This is a request for proposal for a small arms range project. The USPFO for Minnesota is seeking a firm fixed-price contract for services to provide all labor, materials, equipment, and supervision necessary to construct a manufactured containerized small arms range and conventionally constructed CATM facility attached to the range. The project scope includes site work, utilities, and all structural, architectural, mechanical, and electrical systems to support the facilities. The magnitude of the project is between $5 million and $10 million, with a 360-day completion time after notice to proceed. The NAICS code is 236220 and it is set aside for small businesses with a size standard of $39.5 million. The pre-proposal conference is on June 3, 2021 and the solicitation closing date is June 22, 2021. The source selection will be conducted in accordance with FAR Part 15.3 using best value past performance and price factors. Interested offerors must register in SAM and check the website periodically for amendments, as the website is the sole method of distributing information. Place of performance is the Duluth National Guard Base in Minnesota.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct Small Arms Range FMKM179063 DOOR HARDWARE

LHB #180940 Addendum 02 08 7100-7

Group 1 Single Interior Passage Function

Door 104, 106 Toilet rooms

3 each Hinges

1 each Push Plate 200F

1 each Pull Plate 200F x 536B

1 each Closer

1 each Kick Plate

1 each Wall Stop

Group 2 Single Interior Classroom Function

Doors 102.1, 102.2 Classroom

1 each Classroom lock

1 each Mortise Cylinder

1 each Wall Stop

Group 3 Single Interior Office Function

Doors 101 Office

1 each Office lock

Group 4 Single Interior Storeroom Function

Doors 107 Weapons Maintenance

1 each Storeroom lock

1 each Mortise Cylinder

1 each HES Electric Strike 9600

1 each Closer

1 each Kick plate

1 each Wall Stop

Door Contacts (BMS) by Div. 28

Rough-in conduit and pathway for future access control/CR system

Group 5 Single Interior Storeroom Function

Doors 105 Range Supplies & Equipment Storage/Target Storage, 111 Tele, 103 Janitor

1 each Storeroom lock

1 each Kick plate (armor plate at 103 Janitor)

LHB #180940 Addendum 02 08 7100-8

1 each Overhead Stop (door 103 & 111 only)

Group 6 Single Exterior Storeroom Function

Door 109 Electrical

1 each Exit Device CD99NL x 990NL

1 each Mortise Cylinder

1 each Rim Cylinder

1 each Closer 4111-S-CUSH

1 each HES Electric Strike 9600

1 each Kick Plate

1 set Weatherstrip

1 each Threshold

1 each Sweep

Group 7 Pair Exterior Storeroom Function. Locked from exterior, always free to exit.

Door 120 Mechanical

6 each Hinges

1 each Power Transfer Securitron EL-CEPT (locate on inactive leaf for electric strike)

1 each Storeroom lock

1 each Mortise Cylinder

1 each Manual Flush bolt

1 each Dust Proof strike

1 each Overhead stop 90 (inactive leaf only)

1 each Closer 4111-SH-CUSH (active leaf only)

1 each HES Electric Strike 1006CLP

1 each Lock guard Don-Jo MELP-210

1 each Astragal

1 set Door Seal

2 each Armor plate

1 set Weatherstrip

1 each Threshold

1 set Sweeps

1 each Rain Drip

LHB #180940 Addendum 02 08 7100-9

Group 8 Single Aluminum Interior Entry function (interior vestibule)

Door 100.2

1 each Push Bar/Offset Pull 1081LBP x 658A

1 each Closer

Weatherstrip to be supplied by Aluminum door and frame supplier.

Group 9 Single Aluminum Exterior Entry function

Doors 100.1, 110

1 each Exit Device CD99NL-OP

1 each Mortise Cylinder

1 each Rim Cylinder

1 each Offset Pull 658A

1 each Closer 4111-S-CUSH

1 each HES Electric Strike 9600

1 set Sweeps

Weatherstripping to be supplied by Aluminum Door and Frame supplier

Door Contact (BMS) by Division 28

END OF SECTION

MnANG Construct Small Arms Range

LHB# 180940

FMKM179063

Type B.3 Final Submittal

ELECTRICAL POWER MONITORING

(ISSUED ADDENDUM NO. 02)

26 0914 - 1

SECTION 26 0914

ELECTRICAL POWER MONITORING (ISSUED ADDENDUM NO. 02)

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Instrument transformers.

B. Meters and meter switches and relays.

C. Software Protocol Gateways

1.02 RELATED REQUIREMENTS

A. Section 26 0800 - Testing for Electrical Systems.

B. Section 26 1321 - Air Interrupter Switches.

C. Section 26 2100 - Low-Voltage Electrical Service Entrance.

1.03 REFERENCE STANDARDS

A. IEEE C12.1 - American National Standard Code for Electricity Metering; Institute of Electrical and Electronic Engineers; 1988.

B. IEEE C57.13 - IEEE Standard Requirements for Instrument Transformers; Institute of

Electrical and Electronic Engineers; 2008.

C. NFPA 70 - National Electrical Code; National Fire Protection Association; Most Recent Edition

Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Submittals for Review:

1. Shop drawings:

a. Include drawings with enclosure type, outline dimensions, mounting dimensions, terminal connection information, and weights.

2. Product Data: Provide complete manufacturer's product data with options and accessories identified. Provide electrical ratings and adjustment ranges. Indicate complete model numbers with accessories, and software.

C. Submittals for Information:

1. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product.

D. Submittals for Closeout:

1. Operation and Maintenance Manual:

a. Operation Data: Operating instructions.

b. Product Information: Include approved shop drawings and product data.

c. Warranty: Include manufacturer warranty and ensure that forms have been completed in Government 's name and registered with manufacturer.

d. Documentation of Training: Indicate date of training. Include attendance roster and training outline.

1.05 QUALITY ASSURANCE

A. Conform to requirements of NFPA 70.

B. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience and with service facilities within 150 miles of Project.

C. Products: Furnish products listed and classified by Underwriters Laboratories Inc. as suitable for purpose specified and indicated.

FMKM179063

Type B.3 Final Submittal

ELECTRICAL POWER MONITORING

(ISSUED ADDENDUM NO. 02)

26 0914 - 2

1.06 WARRANTY

A. The meter manufacturer shall warrant the meter against defects in materials and workmanship for 5 years after initial start-up.

PART 2 PRODUCTS

2.01 MANUFACTURERS

2.02 MICROPROCESSOR METERING EQUIPMENT

A. Switch selectable digital display of the following values with maximum accuracy tolerances as indicated:

1. Phase Currents, Each Phase: Plus or minus 1 percent.

2. Phase-to-Phase Voltages, Three Phase: Plus or minus 1 percent.

3. Phase-to-Neutral Voltages, Three Phase: Plus or minus 1 percent.

4. Megawatts: Plus or minus 2 percent.

5. Megavars: Plus or minus 2 percent.

6. Power Factor: Plus or minus 2 percent.

7. Frequency: Plus or minus 0.5 percent.

8. Accumulated Energy, Megawatt Hours: Plus or minus 2 percent; accumulated values unaffected by power outages up to 72 hours.

9. Megawatt Demand: Plus or minus 2 percent; demand interval programmable from five to

60 minutes.

10. Contact devices to operate remote impulse-totalizing demand meter.

B. Mounting: Display and control unit flush or semiflush mounted in instrument compartment door.

C. Communications using ModBus protocol ASCII/RTU and DNP 3.0.

1. Remote command through communications port.

2. Communicate all outputs with Building Management System.

3. Provisions for fiber optic connection utilizing SC style connectors.

D. Protocol Gateway

1. Remote mounted Software Protocol Gateway, translating from ModBus to BACnet IP.

2. NEMA 1 enclosure

3. 120Volt to 24VAC/VDC power supply

4. Accept OM3 fiber optic connection for the ModBus connection, BACnet IP connection to be Ethernet.

E. Manufacturers:

1. Digital Power Quality Meter & Analyzer for electrical service entrance(s): Square D PowerLogic.

a. Square D Ion 7550 meter.

2.

3. Substitutions: Not Permitted.

F. Provide meters with appropriate multiplier tags.

2.03 CONTROL POWER

A. Control Circuits Options:

1. Unless specifically noted in other portions of the contract documents, the following control circuits can be utilized. This contractor shall coordinate with the Government for interfaces and make decisions prior to shop drawing submittal on what control circuit interface will be provided.

2. 120 VAC, supplied through secondary disconnecting devices from control-power transformer.

3. 120 VAC, supplied from remote branch circuit.

4. 24VAC/24VDC.

FMKM179063

Type B.3 Final Submittal

ELECTRICAL POWER MONITORING

(ISSUED ADDENDUM NO. 02)

26 0914 - 3

B. Control-Power Fuses: Primary and secondary fuses for current-limiting and overload protection of transformer and fuses for protection of control circuits.

C. Control Wiring: Factory installed, with bundling, lacing, and protection included. Provide flexible conductors for No. 8 AWG and smaller, for conductors across hinges, and for conductors for interconnections between shipping units.

2.04 METERING TRANSFORMERS

A. Current Transformers: IEEE C57.13; 5 ampere secondary, wound type, with single secondary winding and secondary shorting device, primary/secondary ratio as required, burden and accuracy consistent with connected metering and relay devices, 60 Hertz.

B. Potential Transformers: IEEE C57.13; 120 volt single secondary, disconnecting type with integral fuse mountings, primary/secondary ratio as required, burden and accuracy consistent with connected metering and relay devices, 60 Hertz.

PART 3 EXECUTION

3.01 PRE-INSTALLATION

A. Verify meter is compatable with energy management control system.

B. Provide recommended fuses for meter.

3.02 METER INSTALLATION AND PROGRAMMING

A. Install meter within electrical gear sections, providing required seperation barriers.

B. Coordinate communication cable entrance and termination within switchboard housing prior to rough-in. It is incumbent upon this contractor to provide proper pathways and accommodations with selected gear.

C. Coordiante a 2-hour meeting with BAS programmer, Government select staff, and COR prior to programming to confirm expectations of data extraction.

3.03 GATEWAY INSTALLATION AND PROGRAMMING

A. Install gateway in Building 211, coordinating with Owner prior to rough-in.

B. Coordinate communication cable entrance and termination prior to rough-in. It is incumbent upon this contractor to provide proper pathways and accommodations with Owner's existing equipment.

3.04 TRAINING

A. Provide 2 hours training to the Owner explaining the operation use and of Power and Quality

Analyzer.

FMKM179063

Type B.3 Final Submittal

MEDIUM-VOLTAGE TRANSFORMERS

(ISSUED ADDENDUM NO. 02)

26 1200 - 1

SECTION 26 1200

MEDIUM-VOLTAGE TRANSFORMERS (ISSUED ADDENDUM NO. 02)

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Liquid-filled pad-mounted distribution transformers.

1.02 REFERENCE STANDARDS

A. US Department of Energy (DOE) 10 CFR 431.196 for transformers manucfactured after January 1, 2016.

B. IEEE C57.12.00 - IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers; 2015.

C. IEEE C57.12.01 - IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers; 2015.

D. IEEE C57.12.28 - IEEE Standard for Pad-Mounted Equipment -- Enclosure Integrity; 2014.

E. IEEE C57.12.90 - IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and

Regulating Transformers; 2015 (Corrigendum 2017).

F. IEEE C57.94 - IEEE Recommended Practice for Installation, Application, Operation, and

Maintenance of Dry-Type Distribution and Power Transformers; 2015.

G. IEEE C57.111 - IEEE Standard Guide for Acceptance of Silicone Insulating Fluid and Its

Maintenance in Transformers; 1995 (Reaffirmed 2009).

H. NEMA 260 - Safety Labels for Padmounted Switchgear and Transformers Sited in Public

Areas; 1996 (Reaffirmed 2004).

I. NETA ATS - Acceptance Testing Specifications for Electrical Power Equipment and Systems;

2017.

J. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having

Jurisdiction, Including All Applicable Amendments and Supplements.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Prerequisite Submittals:

1. Submit Product Data and Shop Drawings in conjunction with Overcurrent Protective Device Coordination Study and Arc Flash Assessment to verify equipment ratings required. Submittals received without concurrent submittal of Section 26 0573 may be rejected without review.

C. Action Submittals:

1. Shop Drawings: Indicate electrical characteristics and connection requirements, outline dimensions, connection and support points, weight, specified ratings and materials.

2. Product Data: Provide electrical characteristics and connection requirements, standard model design tests, and options.

D. Information Submittals:

1. Test Reports: Indicate procedures and results for specified factory and field testing and inspection.

2. Manufacturer's Installation Instructions.

3. Manufacturer's Field Reports: Indicate activities on site, final adjustments and overcurrent protective device coordination curves, adverse findings, and recommendations.

E. Closeout Submittals:

1. Project Record Documents: Record actual installed locations of transformers.

2. Operation and Maintenance Manual:

FMKM179063

Type B.3 Final Submittal

MEDIUM-VOLTAGE TRANSFORMERS

(ISSUED ADDENDUM NO. 02)

26 1200 - 2

a. Include copy of manufacturer's certified drawings.

b. Maintenance Data: Include maintenance instructions for cleaning methods; cleaning materials recommended; procedures for sampling and maintaining fluid.

F. Maintenance Materials: Furnish the following for Government's use in maintenance of project.

1. See Section 01 6000 - Product Requirements, for additional provisions.

2. Extra Fuses: One of each type and size.

3. Tools: One each of every special tool required to operate and maintain transformer.

1.04 QUALITY ASSURANCE

A. Conform to requirements of NFPA 70.

B. Products: Listed, classified, and labeled as suitable for the purpose intended.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Cooper Power Systems, a division of Eaton Corporation: www.cooperindustries.com.

B. Schneider Electric; Square D Products: www.schneider-electric.us.

C. Substitutions: See Section 01 6000 - Product Requirements.

2.02 LIQUID-FILLED TRANSFORMERS

A. Liquid-Filled Transformers: IEEE C57.12.00, three phase, pad-mounted, self-cooled transformer unit.

B. Cooling and Temperature Rise; IEEE C57.12.00; Class OA. 55 degrees C, self-cooled.

C. Insulating Liquid: Biodegradable vegetable-based oil.

D. Efficiency: Comply with 10 CFR 431.196 for transformers manucfactured after January 1, 2016.

E. Features:

1. HV Dead Front construction.

2.03 RATINGS

A. Capacity: kVA ratings as scheduled on Drawings.

B. Primary Voltage: As scheduled on Drawings, delta connected.

C. Taps: Total of four taps with 2.5% increments; 2-2.5% FCAN and 2-2.5% FCBN.

D. Secondary Voltage: As scheduled on Drawings, wye connected.

E. Impedance: As scheduled on Drawings.

F. Basic Impulse Level: 95 kV.

2.04 ACCESSORIES

A. Accessories: IEEE C57.12.00 standard accessories and IEEE C57.12.01 standard accessories.

B. Loop feed.

C. Tap Changer: Externally-operated type.

D. Primary Switching: Internal liquid-immersed gang-operated two-position 200 amp LBOR load break transformer switch. Provide two, for loop feed.

E. Primary Overcurrent Protection: Bayonet-type, liquid-immersed, expulsion fuses.

F. Secondary Terminations: LV Bushings with 8 hole NEMA spade terminals.

1. ANSI minimum staggered low voltage pattern.

G. Other Accessories:

1. Primary lightning arrestors: 15 KV dead front arrestor-boxed and shipped-detail in cabinet.

FMKM179063

Type B.3 Final Submittal

MEDIUM-VOLTAGE TRANSFORMERS

(ISSUED ADDENDUM NO. 02)

26 1200 - 3

2. Pressure vacuum gauge.

3. Drain valve and sampler.

4. Steel high/low barrier.

5. Steel wall barrier.

6. Steel top barrier.

7. Lifting lugs.

2.05 FABRICATION

A. Conform to the requirements of IEEE C57.12.28.

2.06 FACTORY FINISHING

A. Clean surfaces before applying paint.

B. Apply corrosion-resisting primer to all surfaces.

C. Apply finish coat of baked enamel paint to 2 mils thick.

D. Finish Color: Match Base Standard Brown.

2.07 SOURCE QUALITY CONTROL

A. Provide factory tests to IEEE C57.12.90 and IEEE C57.12.00. Include the routine tests as defined in the standards and the following other tests:

1. Impedance voltage and load loss.

2. Dielectric tests.

3. Audible sound level.

4. Zero-phase-sequence impedance voltage.

5. Temperature rise.

B. Test insulating liquid samples in accordance with IEEE C57.111.

C. Test transformer efficiency per DOE Test Method for Measuring the Energy Consumption of

Distribution Transformers under Appendix A to Subpart K of 10 CFR part 431.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that support pads provided under Section 03 3000 are ready to receive products.

B. Verify that field measurements are as indicated on shop drawings.

3.02 INSTALLATION

A. Install plumb and level.

B. Install safety labels to NEMA 260.

3.03 FIELD QUALITY CONTROL

A. See Section 01 4000 - Quality Requirements, for additional requirements.

B. Inspect and test in accordance with NETA ATS, except Section 4.

C. Provide services of a manufacturer's authorized representative to observe installation and assist in inspection and testing. Include manufacturer's reports with submittals.

D. Perform inspections and tests listed in NETA ATS, Section 7.2. Tests listed as optional are not required, except for the following:

1. Liquid-Filled Transformers:

a. If core ground strap is accessible, remove and measure core insulation resistance at 500 volts dc.

b. Measure insulating liquid's specific gravity, dissipation factor or power factor, and water content.

3.04 CLOSEOUT ACTIVITIES

A. See Section 01 7800 - Closeout Submittals, for closeout submittals.

FMKM179063

Type B.3 Final Submittal

MEDIUM-VOLTAGE TRANSFORMERS

(ISSUED ADDENDUM NO. 02)

26 1200 - 4

B. Training: Train Government's personnel on operation, adjustment, and maintenance of transformer and associated devices.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Provide minimum of two hours of training.

3. Instructor: Manufacturer's authorized representative.

4. Location: At project site.

3.05 ADJUSTING

A. Adjust primary taps so that secondary voltage is above and within 2 percent of rated voltage.

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 1

SECTION 27 0500

COMMON WORK RESULTS FOR COMMUNICATIONS (ISSUED ADDENDUM NO. 02)

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. The work included in this section of the specifications consists of furnishing labor, equipment, supplies, and materials, unless otherwise specified, and in performing operations necessary for the installation of communication work as listed in the Instruction to Bidders and as required by these specifications and shown on the drawings, subject to the terms and conditions of the contract. The work shall also include the completion of details of communication work not mentioned or shown which are necessary for the successful operation of communication systems described on the drawings or required by these specifications.

B. Furnish and install all equipment described herein, and as shown on the plans, to provide complete and operating systems for the project. All necessary cabling for connection to active equipment shall be provided for a complete and working system. Unless noted otherwise, junction boxes, back-boxes, and conduit rough-in for devices will be provided by the Division 26 subcontractor as defined in the specifications. However, any special back-boxes required for Division 27 equipment shall be furnished by the Division 27 contactor to the Division 26 contractor for installation.

C. Section Includes:

1. Definitions

2. Substitutions

3. Shop Drawings

4. Payment Request Breakdown

5. Project Record Drawings

6. Operating and Maintenance Manuals

7. Project Conditions

8. Permits

9. Authority Having Jurisdiction Inspections

10. Insurance

11. Commissioning and Testing

12. Guarantee/Warranty

13. Common requirements for Communication Installation

14. Cleaning and Protection

15. Equipment Furnished by Owner

16. Final Tests and Adjustments

17. Instruction of Owners Employees

1.03 DEFINITIONS

A. Basic Contract definitions are as follows:

1. Provide: The term "provide" means "to furnish and install, ready for the intended use and in complete operating condition."

2. Install: The term "install" is used to describe operations at project site including the actual "unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations."

3. Directed: Terms such as "directed," "requested," "authorized," "selected," "approved," "required," and "permitted" mean "directed by the Engineer," "requested by the Engineer," and similar phrases.

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 2

4. Approve: The term "approved," where used in conjunction with the Engineer's action on the Contractor's submittals, applications and requests, is limited to the Engineer's duties and responsibilities as stated in the Conditions of the Contracts.

5. Indicated: The term "indicated" refers to graphic representations, notes or schedules on the Drawings, or other Paragraphs or Schedules in the Specifications, and similar requirements in the Contract Documents. Where terms such as "shown," "noted," "scheduled and "specified" are used, it is to help the reader locate the reference; no limitation on location is intended.

6. Contractor: The term "Contractor" shall carry the same meaning as "Communications Contractor" or “Systems Integrator” or “Division 27 Contractor”.

7. Or Equal: The term "Or equal" shall carry the same meaning as "approved as equal by the Engineer"

8. Owner: All references here-in and on drawings to “Owner” shall be the same as “Minnesota Air National Guard”.

1.04 QUALITY ASSURANCE

A. Materials, products, devices, fixtures, forms or types of construction included in this specification shall meet or exceed the requirements of National Electrical Code (NEC), American National Standards Institute (ANSI), Institute of Electrical and Electronics Engineers (IEEE) and National Manufacturing Association (NEMA), Building Industry Consulting Service International, Inc. (BICSI), Electronic Industries Alliance/Telecommunications Industry Association (EIA/TIA), and the applicable local Codes.

1. Electrical Components, Devices, and Accessories: Listed and labeled as defined in

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

2. All communication workers on this project shall be thoroughly knowledgeable of all applicable codes related to all communication systems for this project. All installations shall be performed by skilled tradesmen fully aware of the latest techniques, practices, and standards of the industry. Haphazard or poor installation practice as determined by the Architect or Engineer will be cause for rejection of work.

3. Good workmanship and appearance shall be required. Carefully lay out all work in advance to install in a neat and good workmanship-like manner all in accordance with recognized practices and standards of the industry.

1.05 COORDINATION

A. All drawings, specifications and documents for this project shall be taken as a whole. Prior to installation, the Contractor shall be familiar with this project by carefully reviewing and comparing all documents that pertain to this project.

B. In preparation of the contract documents, a reasonable effort has been made to provide layouts and connections based on selected and specified manufacturer's equipment. Since physical space, connections, equipment arrangements and other requirements may vary according to each manufacturer, the final responsibility for connections, initial access and proper fit is the responsibility of the Contractor.

C. Coordinate chases, slots, inserts, sleeves, and openings with general construction work and arrange in building structure during progress of construction to facilitate the electrical installations that follow.

D. Sequence, coordinate, and integrate installing materials and equipment for efficient flow of the Work. Coordinate installing large equipment requiring positioning before closing in the building.

E. Prior to roughing in for communication equipment furnished by others, verify the voltage and current characteristics and control connections of this equipment. Notify the Engineer where equipment connection requirements do not match the provisions indicated on the documents.

F. Provide, locate, and coordinate location of access panels and doors for communication items that are concealed by finished surfaces. Locations of access panels to be provided to the

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 3 general contractor prior to shop drawing submittals to the Architect/Engineer for coordination purposes. Access panel requirements are located in the Division 8 specifications.

G. Where identification devices are applied to field-finished surfaces, coordinate installation of identification devices with completion of finished surface.

H. Where identification markings and devices will be concealed by acoustical ceilings and similar finishes, complete installation of these items prior to ceiling tile installation.

I. The drawings indicate only the approximate locations of rough-ins and may not indicate complete connection requirements. Prior to proceeding with any work or rough-ins the Contractor shall obtain all equipment rough-in requirements and information from the equipment supplier, manufacturer or from the respective trades furnishing the equipment or with Architect, to complete the installation in a neat and workmanship-like manner.

J. Scaled and calculated locations are approximate only. Before proceeding with work, carefully check and verify with building dimensions on architectural drawings, and be responsible for properly fitting equipment and materials together and to the structure in spaces provided.

K. Drawings are essentially diagrammatic and indicate the general arrangement of equipment.

Many offsets, bends, pull boxes, special fittings, etc. will be required which are not indicated.

Carefully study drawings and premises in order to determine best methods, exact locations, conduit routes, building obstructions, etc., to install apparatus and equipment. Install apparatus and equipment in manner and locations to avoid obstructions, preserve headroom, maintain code required clearances, and keep openings and passageways clear.

L. Where outlet boxes are located adjacent and opposite side of the same wall, the outlet boxes shall not be placed back to back, nor shall extension rings be used in place of double boxes, all to limit sound transmission between rooms. Provide short horizontal nipple between adjacent outlet boxes, which shall have depth sufficient to maintain wall coverage in rear by masonry material.

M. Where outlet boxes are located adjacent and opposite side of the same wall, the outlet boxes shall be rated or additional material (puddy, UL Listed Assembly, etc.) provided to maintain the indicated fire and/or smoke rating as indicated on the Architectural documents or meeting existing ratings.

N. Where outlet boxes are not provided with a device, whether new or existing, contractor shall provide a covering faceplate. No outlet box shall be left without a covering faceplate.

O. Coordinate arrangement, mounting, and support of communication equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

3. To allow right of way for piping and conduit installed at required slope.

4. So connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions and of the working and access space of other equipment.

5. To maintain access to user serviceable equipment.

6. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.

P. Permit and Inspection Fees

1. Secure regular inspections as required by State and local regulations. Pay charges by regulating agencies for Drawings, Specifications, review of Drawings and Specifications, and the inspections of installations.

2. Communications contractor shall pay all fees for permits, licensing, and inspections applicable to the work of Division 27.

3. Contractor shall pay all charges and fees levied by the serving utility and include these charges in the bid.

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 4

1.06 SUBMITTALS

A. General: Follow the procedures specified in Division 1 Sections.

B. Substitutions:

1. Submittal dates: For a period as stated in Division 1 sections, Engineer will consider written requests from bidders, manufacturers, and suppliers for substitution of products.

2. Submission: Submit a separate request for each product, supported with descriptions, drawings and samples as appropriate, including:

a. Comparison of the qualities of the proposed substitution with that specified.

Standard features and options of the proposed substitution shall be clearly identified on the submittal.

b. Changes required in other elements of the work because of the substitution.

c. Availability of maintenance service, and source of replacement materials.

d. Substitution request constitutes a representation that bidder submitting request:

1) Has investigated the proposed product and determined that it is equal to or superior in all respects to that specified.

2) Will provide the same warranties or bonds for the substitution as for the product specified.

3) Will coordinate the installation of an accepted substitution into the Work, and make such other changes as may be required to make the Work complete in all respects.

4) Waives all claims for additional costs, under his responsibility which may subsequently become apparent.

e. Engineer Review: The Engineer will review requests for substitutions with reasonable promptness to judge the acceptability of the proposed substitution, and notify bidders by addendum the decision to accept the requested substitution.

f. Late Request for Substitutions: Requests for substitution received after bidding will not be considered except in such cases where it is necessary to make a substitution due to strikes, lockouts, bankruptcy, discontinuing of a product, etc. Requests for such substitutions of materials after award of contract shall be made in writing to Engineer and shall be made within ten days of date that Contractor ascertains he cannot obtain material or equipment specified.

g. Engineer’s Acceptance: Engineer's acceptance of a substituted item applies only to the general quality and arrangement of the items substituted. Substituted items are still subject to the shop drawing review process.

C. Shop Drawings:

1. Before ordering any equipment, stamp with approval, and submit to the Engineer the number of copies required for the contractor's use, plus (1) one copy to be retained by the Engineer.

2. The review of shop drawings by the Architect/Engineer shall not constitute agreement of any deviations from the plans and specifications and shall not relieve the Contractor from responsibility for errors or omissions.

3. Shop drawings shall be in electronic copy format as follows:

a. A digital copy of shop drawings (Adobe Acrobat Portable Document Format - *.pdf – is preferred content format).

b. Submit the following and refer to each Section for specific requirements. Create a folder structure that follows the Section Numbering System, sequenced in order of section. The folders shall consist of the following:

4. The review of shop drawings by the Architect/Engineer shall not constitute agreement of any deviations from the plans and specifications and shall not relieve the Contractor from responsibility for errors or omissions.

5. Shop drawings shall be in electronic copy format as follows:

a. A digital copy of shop drawings (Adobe Acrobat Portable Document Format - *.pdf – is preferred content format).

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 5

b. Refer to drawings for the additional required equipment that is to be submitted as part of the shop drawing submittals.

D. Payment Request Breakdown:

1. For the purpose of establishing a schedule of values to be used for Application and

Certification for Payments as defined in the General Conditions of the specifications, the items of electrical work shall be broken down per the following schedule. Each item of schedule shall contain its proper share of overhead and profit and shall be broken into a labor and material figure.

a. Equipment Room Fittings

b. Backbone Cabling

c. Horizontal Cabling

d. Public Address Systems

e. Miscellaneous

2. Project Record Documents:

a. As work progresses: Record changes or deviations from the contract drawings as follows:

1) Record location and elevation of underground conduits and direct burial wiring.

2) Record as-built changes for communication work within the building that occur during the progress of construction and before the work is concealed. Record shall include such changes as:

3) Relocation of devices to avoid obstacles.

4) Routing of conduit from outlet to outlet.

5) Routing of conduit under floor, overhead, in walls or exposed.

6) Combining of circuits into common conduit.

7) Sizes of conduits and conductors.

b. Location: The record drawings shall be maintained at the job site and be subject to review by the Owner or Engineer during the construction period. Prints for this purpose may be obtained from the Architect at cost. This record keeping requirement shall not be construed as authorization for the Contractor to make changes in the layout without definite instructions by the Architect/Engineer in each case.

c. Submission: Upon completion of the work, a set of drawings showing changes as noted on the record set of prints shall be submitted to the Construction Manager.

3. Operating and Maintenance Manuals:

a. Submittal: At the completion of the contract submit to the Engineer sets of operating and maintenance manuals including parts lists bound into hard covered manuals for the electrical equipment. Each manual to include an electronic data disk of the entire operating and maintenance manual with folder structure and naming to match tabs in the manual. Manuals shall be labeled with the local supplier's name and address. Information not definitely applying to these particular pieces of equipment shall be crossed out or deleted from the submission. Information shall be included for equipment for which shop drawings have been provided.

b. Content:

1) Approved shop drawings or product data sheets alone are not to be considered as acceptable maintenance material. Most items of equipment are shipped with installation/maintenance sheets included in the shipping package which shall also be included into the maintenance manual.

2) Special warranties.

c. All test and commissioning data of each and every system as called out herein after being reviewed by the Engineer.

d. Hazardous Materials: Disposal Certificates.

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 6

1.07 PROJECT CONDITIONS

A. Exterior Environmental Conditions: Electrical systems shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:

1. Ambient Temperature: Temperature ranges at the Project location as determined by the

U.S. Weather Bureau.

2. Altitude: 1362 feet above sea level

B. Interior Environmental Conditions: Electrical systems shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:

1. Ambient Temperature: 72 to 75 deg F (conditioned spaces), 55 deg F to ambient

(unconditioned spaces).

2. Relative Humidity: 0 to 95 percent.

C. Interior Mission Critical Environmental Conditions: Electrical systems shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:

1. Ambient Temperature: 68 to 74 deg F (conditioned spaces.

2. Relative Humidity: 30 to 70 percent.

1.08 PERMITS

A. Obtain and pay fees for all licenses, required permits, and charges for use of outside services

(i.e. inspecting agencies or delivery services) and use of property other than the site of the Work for storage of materials or other purposes.

1.09 AUTHORITY HAVING JURISDICTION INSPECTIONS

A. Secure regular inspections as required by State and local regulations. Pay charges by regulating agencies for Drawings, Specifications, review of Drawings and Specifications, and the inspections of installations.

1.10 INSURANCE

A. Procure and maintain such insurance required by law and additional insurance, as specified in

Division 0 or 1, or by Construction Manager.

1.11 GUARANTEE/WARRARNTY

A. The communication system installed under this contract shall be left in proper working order.

Replace, without additional charge, new work or material which develops defects from ordinary use within one year unless a longer period is specified elsewhere, from substantial completion, except materials not furnished by the Contractor.

B. New materials and equipment shall be guaranteed against defects in composition, design or workmanship. Guarantee certificates shall be furnished on special equipment, indicated.

C. Special guarantee/warranty provisions, for certain work, are set forth in the following Sections:

1. 271300 Communication Backbone Cabling

2. 271500 Communication Horizontal Cabling

3. 275116 Public Address System

PART 2 - PRODUCTS

2.01 NOT APPLICABLE

PART 3 EXECUTION

3.01 COMMON REQUIREMENTS FOR COMMUNICATION INSTALLATION

A. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 7

B. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.

C. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.

D. Right of Way: Give to piping systems installed at a required slope.

3.02 FIRESTOPPING

A. Apply firestopping to penetrations of fire-rated floor and wall assemblies for electronic safety and security installations to restore original fire-resistance rating of assembly.

3.03 CLEANING AND PROTECTION

A. Progress Cleaning:

1. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

a. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

b. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F (27 deg C).

c. Containerize hazardous and unsanitary waste materials separately from other waste.

Mark containers appropriately and dispose of legally, according to regulations.

d. Use containers intended for holding waste materials of type to be stored.

e. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently.

1) Site: Maintain Project site free of waste materials and debris.

2. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

a. Remove liquid spills promptly.

b. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

c. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

3. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

4. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

5. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Division 01 Sections.

6. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

7. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

8. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

B. Final Cleaning:

FMKM179063

Type B.3 Final Submittal

COMMON WORK RESULTS FOR

COMMUNICATIONS (ISSUED

ADDENDUM NO. 02)

27 0500 - 8

1. Thoroughly clean electrical materials, equipment and apparatus to be free of dust, dirt, rust, and foreign materials before acceptance at Substantial Completion.

a. Clean communication materials in conformance with manufacturer's instructions.

b. Take special care to remove dirt, mortar, wire scraps, etc., from equipment interiors.

c. Clean accessible elements of disconnecting and protective devices of equipment with compressed air (less than 15 psi) and vacuum clean enclosure prior to being energized.

d. On completion of installation, including outlets, fittings, and devices, inspect exposed finish. Remove burrs, dirt, paint spots, and construction debris.

e. Protect equipment and installations and maintain conditions to ensure that coatings, finishes, and cabinets are without damage or deterioration at time of Substantial Completion.

3.04 EQUIPMENT FURNISHED BY THE OWNER

A. Contractor Requirement:

1. Inspect in presence of the Owner's Representative, and report in writing, any damage.

a. Assume responsibility for receiving, storing, protecting, installing, and connecting owner furnished equipment.

B. List of Owner furnished equipment:

1. Equipment as indicated on the drawings.

3.05 FINAL TESTS AND ADJUSTMENTS

A. Provide personnel for initial start-up and operation of the electrical equipment and for a trial run of the equipment to demonstrate that the equipment and associated systems are properly installed and operating as intended before the date of substantial completion.

1. Upon completion, subject the work to such tests as are required under industry standards and/or specified herein. Acceptance of the work by Owner shall be contingent upon satisfactory completion of these tests.

2. Subject the work to a careful and thorough visual inspection to detect erroneous or loose connections, damaged components, presence of foreign objects or materials, poor workmanship, incorrect ratings of overcurrent protective devices, or other abnormal conditions.

3.06 INSTRUCTION OF OWNERS EMPLOYEES

A. Provide the services of competent instructors, who will give full instructions in the care, adjustment, and operation of parts of the communication system and equipment to the Owner's employees who are to have charge of the equipment.

1. Each instructor shall be thoroughly familiar with parts of the installation on which they are to give instructions and shall have full knowledge of the operating theory and practical operation-maintenance work. Factory trained instructors shall be employed wherever they are available.

2. Instructions shall be given during the regular work week after the building has been accepted and turned over to the Owner for regular operation. In addition to the time indicated in other Division 27 sections, provide one day (8 hours) of instructions for general systems.

3. The instructions shall be given within three months after the work has been accepted and turned over to the Owner at a time mutually agreed on with the Owner.

4. Notify the Engineer in writing when such instruction has been completed.

FMKM179063

Type B.3 Final Submittal

COMMUNICATIONS EQUIPMENT ROOM

FITTINGS (ISSUED ADDENDUM NO. 02)

27 1100 - 1

SECTION 27 1100

COMMUNICATIONS EQUIPMENT ROOM FITTINGS (ISSUED ADDENDUM NO. 02)

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section Includes:

1. Telecommunications mounting elements

2. Backboards

3. Telecommunications equipment racks and cabinets

4. PDU

5. UPS Equipment

6. Network Switches (Government provided)

7. Safety and Performance Grounding

8. Patching and Network Electronic Coordination

1.03 DEFINITIONS

A. BICSI: Building Industry Consulting Service International B. LAN: Local area network C. PDU: Power Distribution Unit D. RCDD: Registered Communications Distribution Designer

1.04 SUBMITTALS

A. Product Data:

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for equipment racks and cabinets.

2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Meeting Minutes:

1. Provide meeting minutes and sign in sheets for all required meetings called out here-in.

C. Shop Drawings: For communications equipment room fittings. Include plans, elevations, sections, details, and attachments to other work.

1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

2. Equipment Racks and Cabinets: Include workspace requirements and access for cable connections.

3. Grounding: Indicate location of grounding bus bar and its mounting detail showing standoff insulators and wall mounting brackets.

D. Operating and Maintenance Manuals:

E. Content:

1. Approved shop drawings or product data sheets alone are not to be considered as acceptable maintenance material. Most items of equipment are shipped with installation/maintenance sheets included in the shipping package which shall also be included into the maintenance manual.

2. Special warranties.

3. All test and commissioning data of each and every system as called out herein after being reviewed by the Engineer.

FMKM179063

Type B.3 Final Submittal

COMMUNICATIONS EQUIPMENT ROOM

FITTINGS (ISSUED ADDENDUM NO. 02)

27 1100 - 2

1.05 QUALITY ASSURANCE

A. Installer Qualifications: Cabling Installer must have personnel certified by BICSI on staff.

1. Layout Responsibility: Preparation of Shop Drawings shall be under the direct supervision of a RCDD.

2. Installation Supervision: Installation shall be under the direct supervision of Level 2 Installer, who shall be present at all times when Work of this Section is performed at Project site.

3. Field Inspector: Currently registered by BICSI as Commercial Installer, Level 2 to perform the on-site inspection.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. Telecommunications Pathways and Spaces: Comply with TIA/EIA-569-A.

D. Grounding: Comply with ANSI-J-STD-607-A.

1.06 PROJECT CONDITIONS

A. Environmental Limitations: Do not deliver or install equipment frames until spaces are enclosed and weather tight, wet work in spaces is complete and dry, and work above ceilings is complete.

1.07 COORDINATION

A. Coordinate layout and installation of communications equipment with Owner's telecommunications and LAN equipment and service suppliers. Coordinate service entrance arrangement with local exchange carrier.

1. Meet jointly with telecommunications and LAN equipment suppliers, local exchange carrier representatives, and Owner to exchange information and agree on details of equipment arrangements and installation interfaces.

2. Record agreements reached in meetings and distribute them to other participants.

3. Adjust arrangements and locations of distribution frames, cross-connects, and patch panels in equipment rooms to accommodate and optimize arrangement and space requirements of telephone switch and LAN equipment.

4. Adjust arrangements and locations of equipment with distribution frames, cross-connects, and patch panels of cabling systems of other communications, electronic safety and security, and related systems that share space in the equipment room.

B. Coordinate location of power raceways and receptacles with locations of communications equipment requiring electrical power to operate.

C. Recorded agreements, equipment arrangement adjustments, and power coordination shall be provided with submittal information prior to approval by Architect/Engineer.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Equipment Frames

a. Chatsworth Products Inc.

b. Commscope

c. Hoffman

d. Hubbell

e. Panduit Corp

2. Power Strip/PDU

a. APC

b. CyberPower

c. Geist

FMKM179063

Type B.3 Final Submittal

COMMUNICATIONS EQUIPMENT ROOM

FITTINGS (ISSUED ADDENDUM NO. 02)

27 1100 - 3

d. Tripp Lite

3. Vertical PDU

a. APC

b. CPI

c. CyberPower

d. Tripp-Lite

4. Horizontal PDU

a. APC

b. CPI

c. CyberPower

d. Tripp-Lite

5. Grounding Kits

a. Provided by rack manufacturer

1) Horizontal Rack Ground Bar

2) Cable Runway Ground Strap

3) Equipment Ground Jumper Kit

6. UPS

a. APC

b. CyberPower

c. Xtreme Power

d. Minuteman Power Technologies

7. Network Switches (provided by Owner)

2.02 PATHWAYS

A. General Requirements: Comply with TIA/EIA-569-A.

B. Cable Support: NRTL labeled. Cable support brackets shall be designed to prevent degradation of cable performance and pinch points that could damage cable. Cable tie slots fasten cable ties to brackets.

1. Comply with NFPA 70 and UL 2043 for fire-resistant and low-smoke-producing characteristics.

2. Support brackets with cable tie slots for fastening cable ties to brackets.

3. Lacing bars, spools, J-hooks, and D-rings.

4. Straps and other…