CD-200-Block-Chapel-Roofs-QA_25JUL18.pdf
PDF 15 KB Posted
- Attached to
- Camp Dawson Roof Replacement Federal contract opportunity
- Solicitation number
- W912L8-18-B-0001
About this file
RFI's for Camp Dawson Roof Replacement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend3_Roof_Replacement.pdf | ||
| Amendment_3_Conform.pdf | ||
| CD-200-Block-Chapel-Roofs-QA_31JUL18.pdf | ||
| IFB_Amend_2_CD_Roof_Replacement.pdf | ||
| Roof_Replacement_Sign_In_Sheet.pdf | ||
| Roof_Replacement_Pre_Proposal_Slides.pdf | ||
| Amend_1_CD_Roof_Replacement.pdf | ||
| Camp_Dawson_Roof_Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/30/2018 Page 1 of 1
SOLICITATION W912L8-18-B-0001
200 Block and Chapel Roof Replacements
Camp Dawson Kingwood, WV
Invitation for Bid (Questions) and Answers
RFI # Date Question Answer
1. 23 July 18 How will sheathing be handled on this project?
Sheathing will be replaced in whole 4’x8’ sheets at time. Contractor will bid a per sheet cost on the proposal.
When a roof is stripped, a West Virginia Army National Guard (WVARNG) representative will mark sheets to be replaced. Contractors will be compensated via change order at completion of work.
2. 23 July 18 On Building 103, the Chapel how is the steeple to be addressed?
The WVARNG does not dictate means and methods; however would recommend using flashing around the steeple.
3. 23 July 18 On Building 103, the Chapel, are ice guards required? Yes, every 3’
4. 23 July 18 On row buildings (200 block) are hidden fasteners for gutters permitted? Hidden fasteners are permitted.
5. 23 July 18 On row buildings (200 block) will the freeze board be wrapped with metal?
Yes the freeze boards are to be re-wrapped with metal matching the gutters, fascia, and gutters.
6. 23 July 18 Will plastic splash bock be replaced in this contract?
No splash blocks are not included in this contract.
7. 23 July 18 Please clarify the T1-11 replacement.
The T1-11 replacement only pertains to building numbers 242 and 244 and only includes the gable area.