Date: RFI No.

IFB Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

1/10/2018 1 Solicitation Pages 20 and

Is there bonding requirements for this project?

Per Provision FAR 52.228-1 There will be a bid guarantee required of 20% of the bid price or $3M whichever is less.

The Clause FAR 52.228-15 Performance and Payment Bonds - Construction will be required. If you go to http://farsite.hill.af.mil/ you can view the provisions and clauses that are in by reference.

1/25/2018 2 Solicitation page 48 and pages 52-54

Can we leave the concrete that is to be removed along with the soil onsite or will we need to haul it off somewhere?

All debris to include concrete and soil must be disposed of off base. The contractor must also provide us with disposal documentation.

1/25/2018 3

Your response to the concrete debris question stated that both concrete and soil have to be disposed of off base. However, drawing CO-100 shows the designated on-site location for excess soil. What is to be disposed of there?

Any soil that is free of debris may be disposed of on base. See drawings or Civil Engineering for specific location.