Am_0002_Section_B.xls

XLS spreadsheet 85 KB Posted

Attached to
Drydock and Repair Dredge Wheeler
Solicitation number
W912P8-17-B-0032
Issued by

About this file

Am_0002 - Excel Section B

View the file

Other files

File Type Posted
A22_-_W912P817B0032,_Am_0004.pdf PDF
Am_0003.pdf PDF
Am_0002_-_Sperry.pdf PDF
Am_0002_-_70006-2560-055_(Overflow).pdf PDF
Am_0002_-_70006-2724-003.pdf PDF
Am_0002_-_70006-2726-003.pdf PDF
AM_0002.pdf PDF
Am_0002_-_Attachment_J-35_(Dredge_Pipes_in_Pump_Room_&_No_2_Voids).pdf PDF
Am_0002_-_70006-5473-901.pdf PDF
Am_0002_-_Attachment_J-34_(Hardox_400_Properties_and_Welding).pdf PDF
Am_0002_-_70006-2730-006.pdf PDF
Am_0002_-_SECTION__J_TOC.PDF PDF
Am_0002_-_70006-2724-002.pdf PDF
AM_0001.pdf PDF
Am_0001.pdf PDF
H01_-_11-06-11_(Bridge_Deck_Pltg_&_Framing_Below).pdf PDF
H01_-_48-09-11_(Vents_Sounds_and_Overflows_FWD_FR_114).pdf PDF
H01_-_11-05-042_(Center_Well_Bulkheads_(Sheet_2)).PDF PDF
H01_-_Drawing_22-01-01_(Rudder).PDF PDF
H01_-_48-01-11_(Bilge_&_Ballast_System_Aft_Fr_61).pdf PDF
H01_-_48-23-02_(complete).pdf PDF
H01_-_48-05-122_(SW_Cooling_-_Fwd_Fr_61_P-D).pdf PDF
H01_-_45-01-21_L.O._FILL,_TRANSFER_&_PURIFYING_SYS.pdf PDF
H01_-_70006-4013-907.pdf PDF
H01_-_29-01-08_(2013_Stability_Book).pdf PDF
H01_-_48-09-112.pdf PDF
H01_-_48-01-121_(Bilge_&_Ballast_Piping_-_Fwd_Fr_114_L-M).pdf PDF
H01_-_HPU_block_manifold_exploded_view.pdf PDF
H01_-_48-08-15_(Diagram_Vacuum_Sewage_System).pdf PDF
H01_-_48-05-221_(Dredge_Valve_SW_Flushing_Aft_Fr_114_LM).pdf PDF
H01_-_48-09-121_(Vents-Sound_Fwd_Fr_144-61_LM).pdf PDF
H01_-_11-03-052.PDF PDF
H01_-_11-05-02_(Transverse_Blkds_Frs_84,_114,_132-136).pdf PDF
H01_-_11-01-03_(Shell_Expansion_Fwd._Fr._114).pdf PDF
H01_-_70006-2730-008_-_Supports_For_Suction_and_Delivery_Pipes_in_PR.pdf PDF
H01_-_11-01-08_SH_1-4_(Hull_Insert_for_Trunnion).pdf PDF
H01_-_29-01-03_(Sounding-Ullage_Tables).pdf PDF
H01_-_48-09-111_(Vent-Sound-Fwd_114-LM).pdf PDF
H01_-_11-04-03_(CVK_&_Girders_Fr_16-61).PDF PDF
H01_-_38-10-18_(7_sheets).pdf PDF
H01_-_11-06-01_(Hopper_Coaming).pdf PDF
H01_-_2009-08-20_Wheeler_Ullages_Table_Report.pdf PDF
H01_-_48-05-121_(Sea_Wtr_Cooling_-_Fwd_Fr_61_L-M).pdf PDF
H01_-_48-01-111_(Bilge_&_Ballast_Piping_-_Aft_Fr_61_L-M).pdf PDF
H01_-_19-06-01_(Zinc_Anode_Arrgt_&_Dets).pdf PDF
H01_-_48-09-122_(Vents,_Sounds_&_Overflows_Fr_114-61_P-D).pdf PDF
H01_-_70006-4013-910.pdf PDF
H01_-_HYDRECO_Hydraulic_Gear_Pump_Manual.pdf PDF
H01_-_48-17-252_(Jetting_&_Wash_Down_System_P-D).pdf PDF
H01_-_11-03-02_AFTPEAK_FRAMING.pdf PDF
Show 40 more

Latest 50 of 202 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SECTION B
SUPPLIES OR SERVICES AND PRICE/COSTS
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
NOTE 1: The bidder is required to bid on all line items. Failure to submit a bid on all such line
items shall result in a non-responsive bid, requiring rejection thereof. In event that
a bidder is willing to waive costs associated with an individual line item, he is required
to insert descriptive words or abbreviations such as "no charge" or "N.C."
NOTE 2: Prospective bidders are encouraged to examine the vessel prior to bid opening.
The date for examining the vessel is scheduled by appointment. All arrangements shall be made
with Mr. Victor M. Garcia, (504) 862-2366 prior to the scheduled date. Failure to examine the vessel
before submitting a bid will not be considered cause for claim against the Government.
NOTE 3: All requirements in the schedule under the ITEM and Description/Specs./Work Statement."
The citation "0001 DD-1" gives the necessary information for proper bid preparation for
Contract Line Item 0001.
EXAMPLE
ITEM Spec. DESCRIPTION
0001 DD-1 Berthage, Drydocking and Services
NOTE 4: Payments for items identified as (Optional) will be paid in accordance
with the provisions located in SECTION H, at paragraph H-2, "Optional Item."
Payment shall be calculated by multiplying the bid Optional (U/P) by
the actual Quantity (Qty.) used - (U/P x QTY).
NOTE 5: The use of any particular product or commodity name is only given as a point of
reference and any product or commodity that will satisfy solicitation or contract
performance requirements may be offered. It is further requested that offeror submit
manufacturer's specifications or information sheets delineating those like characteristics.
NOTE 6: See solicitation Clause 52.228-16 "Performance and Payment Bonds -
Other than Construction" in Section I.
NOTE 7: Contractors must be registered in SAM.gov to receive a contract award.
NOTE 8: Bidders are required to contact the USACE Contract Specialist to request the applicable DOL Wage Determination for their parish/county.
Requests shall be sent via email to Lauren Gandolfi at lauren.a.gandolfi@usace.army.mil. The current applicable DOL Wage Determination
will be incorporated into any resulting contract. Failure to request the applicable DOL Wage Determination from USACE before submission
of a bid will render the bid non-responsive and the bid will be rejected.***
ItemSpec.DescriptionQty.U/IUnit PriceAmount
0001DD-1Berthage, Drydocking, and Services1jb
0002DD-2Sea Chests and Gratings1jb
0003DD-3Sea Chests Strainers1jb
0004DD-4Sea Valves1jb
0005DD-5Anchors and Anchor Chains1jb
DD-6NOT USED
0006DD-7Hopper Doors1jb
0007DD-7.1Hopper Door Top Insert Plates Renew10ea
0008DD-7.2(Optional) Hopper Door Side Plates Renew10ea
0009DD-7.3(Optional) Hopper Door Fwd & Aft Plates Renew6ea
0010DD-7.4Hopper Door (3/4") Hinge Plate Bushings30ea
0011DD-7.5Hopper Door (1-3/4") Hinge Plate Bushings30ea
0012DD-7.6Hopper Door (3/4") Hinge Plate Replacement20ea
0013DD-7.7(Optional) Bearing Pot Replacement10ea
0014DD-7.8Bearing Pot Bushings40ea
0015DD-7.9Hopper Door Pad Eye Bushing14ea
0016DD-7.10Top Bushings on Lower Push-Pull Rods w/Eye14ea
0017DD-7.11Top Bushings on Lower Push-Pull Rods w/Fork28ea
0018DD-7.12(Optional) Bottom Pipe Bushings on Push-Pull Rods28ea
0019DD-7.13Replacement of Hopper Door Seals1jb
0020DD-7.14(Optional) Hopper Door Upper Rod Lower Guide Support Repl.20ea
0021DD-7.15Hopper Door Upper Rod Lower Guide Block Repair28ea
0022DD-7.16(Optional) Hopper Door Upper Rod Upper Guide Block Repair20ea
0023DD-7.17(Optional) Hopper Door Upper Rod New Sleeve Installation at Lower Guide7ea
0024DD-7.18Hopper Door Upper Rod Replacement (Main Stem)1jb
0025DD-8Zinc Anodes1jb
0026HH-1Hopper Bay Inspection1jb
0027HH-2.1.1Hopper Bay Plating, Athwartship, Plate A7ea
0028HH-2.1.2(Optional) Hopper Bay Plating, Athwartship, Plate B7ea
0029HH-2.1.3(Optional) Hopper Bay Plating, Athwartship, Plate C7ea
0030HH-2.1.4Hopper Bay Plating, Athwartship, Plate D7ea
0031HH-2.2.1Hopper Bay Plating, Longitudinal, Plate A6ea
0032HH-2.2.2(Optional) Hopper Bay Plating, Longitudinal, Plate B7ea
0033HH-2.3Longitudinal Reinforced Plate in Voids6ea
0034HH-3Hopper Bay Sloped Plate Weld Seam Repair20ea
0035HH-4Wing Voids Interior Weld Seam Repair20ea
0036HH-5(Optional) Centerwell Bulkhead Weld Seam Repair20ea
0037HH-6(Optional) Hopper Weld Seam Repair (Various Locations)20ea
0038HH-7.1(Optional) Large Vertical T-Beam Section2ea
0039HH-7.2(Optional) Medium Vertical T-Beam Section2ea
0040HH-7.3(Optional) Small Vert. T-Beam Section (Above Stringer)6ea
0041HH-7.4(Optional) Small Vert. T-Beam Section (Below Stringer)6ea
0042HH-7.5(Optional) Stringer Plate Section6ea
0043HH-8(Optional) Ultrasonic Thickness Measurements10,000ea
0044HH-9Cover For Stacks1jb
0045HH-10Cleaning & Modifications of L.O. Settling Tank in AMR1jb
0046HH-11(Optional) Services of Machinist (outside)2500hr
0047HH-12(Optional) Machining1000hr
0048HH-13.1(Optional) Mild Steel Welding1000hr
0049HH-13.2(Optional) Low Hydrogen Welding3500hr
0050HH-13.3(Optional) Stainless Steel Welding200hr
0051HH-13.4(Optional) Inspection of Welds500hr
0052HH-14Ballast Tanks, Voids, and CofferDams1jb
0053HH-15Dirty Lube Oil, Oily Bilge & Sludge Tanks1jb
0054HH-16Fuel Oil Tanks1jb
0055HH-17Fuel Oil Vent Containments (Clean, Steel Repair)1jb
0056HH-18Protection, Cleaning, and Surface Preparation1jb
0057HH-19Painting1jb
0058HH-20Steel replacement & Painting #8 Port & Stbd Ballast Tanks and AMR1jb
0059HH-21Steel Repair And Painting #6 Port, Stbd & Center Ballast Tanks1jb
0060MP-1.1Propeller Hydraulic System Inspection1jb
0061MP-1.2Hydraulic Power Unit and Hub Oil System Maintenance (Port & Stbd)1jb
0062MP-1.3Port & Starboard Servo Box Inspection1jb
0063MP-1.4Port Tailshaft Replacement1jb
0064MP-1.5Port Propeller Hub & Blade Replacement1jb
0065MP-1.6Starboard Propeller Blade Replacement And Hub Inspection1jb
0066MP-2.1Port & Stbd Strut and Stern Tube Bearing Inspection1jb
0067MP-2.2Starboard Stern Tube Gland Seal Maintenance1jb
0068MP-3.1Bow Thruster System Inspection & Maintenance1jb
0069MP-4.1Rudder Stock & Pintle Pin Clearances (Port & Starboard)1jb
0070MD-1.1Sluice Valve Inspection1jb
0071MD-1.2.1(Optional) Sluice Valves, 18-Inch Diameter5ea
0072MD-1.2.2(Optional) Sluice Valves, 24-Inch Diameter2ea
0073MD-1.2.3(Optional) Sluice Valves, 26-Inch Diameter2ea
0074MD-1.2.4(Optional) Sluice Valves, 30-inch Diameter3ea
0075MD-1.2.5(Optional) Sluice Valves, 32-inch Diameter2ea
0076MD-1.2.6(Optional) Sluice Valves, 43-inch Diameter1ea
0077MD-1.3(Optional) Collection Valve Gate Repair3jb
0078MD-1.4Collection Valve Flushing Lines and Body Cleaning1jb
0079MD-1.543 Inch Sluice Valve Body Replacement – Pump Room1jb
0080MD-2.1Clean Jetting Pipe & Reinstall Jetting Pumps & Motors & Replace Pipes1jb
0081MD-3(Optional) Weld Seam Repair on Collection Pipes in Voids (Port)1jb
0082MD-4(Optional) Port Overside Dragarm Trunnion (Hull Connection) Outboard Flange1jb
0083MD-5(Optional) Starboard Overside Trunnion Hull Flange1jb
0084MD-6Adjustable Weir & Cylinder Replacement1jb
0085MA-1Valve Replacement for Port & Stbd Plate Coolers1jb
0086MA-2Drain, Dispose, Refill, and Treat Fresh Water System (Port & Stbd)1jb
0087MA-3Clean Two Fresh Water Expansion Tanks1jb
0088MA-4Seawater Cooling Pump Rebuild (Pump Room) & Valve/Actuator Assemblies Replacement1jb
0089MA-5Tate Temco Valve Manifolds1jb
0090MA-6Potable Water System1jb
0091MA-7Ballast Tanks Suction And Discharge Pipes’ Replacement1jb
0092MA-8(Optional) Bilge & Ballast Pipes In Pump Room Replacement1jb
0093MA-9Marine Sanitation Device Maintenance & Holding Tank Cleaning1jb
0094MA-10Replacement Of Emergency Generator1jb
0095MA-11Crane Engine & Components Overhaul & Cleaning1jb
0096MA-12(Optional) Air Handler in Poop Deck1jb
0097MA-13(Optional) Replacement of Deck Plate in Fan Room (Bridge Deck - Stbd Side)1jb
0098MA-14(Optional) Pressure Wash, Blast & Paint Pump Room1jb
0099MA-15Insulation Replacement Throughout AMR Rooms1jb
0100MA-16(Optional) Convert #7 Center Ballast Tank to Slops Tank1jb
0101MA-17Hydraulics Maintenance1jb
0102MA-18Cleaning of Main & Dredge Engine Stacks1jb
0103MA-19Heat Exchanger Replacement For Ac-Chilled Water#21jb
0104MA-20(Optional) Replacement of Port & Stbd Services Frames1jb
0105EE-1Dredge Wheeler Ship Service And Emergency Switchboard Maintenance1jb
0106EE-2Dredge Wheeler Sea Water Pump Motor Variable Frequency Drives1jb
0107EE-3Dredge Wheeler Steering Gear & Gyro Installation1jb
0108EE-4Protection of Hydraulic Control Panels1jb
0109EE-5(Optional) Fan Repairs1jb
0110Dock Trials1jb
0111Growth Rate* (This bid schedule includes an estimated quantity for evaluation purposes only. Actual hours may be lower or higher.)10,000hr
0112Percent Mark Up (This mark up applies to materials, parts and subcontract service in growth work only. This percentage will be evaluated for reasonableness.)___%
0113PR-1Dredge Pipes Weld Repair & Replacement (Pump Room & No. 2 Port & Stbd Voids)1jb____________
The labor hourly rate in CLIN 0111 "Growth Rate" shall be used in pricing all
contract changes in accordance with the clause of
Section H-2A entitled "COMPOSITE LABOR HOUR RATE FOR
CONTRACT CHANGES."
Total:
END OF SECTION B
Base
Optional

&C&"Courier New,Regular"&12B-&P

Sheet2

File details come from the government source that posted it. Updated .