QASP_Performance_Work_Statement__replacement.pdf

PDF 29 KB Posted

Attached to
Amend 0003 Federal contract opportunity
Solicitation number
W912P815B0046
Issued by
Department of the Army Corps of Engineers Engineering District New Orleans

About this file

QASP for Performance Work Statement Replacement

View the file

Other files for this federal contract opportunity

Other files attached to Amend 0003, newest first.
File Type Posted
W912P815B0046.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part6.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part7.pdf PDF
SF30_Amend_0003.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part1.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part5.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part10.pdf PDF
Drawing_for_MA-1_(_11-12-04)_New_Foundation_Part2.pdf PDF
Corrected_Revised_Bid_Schedule_to_include_Launch_01Sept2015.pdf PDF
Drawings_Launch_Edge_Water__914-433-002_Davit_Arm_Weldment_Details.pdf PDF
Drawings_LAFCO_441-4_Mid_Ship_Sections.pdf PDF
Drawings_LAFCO_441-10_Steering_Sys.PDF PDF
Drawings_70006-4013-902_(Rev_F).PDF PDF
Drawings_Launch_Edge_Water__914-433-010_Launch_Hook.pdf PDF
Drawings_Launch_Edge_Water__914-433-006_Sheave_16_O.D.pdf PDF
Drawings_LAFCO_441-2_General_Arrangement.pdf PDF
Drawings_11-04-01_opt.pdf PDF
Drawings_Launch_Edge_Water_914-433-000_General_Arrangement.pdf PDF
Drawings_Launch_Edge_Water__914-433-011_Davit_Arm_Installation _Winch_and_Misc_Details.pdf PDF
Drawings_Launch_Edge_Water__914-433-003_Support_Frame_Weldment.pdf PDF
Drawings_Launch_Edge_Water__914-433-004_Pin_ _Lock_Plate.pdf PDF
Avondale_Drawings_combined_Part60.pdf PDF
Avondale_Drawings_combined_Part25.pdf PDF
Avondale_Drawings_combined_Part34.pdf PDF
Avondale_Drawings_combined_Part39.pdf PDF
Avondale_Drawings_combined_Part15.pdf PDF
Avondale_Drawings_combined_Part7.pdf PDF
Avondale_Drawings_combined_Part30.pdf PDF
Avondale_Drawings_combined_Part20.pdf PDF
Avondale_Drawings_combined_Part57.pdf PDF
Avondale_Drawings_combined_Part19.pdf PDF
Avondale_Drawings_combined_Part51.pdf PDF
Avondale_Drawings_combined_Part3.pdf PDF
Avondale_Drawings_combined_Part21.pdf PDF
Avondale_Drawings_combined_Part66.pdf PDF
Avondale_Drawings_combined_Part31.pdf PDF
Avondale_Drawings_combined_Part36.pdf PDF
Avondale_Drawings_combined_Part22.pdf PDF
Avondale_Drawings_combined_Part70.pdf PDF
Avondale_Drawings_combined_Part49.pdf PDF
Avondale_Drawings_combined_Part4.pdf PDF
Avondale_Drawings_combined_Part58.pdf PDF
Avondale_Drawings_combined_Part17.pdf PDF
Avondale_Drawings_combined_Part5.pdf PDF
Misc_Drawings_Part4.pdf PDF
Dredge_Technology_Drawings_Part7.pdf PDF
Dredge_Technology_Drawings_Part8.pdf PDF
Section_J_Attachment_List_.pdf PDF
Section_J_Attachment_List_.pdf PDF
W912P8-15-B-0046.pdf PDF
Show all 50

Amend 0003 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PART 9 – QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. This section identifies the method of surveillance the government’s Quality Assurance Personnel (QAP) will use to verify the quality of the contractor’s performance. Surveillance methos is periodic inspection (in addition to the scheduled inspection as called out in the work statement above).

2. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate.

3. Method of surveillance will be 100% inspection by the QAP.

Surveillance will be performed as specified in the Service Delivery Summary (SDS) in paragraph 5 below.

4. Where appropriate, methods for administering and evaluating services not included in the Service Delivery Summary are to be developed by the QAP.

a. The government retains the right to inspect required tasks not shown on the Service Delivery Summary. Inspection of these services will be in the same general manner as SDS items. The results of these inspections shall be documented. Any results that require minor corrective actions, the government inspector shall discuss the deficiencies with the appropriate shipyard personnel. Any major deficiency shall be provided to the contracting officer for action.

b. The following non-SDS items may be observed periodically during the contract period.

* Employees identification badges if working on any repair work for the Dredge Wheeler whether on board or on the drydock.

* Work manner of employees.

* Safety compliance (Safety Plan & EM-385-1).

5. Service Delivery Summary

Performance Objectives

PWS

Reference

Surveillance

Method

Performance Threshold

All general contract requirements are complied without deficiencies or safety violations.

Part 1 (General

Information And

Requirement)

100% visual inspection of work site

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies allowed by FAR Clause 52.212-4 also apply.

All required service for drydocking and other berthages services are provided in a timely manner without deficiencies.

Part 2 (Drydocking) inspection and operation of affected equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

All required inspections and measurements (where applicable) shall be performed and submitted in a timely manner.

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

All repair work shall be performed using the most efficient labor in a timely manner without any work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies free of defects and the equipment repaired shall work properly.

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies applicable) shall be

Part 3 (Hull And House)

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies efficient labor in a

Part 3 work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.

Part 3 and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies applicable) shall be

Part 4 (Machinery:

Propulsion Systems)

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies efficient labor in a

Part 4 work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.

Part 4 (Machinery:

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies applicable) shall be

Part 5

Dredging

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies efficient labor in a

Part 5 work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.

Part 5 (Machinery:

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies applicable) shall be

Part 6

Auxiliary

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies efficient labor in a

Part 6 work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.

Part 6 (Machinery:

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies applicable) shall be

Part 7 Electrical

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies efficient labor in a work site and testing of equipment as required

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

All required service for dock trials are complied without deficiencies or safety violations.

Part 8 (Dock Trial) work site

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

All required operation test of equipment shall be performed using the most efficient labor in a timely manner without any safety violations.

and test run of all applicable equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

All applicable deficiencies shall be corrected properly in a timely manner.

and test run of all repaired equipment

Zero (0) defects allowed.

100% Re-performance of all defective work is required. Other remedies

File details come from the government source that posted it. Updated .