QASP for Performance Work Statement Replacement
View the file
Other files for this federal contract opportunity
Show all 50
Amend 0003 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
PART 9 – QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. This section identifies the method of surveillance the government’s Quality Assurance Personnel (QAP) will use to verify the quality of the contractor’s performance. Surveillance methos is periodic inspection (in addition to the scheduled inspection as called out in the work statement above).
2. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate.
3. Method of surveillance will be 100% inspection by the QAP.
Surveillance will be performed as specified in the Service Delivery Summary (SDS) in paragraph 5 below.
4. Where appropriate, methods for administering and evaluating services not included in the Service Delivery Summary are to be developed by the QAP.
a. The government retains the right to inspect required tasks not shown on the Service Delivery Summary. Inspection of these services will be in the same general manner as SDS items. The results of these inspections shall be documented. Any results that require minor corrective actions, the government inspector shall discuss the deficiencies with the appropriate shipyard personnel. Any major deficiency shall be provided to the contracting officer for action.
b. The following non-SDS items may be observed periodically during the contract period.
* Employees identification badges if working on any repair work for the Dredge Wheeler whether on board or on the drydock.
* Work manner of employees.
* Safety compliance (Safety Plan & EM-385-1).
5. Service Delivery Summary
Performance Objectives
PWS
Reference
Surveillance
Method
Performance Threshold
All general contract requirements are complied without deficiencies or safety violations.
Part 1 (General
Information And
Requirement)
100% visual inspection of work site
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies allowed by FAR Clause 52.212-4 also apply.
All required service for drydocking and other berthages services are provided in a timely manner without deficiencies.
Part 2 (Drydocking) inspection and operation of affected equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies
All required inspections and measurements (where applicable) shall be performed and submitted in a timely manner.
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies
All repair work shall be performed using the most efficient labor in a timely manner without any work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies free of defects and the equipment repaired shall work properly.
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies applicable) shall be
Part 3 (Hull And House)
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies efficient labor in a
Part 3 work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.
Part 3 and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies applicable) shall be
Part 4 (Machinery:
Propulsion Systems)
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies efficient labor in a
Part 4 work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.
Part 4 (Machinery:
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies applicable) shall be
Part 5
Dredging
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies efficient labor in a
Part 5 work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.
Part 5 (Machinery:
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies applicable) shall be
Part 6
Auxiliary
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies efficient labor in a
Part 6 work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.
Part 6 (Machinery:
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies applicable) shall be
Part 7 Electrical
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies efficient labor in a work site and testing of equipment as required
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies equipment repaired shall work properly.
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies
All required service for dock trials are complied without deficiencies or safety violations.
Part 8 (Dock Trial) work site
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies
All required operation test of equipment shall be performed using the most efficient labor in a timely manner without any safety violations.
and test run of all applicable equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies
All applicable deficiencies shall be corrected properly in a timely manner.
and test run of all repaired equipment
Zero (0) defects allowed.
100% Re-performance of all defective work is required. Other remedies