Amendment 0003 Batch 2 Reply to submitted questions 18 September 2015

View the file

Other files for this federal contract opportunity

Other files attached to Amend 0003, newest first.
File Type Posted
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part8.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part9.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part5.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part10.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part2.pdf PDF
SF30_Amend_0002Corrected.pdf PDF
QASP_Performance_Work_Statement__replacement.pdf PDF
Drawings_LAFCO_441-25_Welding_Sch_ _Details.pdf PDF
Drawings_LAFCO_441-16B_A_C_Electrical_System.pdf PDF
Drawings_LAFCO_441-12B_Fixed_CO2_Sys.pdf PDF
Drawings_LAFCO_441-3_Scantlings_and_Inboard_Profile.pdf PDF
Drawings_Launch_Edge_Water__914-433-009_Rigging_ _Tackle_Assy.pdf PDF
Drawings_LAFCO_441-23_Bumper_Details.pdf PDF
Drawings_LAFCO_441-19_Fuel_Tank.pdf PDF
Drawings_Launch_Edge_Water__914-433-005_Gen_Notes_and_BOM.pdf PDF
Drawings_11-04-01_opt.pdf PDF
Drawings_Launch_Edge_Water_914-433-000_General_Arrangement.pdf PDF
Drawings_Launch_Edge_Water__914-433-011_Davit_Arm_Installation _Winch_and_Misc_Details.pdf PDF
Drawings_Launch_Edge_Water__914-433-003_Support_Frame_Weldment.pdf PDF
Drawings_Launch_Edge_Water__914-433-004_Pin_ _Lock_Plate.pdf PDF
Avondale_Drawings_combined_Part12.pdf PDF
Avondale_Drawings_combined_Part2.pdf PDF
Avondale_Drawings_combined_Part54.pdf PDF
Avondale_Drawings_combined_Part43.pdf PDF
Avondale_Drawings_combined_Part37.pdf PDF
Avondale_Drawings_combined_Part63.pdf PDF
Avondale_Drawings_combined_Part59.pdf PDF
Avondale_Drawings_combined_Part69.pdf PDF
Avondale_Drawings_combined_Part35.pdf PDF
Avondale_Drawings_combined_Part9.pdf PDF
Avondale_Drawings_combined_Part38.pdf PDF
Avondale_Drawings_combined_Part62.pdf PDF
Avondale_Drawings_combined_Part53.pdf PDF
Avondale_Drawings_combined_Part64.pdf PDF
Avondale_Drawings_combined_Part52.pdf PDF
Avondale_Drawings_combined_Part70.pdf PDF
Avondale_Drawings_combined_Part49.pdf PDF
Avondale_Drawings_combined_Part4.pdf PDF
Avondale_Drawings_combined_Part58.pdf PDF
Avondale_Drawings_combined_Part17.pdf PDF
Misc_Drawings_Part9.pdf PDF
Misc_Drawings_Part2.pdf PDF
Misc_Drawings_Part1.pdf PDF
Misc_Drawings_Part7.pdf PDF
Misc_Drawings_Part6.pdf PDF
Dredge_Technology_Drawings_Part3.pdf PDF
Dredge_Technology_Drawings_Part5.pdf PDF
Dredge_Technology_Drawings_Part8.pdf PDF
Section_J_Attachment_List_.pdf PDF
W912P8-15-B-0046.pdf PDF
Show all 50

Amend 0003 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions submitted on Friday, September 4, 2015.

(Question) 1. On work item 0100-MD-10 Stbd draghead & Gimbal Davit Shafts…. The item states to remove the shafts (pins) on the two davits and provide a condition report. It states “If there is any repair required, it shall be issued on a change order.” Then it states to “Proceed to bore out the davit frame and/or machine the shafts.” We do not know how bad the bores or shafts are right now, so how are we to quote the repairs to the pins and shafts ?

Answer: Currently, the bores and shafts on the starboard gimbal and draghead davits still work; however, there is a grinding noise coming when the davits being lowered or raised. The cause for this noise could be the shafts binding on the bore.

The contractor shall remove the shaft(s) from its plate/bore in order to have a thorough inspection of grease groove, surface smoothness, etc. Any major repair shall be issued by change order. However, for estimate purpose, the contractor shall include the scope of work that states that after the shaft(s) is removed from davits, the contractor shall either bore out cheek plates of the davits/frames or machine down the shaft at least 1/8 inch per side in order to have clearance to free up the binding.

(Question) 2. Please provide drawing # 11-12-04 for the new foundation called out for in item #MA-1.

Answer: Attached with amendment 003.

(Question) 3. Item 0103 MA-1 STBD plate cooler maint. and repair. The specs do not include a drawing to show how many plates are involved. Please provide the drawing for the cooler and its foundation.

Answer: The plate cooler is manufactured by “Alfa Laval,” model AX30-HBM. There are 187 plates per cooler (Note: each plate coolers may have one or two more plates than 187). Attached is the partial operation manual with sketches.