBLEM(S) FOR WHICH THE
CONTRACTOR'S CORRECTIVE ACTIONS
APPEAR OR WERE INEFFECTIVE.
AN UNSATISFACTORY RATING IS
APPROPRIATE WHEN MULTIPLE
SIGNIFICANT EVENTS OCCURRED
THAT THE CONTRACTOR HAD
TROUBLE OVERCOMING AND
WHICH IMPACTED THE
GOVERNMENT/OWNER. A
SINGULAR PROBLEM, HOWEVER,
COULD BE OF SUCH SERIOUS
MAGNITUDE THAT IT ALONE
CONSTITUTES AN
UNSATISFACTORY RATING.
(N) NOT
APPLICABLE
NO INFORMATION OR DID NOT APPLY TO
YOUR CONTRACT
RATING WILL BE NEITHER
POSITIVE NOR NEGATIVE.
SECTION 00 22 00 - 16
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
A) QUALITY OF TECHNICAL DATA/REPORT PREPARATION
EFFORTS E VG S M U N
B) ABILITY TO MEET QUALITY STANDARDS SPECIFIED FOR
TECHNICAL PERFORMANCE E VG S M U N
C) TIMELINESS/EFFECTIVENESS OF CONTRACT PROBLEM
RESOLUTION WITHOUT EXTENSIVE CUSTOMER GUIDANCE E VG S M U N
D) ADEQUACY/EFFECTIVENESS OF QUALITY CONTROL PROGRAM
AND ADHERENCE TO CONTRACT QUALITY ASSURANCE
REQUIREMENTS (WITHOUT ADVERSE EFFECT ON PERFORMANCE)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
A) COMPLIANCE WITH CONTRACT DELIVERY/COMPLETION
SCHEDULES INCLUDING ANY SIGNIFICANT INTERMEDIATE
MILESTONES. (IF LIQUIDATED DAMAGES WERE ASSESSED OR THE
SCHEDULE WAS NOT MET, PLEASE ADDRESS BELOW)
E VG S M U N
B) RATE THE CONTRACTOR’S USE OF AVAILABLE RESOURCES TO
ACCOMPLISH TASKS IDENTIFIED IN THE CONTRACT E VG S M U N
3. CUSTOMER SATISFACTION:
A) TO WHAT EXTENT WERE THE END USERS SATISFIED WITH THE
PROJECT? E VG S M U N
B) CONTRACTOR WAS REASONABLE AND COOPERATIVE IN
DEALING WITH YOUR STAFF (INCLUDING THE ABILITY TO
SUCCESSFULLY RESOLVE DISAGREEMENTS/DISPUTES;
RESPONSIVENESS TO ADMINISTRATIVE REPORTS, BUSINESSLIKE
AND COMMUNICATION)
E VG S M U N
C) TO WHAT EXTENT WAS THE CONTRACTOR COOPERATIVE,
BUSINESSLIKE, AND CONCERNED WITH THE INTERESTS OF THE
CUSTOMER?
E VG S M U N
D) OVERALL CUSTOMER SATISFACTION E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
A) EFFECTIVENESS OF ON-SITE MANAGEMENT, INCLUDING
MANAGEMENT OF SUBCONTRACTORS, SUPPLIERS, MATERIALS,
AND/OR LABOR FORCE?
E VG S M U N
B) ABILITY TO HIRE, APPLY, AND RETAIN A QUALIFIED
WORKFORCE TO THIS EFFORT E VG S M U N
C) GOVERNMENT PROPERTY CONTROL E VG S M U N
D) KNOWLEDGE/EXPERTISE DEMONSTRATED BY CONTRACTOR
PERSONNEL E VG S M U N
E) UTILIZATION OF SMALL BUSINESS CONCERNS E VG S M U N
F) ABILITY TO SIMULTANEOUSLY MANAGE MULTIPLE PROJECTS
WITH MULTIPLE DISCIPLINES E VG S M U N
SECTION 00 22 00 - 17
G) ABILITY TO ASSIMILATE AND INCORPORATE CHANGES IN
REQUIREMENTS AND/OR PRIORITY, INCLUDING PLANNING,
EXECUTION AND RESPONSE TO GOVERNMENT CHANGES
E VG S M U N
H) EFFECTIVENESS OF OVERALL MANAGEMENT (INCLUDING
ABILITY TO EFFECTIVELY LEAD, MANAGE AND CONTROL THE
PROGRAM)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
A) ABILITY TO MEET THE TERMS AND CONDITIONS WITHIN THE
CONTRACTUALLY AGREED PRICE(S)? E VG S M U N
B) CONTRACTOR PROPOSED INNOVATIVE ALTERNATIVE
METHODS/PROCESSES THAT REDUCED COST, IMPROVED
MAINTAINABILITY OR OTHER FACTORS THAT BENEFITED THE
CLIENT
E VG S M U N
C) IF THIS IS/WAS A GOVERNMENT COST TYPE CONTRACT,
PLEASE RATE THE CONTRACTOR’S TIMELINESS AND ACCURACY
IN SUBMITTING MONTHLY INVOICES WITH APPROPRIATE BACK-
UP DOCUMENTATION, MONTHLY STATUS REPORTS/BUDGET
VARIANCE REPORTS, COMPLIANCE WITH ESTABLISHED BUDGETS
AND AVOIDANCE OF SIGNIFICANT AND/OR UNEXPLAINED
VARIANCES (UNDER RUNS OR OVERRUNS)
E VG S M U N
D) IS THE CONTRACTOR’S ACCOUNTING SYSTEM ADEQUATE FOR
MANAGEMENT AND TRACKING OF COSTS? IF NO, PLEASE
EXPLAIN IN REMARKS SECTION.
YES NO
E) IF THIS IS/WAS A GOVERNMENT CONTRACT, HAS/WAS THIS
CONTRACT BEEN PARTIALLY OR COMPLETELY TERMINATED FOR
DEFAULT OR CONVENIENCE OR ARE THERE ANY PENDING
TERMINATIONS? INDICATE IF SHOW CAUSE OR CURE NOTICES
WERE ISSUED, OR ANY DEFAULT ACTION IN COMMENT SECTION
BELOW.
YES NO
F) HAVE THERE BEEN ANY INDICATIONS THAT THE CONTRACTOR
HAS HAD ANY FINANCIAL PROBLEMS? IF YES, PLEASE EXPLAIN
BELOW.
YES NO
6. SAFETY/SECURITY
A) TO WHAT EXTENT WAS THE CONTRACTOR ABLE TO MAINTAIN
AN ENVIRONMENT OF SAFETY, ADHERE TO ITS APPROVED
SAFETY PLAN, AND RESPOND TO SAFETY ISSUES? (INCLUDES:
FOLLOWING THE USERS RULES, REGULATIONS, AND
REQUIREMENTS REGARDING HOUSEKEEPING, SAFETY,
CORRECTION OF NOTED DEFICIENCIES, ETC.)
E VG S M U N
B) CONTRACTOR COMPLIED WITH ALL SECURITY REQUIREMENTS
FOR THE PROJECT AND PERSONNEL SECURITY REQUIREMENTS. E VG S M U N
7. GENERAL
A) ABILITY TO SUCCESSFULLY RESPOND TO EMERGENCY AND/OR
SURGE SITUATIONS (INCLUDING NOTIFYING COR, PM OR
CONTRACTING OFFICER IN A TIMELY MANNER REGARDING
URGENT CONTRACTUAL ISSUES).
E VG S M U N
B) COMPLIANCE WITH CONTRACTUAL TERMS/PROVISIONS
(EXPLAIN IF SPECIFIC ISSUES) E VG S M U N
C) WOULD YOU HIRE OR WORK WITH THIS FIRM AGAIN? (IF NO,
PLEASE EXPLAIN BELOW) YES NO
SECTION 00 22 00 - 18
D) IN SUMMARY, PROVIDE AN OVERALL RATING FOR THE WORK
PERFORMED BY THIS CONTRACTOR. E VG S M U N
PLEASE PROVIDE RESPONSES TO THE QUESTIONS ABOVE (IF APPLICABLE) AND/OR
ADDITIONAL REMARKS. FURTHERMORE, PLEASE PROVIDE A BRIEF NARRATIVE
ADDRESSING SPECIFIC STRENGTHS, WEAKNESSES, DEFICIENCIES, OR OTHER
COMMENTS WHICH MAY ASSIST OUR OFFICE IN EVALUATING PERFORMANCE
RISK (PLEASE ATTACH ADDITIONAL PAGES IF NECESSARY):
SECTION 00 22 00 - 19
ATTACHMENT # 3:
PERFORMANCE ASSESSMENT REPORT (PAR)
(TAB 5)
PERFORMANCE ASSESSMENT REPORT
(TO BE COMPLETED BY OFFEROR)
1. CONTRACTOR (FIRM BEING
EVALUATED): NAME: ADDRESS:
2. CONTRACT NUMBER: TASK ORDER (TO)
NUMBER IF APPLICABLE:
3. SOLICITATION TYPE: NEGOTIATED OR SEALED
BID
4. CONTRACT/TO TYPE: FIXED-
PRICE COST, REIMBURSEMENT,
HYBRID (EXPLAIN)
5. ROUTINE DIFFICULT (LOW TO HIGH)
COMPLEXITY OF WORK 1 2 3 4 5
6. CONTRACT/TO DOLLAR VALUE:
7. CONTRACT/TO STATUS: ACTIVE
COMPLETE COMPLETION DATE (W/
EXTENSIONS):
8. DESCRIPTION, LOCATION & RELEVANCY OF WORK:
9. PROBLEMS ENCOUNTERED AND HOW RESOLVED:
10. NAME, ADDRESS, TELEPHONE NUMBER AND E-MAIL OF THE PROCURING
CONTRACTING OFFICER AND/OR THE CONTRACTING OFFICER’S REPRESENTATIVE (COR)
(AND OTHER REFERENCES, E.G., ADMINISTRATIVE CONTRACTING OFFICER, IF
APPLICABLE):
11. CHECK ONE OF THE FOLLOWING BLOCKS:
A WRITTEN PERFORMANCE EVALUATION WAS RECEIVED FOR THIS PROJECT AND IS
ATTACHED.
A WRITTEN PERFORMANCE EVALUATION WAS NOT RECEIVED FOR THIS PROJECT. A
PAST PERFORMANCE QUESTIONNAIRE (PPQ) HAS BEEN SENT TO THE REFERENCE(S)
LISTED IN BLOCK 10, WITH A LETTER REQUESTING THAT THE COMPLETED
QUESTIONNAIRE BE RETURNED DIRECTLY TO THE U.S. ARMY CORPS OF ENGINEERS BY
SECTION 00 22 00 - 20
ATTACHMENT #4
PERSONNEL RESUME FORM
(TAB 4)
CHECK APPLICABLE BLOCK:
KEY PERSONNEL:
[ ] HEALTH LIFE SAFETY OFFICER [ ] QUALITY CONTROL MANAGER [ ]
SUPERINTENDENT [ ] PROJECT MANAGER [ ] ENVIRONMENTAL COMPLIANCE
COORDINATOR
NAME OF INDIVIDUAL:
EMPLOYED BY:
NUMBER OF YEARS WITH FIRM:
NUMBER OF YEARS AS PRACTICING PROFESSIONAL IN YOUR CURRENT FIELD
EDUCATION (DEGREE(S)/YEAR/ SPECIALIZATION):
ACHIEVEMENTS, SPECIAL RECOGNITION, AND HONORS:
EXPERIENCE: (MOST RECENT TO EARLIEST)
PROJECT: _________________________________
COMPANY _____________________________________
DATES: FROM ________________________ TO PRESENT
TYPE OF CONSTRUCTION:
DUTIES & RESPONSIBILITIES:
PROJECT: _________________________________
SECTION 00 22 00 - 21
COMPANY _____________________________________
DATES: FROM ________________________ TO PRESENT
TYPE OF CONSTRUCTION:
DUTIES & RESPONSIBILITIES:
PROJECT: _________________________________
COMPANY _____________________________________
DATES: FROM ________________________ TO PRESENT
TYPE OF CONSTRUCTION:
DUTIES & RESPONSIBILITIES:
PROJECT: _________________________________
COMPANY _____________________________________
DATES: FROM ________________________ TO PRESENT
TYPE OF CONSTRUCTION:
DUTIES & RESPONSIBILITIES:
SECTION 00 22 00 - 22
SECTION 00 22 00 ATTACHMENT 3
PHASE 1 – VOLUME 1 - TAB C
RESUME FORM
RESUME FORM - KEY PERSONNEL AND QUALIFICATIONS
(COMPLETE ONE FORM FOR EACH KEY PERSON)
1. NAME AND TITLE:
2. ROLE IN THIS
CONTRACT:
3. NAME OF FIRM WITH WHICH ASSOCIATED
(CITY AND STATE):
4. YEARS EXPERIENCE AS
ROLE IN BLOCK 2:
TOTAL:________________
WITH CURRENT
FIRM:_____________
5. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE), IF
APPLICABLE:
6. EDUCATION (DEGREE AND SPECIALIZATION), IF APPLICABLE:
7. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS,
ORGANIZATIONS, TRAINING, AWARDS, ETC.):
8. SUMMARY OF RELEVANT EXPERIENCE:
A.
(1) TITLE AND LOCATION (CITY
AND STATE):
(2) DATES
STARTED/COMPLETED:
(3) PROJECT DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND
SPECIFIC ROLE:
B.
SECTION 00 22 00 - 23
C.
D.
SECTION 00 22 16 - 1
SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
I. ELIGIBILITY FOR CONTRACT AWARD
II. SOURCE SELECTION USING BEST VALUE TRADE OFF PROCESS
III. PROPOSAL SUBMITTAL
IV. INITIAL EVALUATION OF TECHNICAL PROPOSAL (VOLUME II)
V. EVALUATION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.