Am_0002_-_Sperry.pdf

PDF 89 KB Posted

Attached to
Drydock and Repair Dredge Wheeler
Solicitation number
W912P8-17-B-0032
Issued by

About this file

Am_0002 - Sperry Q2017-3-81

View the file

Other files

File Type Posted
A22_-_W912P817B0032,_Am_0004.pdf PDF
Am_0003.pdf PDF
Am_0002_-_70006-2560-055_(Overflow).pdf PDF
Am_0002_-_70006-2724-003.pdf PDF
Am_0002_-_70006-2726-003.pdf PDF
AM_0002.pdf PDF
Am_0002_-_Attachment_J-35_(Dredge_Pipes_in_Pump_Room_&_No_2_Voids).pdf PDF
Am_0002_-_70006-5473-901.pdf PDF
Am_0002_-_Attachment_J-34_(Hardox_400_Properties_and_Welding).pdf PDF
Am_0002_-_70006-2730-006.pdf PDF
Am_0002_Section_B.xls XLS spreadsheet
Am_0002_-_SECTION__J_TOC.PDF PDF
Am_0002_-_70006-2724-002.pdf PDF
AM_0001.pdf PDF
Am_0001.pdf PDF
H01_-_11-06-11_(Bridge_Deck_Pltg_&_Framing_Below).pdf PDF
H01_-_48-09-11_(Vents_Sounds_and_Overflows_FWD_FR_114).pdf PDF
H01_-_11-05-042_(Center_Well_Bulkheads_(Sheet_2)).PDF PDF
H01_-_Drawing_22-01-01_(Rudder).PDF PDF
H01_-_48-01-11_(Bilge_&_Ballast_System_Aft_Fr_61).pdf PDF
H01_-_48-23-02_(complete).pdf PDF
H01_-_48-05-122_(SW_Cooling_-_Fwd_Fr_61_P-D).pdf PDF
H01_-_45-01-21_L.O._FILL,_TRANSFER_&_PURIFYING_SYS.pdf PDF
H01_-_70006-4013-907.pdf PDF
H01_-_29-01-08_(2013_Stability_Book).pdf PDF
H01_-_48-09-112.pdf PDF
H01_-_48-01-121_(Bilge_&_Ballast_Piping_-_Fwd_Fr_114_L-M).pdf PDF
H01_-_HPU_block_manifold_exploded_view.pdf PDF
H01_-_48-08-15_(Diagram_Vacuum_Sewage_System).pdf PDF
H01_-_48-05-221_(Dredge_Valve_SW_Flushing_Aft_Fr_114_LM).pdf PDF
H01_-_48-09-121_(Vents-Sound_Fwd_Fr_144-61_LM).pdf PDF
H01_-_11-03-052.PDF PDF
H01_-_11-05-02_(Transverse_Blkds_Frs_84,_114,_132-136).pdf PDF
H01_-_11-01-03_(Shell_Expansion_Fwd._Fr._114).pdf PDF
H01_-_70006-2730-008_-_Supports_For_Suction_and_Delivery_Pipes_in_PR.pdf PDF
H01_-_11-01-08_SH_1-4_(Hull_Insert_for_Trunnion).pdf PDF
H01_-_29-01-03_(Sounding-Ullage_Tables).pdf PDF
H01_-_48-09-111_(Vent-Sound-Fwd_114-LM).pdf PDF
H01_-_11-04-03_(CVK_&_Girders_Fr_16-61).PDF PDF
H01_-_38-10-18_(7_sheets).pdf PDF
H01_-_11-06-01_(Hopper_Coaming).pdf PDF
H01_-_2009-08-20_Wheeler_Ullages_Table_Report.pdf PDF
H01_-_48-05-121_(Sea_Wtr_Cooling_-_Fwd_Fr_61_L-M).pdf PDF
H01_-_48-01-111_(Bilge_&_Ballast_Piping_-_Aft_Fr_61_L-M).pdf PDF
H01_-_19-06-01_(Zinc_Anode_Arrgt_&_Dets).pdf PDF
H01_-_48-09-122_(Vents,_Sounds_&_Overflows_Fr_114-61_P-D).pdf PDF
H01_-_70006-4013-910.pdf PDF
H01_-_HYDRECO_Hydraulic_Gear_Pump_Manual.pdf PDF
H01_-_48-17-252_(Jetting_&_Wash_Down_System_P-D).pdf PDF
H01_-_11-03-02_AFTPEAK_FRAMING.pdf PDF
Show 40 more

Latest 50 of 202 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: July 26, 2017

To: U.S. Army Corps of Engineers

Attn: Mr. Bob Brockway

Email: william.r.brockway@usace.army.mil

Cust. Ref: Autopilot Sea Trial

NGSM Ref: Q2017-3-81 UID: 163888

Subject: Dredge Wheeler

Dear Mr. Brockway, Northrop Grumman Systems Corporation, Sperry Marine is pleased to offer this proposal for the above referenced vessel.

This is a budgetary price proposal a proposed One Day Sea Trial.

This quotation is valid for 60 days, unless otherwise withdrawn in writing.

Location of Services: Local - Within 25 miles of Sperry Marine Office. If outside of this area, the customer will be responsible additional travel costs associated with the effort.

Payment terms: NET 30

Acceptance of this proposal is limited to the Northrop Grumman Systems Corporation, Sperry

Marine standard commercial terms and conditions. Sperry Marine reserves the right to reject any other terms imposed by the purchaser which are not in accordance with FAR Part 12 and FAR

Parts 52.212-4 and 52.212-5. Sperry Marine takes exception to the 52.222-41 Service Contract

Act. In addition, Sperry Marine reserves the right to increase the cost of the original quotation in consideration of the acceptance of different or additional terms and conditions imposed by the purchaser. Delays associated with Terms and Conditions discussion may adversely affect delivery schedule.

The information contained herein is submitted upon the understanding that it is privileged or confidential within the meaning of the Freedom of Information Act, 5 USC, Sec. 552(b)(4).

Northrop Grumman Systems Corporation

Sperry Marine

1865 Industrial Blvd

Harvey, LA 70058-2313 USA

Office Phone: 504 328 9171 Office Fax: 504 328 9855

Northrop Grumman Systems Corporation, Sperry Marine

Dredge Wheeler Autopilot Sea Trial Effort

Please note the following:

Purchase orders must be addressed to:

Northrop Grumman Systems Corporation

Sperry Marine

1865 Industrial Blvd

Harvey, LA 70058-2313

Cage Code 6MKG6

Duns Number 022200740

Scope of Work:

A Provisioning of Service

A.01 Conduct a One Day Sea Trial to verify functionality of the Autopilot system.

All labor, material and travel identified in this quotation are solely suggested by Northrop

Grumman Systems Corporation, Sperry Marine based on the scope of supply and scope of work provided.

If during the course of the work, it is discovered that additional work is needed and/or if there are any delays caused by anyone other than Sperry Marine representative, and the labor time is affected, we will inform the U.S. Corp of Engineers for a purchase order modification as necessary.

Pricing Summary:

A Scope of Work

A.01 Daily Rate Charge Offshore Rate @ $2,400.00/day 1 day sea trial $2,400.00

Total Budgetary Labor Price $2,400.00

Sperry Marine looks forward to supporting your needs. Any questions regarding the technical aspect of this quote may be directed to Mr. Joseph Monfrey at any time.

Joseph A. Monfrey Steven A. Garner

Mission Assurance Manager US Contracts Administrator

Northrop Grumman Systems Corp (Sperry Marine) Northrop Grumman Systems Corp (Sperry Marine)

Harvey, LA Harvey, LA

File details come from the government source that posted it. Updated .