ADDENDUM NO. 2
TO THE BIDDING DOCUMENTS FOR
TULSA AIR NATIONAL GUARD
REPAIR BUILDING 222 BERM SYSTEM
PROJECT No. XHZG162222
AIP PROJECT No. 1617B
December 07, 2017
CONTRACTOR SHALL INCORPORATE ALL CHANGES, REVISIONS, CORRECTIONS
AND MODIFICATIONS INCLUDED IN THIS ADDENDUM INTO THE BID FOR THIS
PROJECT. CONTRACTOR SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM
ON BID FORM.
DRAWING ITEMS:
ITEM NO. 1:
Revision: Refer to Drawing Sheet AN-001 New Site Plan.
Revise AN-001 New Site Plan per AN-001 New Site Plan attached.
ITEM NO. 2:
Revision: Refer to Drawing Sheet AN-301 New Section Details.
Revise AN-301 New Section Details per AN-301 New Section Details attached.
ITEM NO. 3:
Revision: Refer to Drawing Sheet AN-201 New Exterior Elevations.
At all occurrences delete, “New thin brick on thick mortar setting bed over metal lathe on,” and replace with, “New face brick, 2” air gap, and.”
SPECIFICATION ITEMS:
ITEM NO. 1:
Revision: Refer to Project Manual Project Table of Contents.
Insert, “04 20 00 Unit Masonry.”
12/07/2017
ITEM NO. 2:
Revision: Refer to the Project Manual.
Insert Section 04 20 00 Unit Masonry attached in entirety.
------------------------------------------END OF ADDENDUM---------------------------------------------
32'-8"
10'-8"22'-0"
22'-0" 33'-0"
55'-0" 44'-0"
79'-0"
101'-0"
22'-0"
22'-0"12'-0"
34'-0"13'-0"
24'-8"7'-4"
32'-0"
NEW 4" CONCRETE
PAD AND RELOCATED
CONDENSER UNIT
EXISTING RETAINING
WALL TO REMAIN
EXISTING RETAINING
WALL TO REMAIN
EXISTING RETAINING
WALL TO REMAIN
EXISTING RETAINING
WALL TO REMAIN
NEW SOD TYP.
WHERE HATCHED
BUILDING 222
FF = 608.60
NO WORK IN SHADED AREA
NEW AND EXISTING COMM LINES UNDER
NEW GRADE AND EXISTING SIDEWALK. REFER
TO CIVIL FOR INSTRUCTIONS ON REMOVAL
AND REINSTALLATION.
EXISTING COMM EQUIPMENT.
COORDINATE ADJUSTMENT TO
NEW GRADE WITH OWNER.
EXISTING GAS METER..
COORDINATE ADJUSTMENT TO
NEW GRADE WITH OWNER.
AN-201
AN-201
AN-201
AN-201
AN-001
NEW SITE PLAN
NORTH
NEW SITE PLAN
SCALE: 1" = 10'-0"
T U
L S
A
A
I R
N
A T
I O
N A
L
G
U A
R D
X H
Z G
T U
L S
A
A
T
I O
N A
L
G
U A
D
B
S
E
T
U L S
A
O
K L A
H O
M A
03/16/2017
1617B
SHEET NO.:
SHEET TITLE:
PROJECT NO.:
DATE:
CHECKED BY:
PROJ. MANAGER:
DRAWN BY:
DATEREV. DESCRIPTION
REVISIONS
SEAL:
ARCHITECTS
IN
3220 MARSHALL AVENUE
NORMAN, OK 73072
TEL: 405.360.1300
FAX: 405.360.1431
CSM
GL
R E
P A
I L
D I N
G
R
M
S
Y S
T E
M
BKW
03/16/2017
SITE PLAN LEGEND:
NEW SOD
SCALE: NO SCALE
NOT USED
04/24/17
ADD. # 1
12/07/17
ADD. # 2
NEW CONCRETE
FOOTING
EXISTING CONCRETE
WALL PANEL
NEW 2" RIGID
INSULATION BOARD
NEW FACE
BRICK VENEER
AN-301
AN-301
AN-301
NEW MASONRY
ANCHORS AT 16" O.C.
VERT., AND 36" O.C.
HORIZ.
NEW 2" AIR GAP
4"
GRADE - REF: CIVIL
EXISTING CONCRETE
FOOTING TO REMAIN
NEW FLUID APPLIED WATER
BARRIER
NEW 2" RIGID
INSULATION BOARD
NEW WEEP AT 32" O.C., TYP.
NEW THROUGH WALL FLASHING
NEW MASONRY ANCHORS AT 16"
O.C. VERT., AND 36" O.C. HORIZ.
NEW FACE BRICK VENEER
NEW CONCRETE FOOTING
NEW GROUT FILL
NEW FLUID APPLIED WATER
BARRIER
4"
GRADE - REF: CIVIL
NEW FLUID APPIED
WATER BARRIER
NEW 2" RIGID
INSULATION BOARD
NEW 2" AIR GAP
NEW MASONRY ANCHORS AT 16"
O.C. VERT., AND 36" O.C. HORIZ.
NEW FACE BRICK VENEER
EXISTING WALL
SHOWN SHADED
BACKER ROD AND SEALANT
CONTINUOUS AT NEW BRICK
VENEER
NEW FLUID APPLIED
WATER BARRIER
NEW 2" RIGID
INSULATION BOARD
NEW MASONRY ANCHORS AT 16" O.C.
VERT., AND 36" O.C. HORIZ.
NEW 2" AIR GAP
NEW ROWLOCK BRICK COURSE
EXISTING WALL
SHOWN SHADED
BACKER ROD AND SEALANT
CONTINUOUS AT NEW BRICK VENEER
NEW FACE
BRICK VENEER
NEW FLUID APPLIED
WATER BARRIER
NEW 2" RIGID
INSULATION BOARD
NEW 2" AIR GAP
NEW MASONRY ANCHORS AT 16"
O.C. VERT., AND 36" O.C. HORIZ.
NEW FACE
BRICK VENEER
EXISTING WALL
SHOWN SHADED
T Y
P
2" TYP. 8" TYP.
EPOXY SET #5 DOWELS
AT 12" O.C.. VERT, AND 24"
O.C. HORIZ.
EXISTING CONCRETE
FOOTING TO REMAIN
AN-301
NEW SECTION
DETAILS
T U
L S
A
A
T
I O
N A
L
G
U A
R D
X H
Z G
T U
L S
A
A
T
I O
N A
L
G
U A
D
T
L S
A
O
K L A
H O
M A
03/16/2017
1617B
SHEET NO.:
SHEET TITLE:
PROJECT NO.:
DATE:
CHECKED BY:
PROJ. MANAGER:
DRAWN BY:
DATEREV. DESCRIPTION
REVISIONS
SEAL:
ARCHITECTS
IN
3220 MARSHALL AVENUE
NORMAN, OK 73072
TEL: 405.360.1300
FAX: 405.360.1431
CSM
GL
R E
P A
I L
D I N
G
R
M
S
Y S
T E
M
BKW
03/16/2017
SCALE: 3/4"=1'-0"
NEW WALL SECTION
NORTH
PLAN DETAIL
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
NEW WALL SECTION DETAIL
SCALE: 3"=1'-0"
NEW WALL SECTION DETAIL
SCALE: 3"=1'-0"
NEW WALL SECTION DETAIL
8"
8"
8"
8"
04/24/17
ADD. # 1
12/07/17
ADD. # 2
N
T
REPAIR BLDG 222 BERM SYSTEM XHZG162222
Section 04 20 00 Page 1
SECTION 04 20 00
UNIT MASONRY
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High- Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A1064/A1064M (2017) Standard Specification for Carbon-
Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A153/A153M (2016) Standard Specification for Zinc
Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A653/A653M (2015; E 2016) Standard Specification for
Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM C1384 (2012a) Standard Specification for Admixtures for Masonry Mortars
ASTM C216 (2017) Standard Specification for Facing
Brick (Solid Masonry Units Made from Clay or Shale)
ASTM C270 (2014a) Standard Specification for Mortar for
Unit Masonry
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Clay or Shale Brick; G Insulation; G
Section 04 20 00 Page 2
SD-04 Samples
Mock-Up Panel; G Clay or Shale Brick; G
Admixtures for Masonry Mortar; G Anchors, Ties, and Bar Positioners; G
Insulation; G
SD-06 Test Reports
Efflorescence Test Field Testing of Mortar
SD-07 Certificates
Clay or Shale Brick
Admixtures for Masonry Mortar
Anchors, Ties, and Bar Positioners
Insulation
SD-08 Manufacturer's Instructions
Admixtures for Masonry Mortar
SD-10 Operation and Maintenance Data
Take-Back Program
1.3 QUALITY ASSURANCE
1.3.1 Masonry Mock-Up Panels
1.3.1.1 Mock-Up Panel Location
After material samples are approved and prior to starting masonry work, construct a mock-up panel for each type and color of masonry required. At least 48 hours prior to constructing the panel or panels, submit written notification to the Contracting Officer. Do not build-in mock-up panels as part of the structure; locate mock-up panels where directed. Construct portable mock-up panels or locate in an area where they will not be disrupted during construction.
1.3.1.2 Mock-Up Panel Configuration
Construct mock-up panels L-shaped or otherwise configured to represent all of the wall elements. Construct panels of the size necessary to demonstrate the acceptable level of workmanship for each type of masonry represented on
Section 04 20 00 Page 3 the project. Provide a straight panel or a leg of an L-shaped panel of minimum size 4 feet long by 4 feet high.
1.3.1.3 Mock-Up Panel Composition
Show full color range, texture, and bond pattern of the masonry work.
Demonstrate mortar joint tooling; grouting of reinforced vertical cores, collar joints, bond beams, and lintels; positioning, securing, and lapping of reinforcing steel; positioning and lapping of joint reinforcement (including prefabricated corners); and cleaning of masonry work during the construction of the panels. Also include installation or application procedures for anchors, wall ties, brick expansion joints, insulation, flashing, brick soldier, row lock courses and weeps.
1.3.1.4 Mock-Up Panel Construction Method
Where anchored veneer walls or cavity walls are required, demonstrate and receive approval for the method of construction; i.e., either bring up the two wythes together or separately, with the insulation and appropriate ties placed within the specified tolerances across the cavity. Demonstrate provisions to preclude mortar or grout droppings in the cavity and to provide a clear open air space of the dimensions shown on the drawings.
Where masonry is to be grouted, demonstrate and receive approval on the method that will be used to bring up the masonry wythes; support the reinforcing bars; and grout cells, bond beams, lintels, and collar joints using the requirements specified herein. When water-repellent is specified to be applied to the masonry, apply the approved product to the mock-up panel. Construct panels on a properly designed concrete foundation.
1.3.1.5 Mock-Up Panel Purpose
The completed panels is used as the standard of workmanship for the type of masonry represented. Do not commence masonry work until the mock-up panel for that type of masonry construction has been completed and approved.
Protect panels from the weather and construction operations until the masonry work has been completed and approved. Perform cleaning procedures on the mockup and obtain approval of the Contracting Officer prior to cleaning the building. After completion of the work, completely remove the mock-up panels, including all foundation concrete, from the construction site.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver, store, handle, and protect material to avoid chipping, breakage, and contact with soil or contaminating material. Store and prepare materials in already disturbed areas to minimize project site disturbance and size of project site.
1.4.1 Masonry Units
Cover and protect masonry units from precipitation. Conform to handling and storage requirements of TMS MSJC.
1.4.2 Reinforcement, Anchors, and Ties
Section 04 20 00 Page 4
Store steel reinforcing bars, coated anchors, ties, and joint reinforcement above the ground. Maintain steel reinforcing bars and uncoated ties free of loose mill scale and loose rust.
1.4.3 Cementitious Materials, Sand and Aggregates
Deliver cementitious and other packaged materials in unopened containers, plainly marked and labeled with manufacturers' names and brands. Store cementitious material in dry, weathertight enclosures or completely cover.
Handle cementitious materials in a manner that will prevent the inclusion of foreign materials and damage by water or dampness. Store sand and aggregates in a manner to prevent contamination and segregation.
1.5 PROJECT/SITE CONDITIONS
Conform to TMS MSJC for hot and cold weather masonry erection.
1.5.1 Hot Weather Procedures
When ambient air temperature exceeds 100 degrees F, or exceeds 90 degrees F and the wind velocity is greater than 8 mph, comply with TMS MSJC Article
1.8 D for: preparation prior to conducting masonry work; construction while masonry work is in progress; and protection for newly completed masonry.
1.5.2 Cold Weather Procedures
When ambient temperature is below 40 degrees F, comply with TMS MSJC Article
1.8 C for: preparation prior to conducting masonry work; construction while masonry work is in progress; and protection for newly completed masonry.
PART 2 PRODUCTS
2.1 MANUFACTURED UNITS
2.1.1 General Requirements
Do not change the source of materials, which will affect the appearance of the finished work, after the work has started except with Contracting Officer's approval. Submit test reports from an approved independent laboratory. Certify test reports on a previously tested material as the same materials as that proposed for use in this project. Submit certificates of compliance stating that the materials meet the specified requirements.
2.1.2 Clay or Shale Brick
2.1.2.1 General
2.1.2.1.1 Sample Submittal
Submit brick samples as specified, showing the color range and texture of clay or shale brick. Limit units used on the project to those that conform to the approved sample. Submit sample of colored mortar with applicable masonry unit and color samples of three stretcher units and one unit for each type of special shape.
Section 04 20 00 Page 5
2.1.2.1.2 Uniformity
Deliver clay or shale brick units factory-blended to provide a uniform appearance and color range in the completed wall.
2.1.2.1.3 Efflorescence Test
Test clay brick that will be exposed to weathering for efflorescence in accordance with ASTM C67. Schedule tests far enough in advance of starting masonry work to permit retesting if necessary. Units meeting the definition of "effloresced" are subject to rejection.
2.1.2.2 Solid Clay or Shale Brick
Provide solid clay or shale brick that conforms to ASTM C216, Type FBX.
Where brick cores, recesses, or deformation would be exposed to view, provide 100 percent solid units. Provide brick with texture and color tange to match the brick.
Provide brick with specified sizes.
a. Match size, color of existing brick.
2.1.2.3 Hollow Clay or Shale Brick
Provide hollow clay or shale brick that conforms to ASTM C652, Type HBX.
a. Provide brick size of matching existing brick.
2.2 MATERIALS
2.2.1 Mortar Materials
2.2.1.1 Cementitious Materials
Provide cementitious materials that conform to those permitted by ASTM C270.
2.2.1.2 Hydrated Lime and Alternates
Provide lime that conforms to one of the materials permitted by ASTM C207 for use in combination with portland cement, hydraulic cement, and blended hydraulic cement. Do not use lime in combination with masonry cement or mortar cement.
2.2.1.3 Colored Mortar
Use mortar pigment that conforms to ASTM C979/C979M. Add pigment to mortar to produce a uniform color matching existing. Furnish pigments in accurately pre-measured and packaged units that can be added to a measured amount of cementitious materials or supply pigments via preblended cementitious materials or dry mortar mix.
a. In masonry cement or mortar cement, do not exceed 5 percent of cement weight for mineral oxide pigment; do not exceed 1 percent of cement weight for carbon black pigment.
Section 04 20 00 Page 6
b. In cement-lime mortar mix, do not exceed 10 percent of cementitious materials' weight for mineral oxide pigment; do not exceed 2 percent of cementitious materials' weight for carbon black pigment.
2.2.1.4 Admixtures for Masonry Mortar
In cold weather, use a non-chloride based accelerating admixture that conforms to ASTM C1384, unless Type III portland cement is used in the mortar.
2.2.1.5 Aggregate and Water
Provide aggregate (sand) and water that conform to materials permitted by
ASTM C270.
2.3 MORTAR AND GROUT MIXES
2.3.1 Mortar Mix
a. Provide mortar Type [N] [S] [M] unless specified otherwise herein. [Do not use masonry cement in the mortar.] [Do not use air-entrainment in the mortar.]
b. Use ASTM C270 Type [S] [M] cement-lime mortar or mortar cement mortar for seismic-force-resisting elements indicated.[
c. Provide mortar that conforms to ASTM C270. Use Type [M] [S] [N] mortar [for foundation walls] [, basement walls,] [and in piers].][
d. Provide Type N or S mortar for non-load-bearing, non-shear-wall interior masonry.][
e. Provide approved commercial fire clay mortar or refractory cement (calcium-aluminate) mortar for fire brick and flue liners.]
[c][d][e][f]. For field-batched mortar, measure component materials by volume. Use measuring boxes for materials that do not come in packages, such as sand, for consistent batching. Mix cementitious materials and aggregates between 3 and 5 minutes in a mechanical batch mixer with a sufficient amount of water to produce a workable consistency. Do not hand mix mortar unless approved by the Contracting Officer. Maintain workability of mortar by remixing or retempering.
Discard mortar that has begun to stiffen or is not used within 2-1/2 hours after initial mixing.
[d][e][f][g]. For preblended mortar, follow manufacturer's mixing instructions.
2.4 ACCESSORIES
2.4.1 Anchors, Ties, and Bar Positioners
2.4.1.1 General
a. Fabricate anchors and ties without drips or crimps. Size anchors and ties to provide a minimum of 5/8 inch mortar cover from each face of masonry.
Section 04 20 00 Page 7
b. Fabricate steel wire anchors and ties shall from wire conforming to
ASTM A1064/A1064M and hot-dip galvanize in accordance with ASTM A153/A153M.
d. Fabricate sheet metal anchors and ties in conformance with ASTM A1008/A1008M. Hot dip galvanize sheet metal anchors and ties in exterior walls and in interior walls exposed to moist environment in compliance with ASTM A153/A153M Class B. Galvanize sheet metal anchors and ties in other interior walls in compliance with ASTM A653/A653M, Coating Designation G60.
e. Submit two anchors, ties and bar positioners of each type used, as samples.
2.4.1.2 Adjustable Anchors
2.4.1.2.1 Anchorage of Veneer to Light Gauge Steel or Concrete Backing
Use one of the following types of adjustable anchors to connect veneer to light gauge steel or concrete backing:
a. sheet metal at least 7/8 inch wide, 0.06 inch thick, and with corrugations having a wavelength of 0.3 to 0.5 inch and an amplitude of
0.06 to 0.10 inch or bent, notched or punched to provide equivalent performance;
b. wire anchors of minimum size W1.7 with ends bent to form a minimum 2 inches extension and without drips;
c. or wire pintle anchors used in conjunction with joint reinforcement.
Do not exceed 1/16 inch clearance between connecting parts of the tie.
Assemble adjustable anchors to prevent disengagement. Provide pintle anchors with one or more pintle legs of wire size W2.8 and an offset not exceeding 1-1/4 inch.
2.4.2 Through Wall Flashing and Weeps
2.4.2.1 General
Provide reinforced membrane sheet flashing except that flashing indicated to terminate in reglets shall be metal or coated-metal flashing
2.4.2.2 Reinforced Membrane Flashing
Provide polyester film core with a reinforcing fiberglass scrim bonded to one side. Provide membrane that is impervious to moisture, flexible, is not affected by caustic alkalis, and after being exposed for not less than 1/2 hour to a temperature of 32 degrees F, shows no cracking when, at that temperature, it is bent 180 degrees over a 1/16 inch diameter mandrel and then bent at the same point over the same size mandrel in the opposite direction 360 degrees.
2.4.2.3 Weep Ventilators
Section 04 20 00 Page 8
Provide weep ventilators that are prefabricated from stainless steel or plastic. Provide inserts with grill or louver-type openings designed to allow the passage of moisture from cavities and to prevent the entrance of insects, and with a rectangular closure strip to prevent mortar droppings from clogging the opening. Provide ventilators with compressible flanges to fit in a standard 3/8 inch wide mortar joint and with height equal to the nominal height of the unit..
2.4.2.4 Metal Drip Edge
Provide stainless steel drip edge, 15-mil thick, hemmed edges, with down-turned drip at the outside edge and upturned dam at the inside edge for use with membrane flashings.
2.4.3 RIGID BOARD-TYPE INSULATION
Provide rigid board-type insulation as specified in Section 07 21 13 BOARD
AND BLOCK INSULATION.
PART 3 EXECUTION
3.1 EXAMINATION
Prior to start of work, verify the applicable conditions as set forth in TMS MSJC, inspection.
3.2 PREPARATION
3.2.1 Stains
Protect exposed surfaces from mortar and other stains. When mortar joints are tooled, remove mortar from exposed surfaces with fiber brushes and wooden paddles. Protect base of walls from splash stains by covering adjacent ground with sand, sawdust, or polyethylene.
3.2.2 Loads
Do not apply uniform loads for at least 12 hours or concentrated loads for at least 72 hours after masonry is constructed. Provide temporary bracing as required.
3.2.3 Shelf Angles
Adjust shelf angles as required to keep the masonry level and at the proper elevation.
3.2.4 Bracing
Provide bracing and scaffolding necessary for masonry work. Design bracing to resist wind pressure as required by OSHA and local codes and submit bracing calculations, sealed by a registered professional engineer. Do not remove bracing in less than 10 days.
3.3 ERECTION
3.3.1 General
Section 04 20 00 Page 9
a. Coordinate masonry work with the work of other trades to accommodate built-in items and to avoid cutting and patching. Lay masonry units in the indicated bond pattern. Lay facing courses level with back-up courses, unless the use of adjustable ties has been approved in which case the tolerances is plus or minus 1/2 inch. Adjust each unit to its final position while mortar is still soft and has plastic consistency.
b. Remove and clean units that have been disturbed after the mortar has stiffened, and relay with fresh mortar. Keep air spaces, cavities, chases, expansion joints, and spaces to be grouted free from mortar and other debris. Select units to be used in exposed masonry surfaces from those having the least amount of chipped edges or other imperfections detracting from the appearance of the finished work.
c. When necessary to temporarily discontinue the work, step (rack) back the masonry for joining when work resumes. Toothing may be used only when specifically approved by the Contracting Officer. Before resuming work, remove loose mortar and thoroughly clean the exposed joint.
Cover the top of walls subjected to rain or snow with nonstaining waterproof covering or membrane when work is not in process. Extend the covering a minimum of 610 mm 2 feet down on each side of the wall and hold securely in place.
d. Ensure that units being laid and surfaces to receive units are free of water film and frost. Lay solid units in a nonfurrowed full bed of mortar. Bevel mortar for veneer wythes and slope down toward the cavity side. Shove units into place so that the vertical joints are tight. Completely fill vertical joints between solid units with mortar, except where indicated at control, expansion, and isolation joints. Place hollow units so that mortar extends to the depth of the face shell at heads and beds, unless otherwise indicated. Mortar will be permitted to protrude up to 1/2 inch into the space or cells to be grouted. Provide means to prevent mortar from dropping into the space below or clean grout spaces prior to grouting.
3.3.1.1 Jointing
Tool mortar joints when the mortar is thumbprint hard. Tool horizontal joints after tooling vertical joints. Brush mortar joints to remove loose and excess mortar.
3.3.1.1.1 Tooled Joints
Tool mortar joints in exposed exterior and interior masonry surfaces concave, using a jointer that is slightly larger than the joint width so that complete contact is made along the edges of the unit. Perform tooling so that the mortar is compressed and the joint surface is sealed. Use a jointer of sufficient length to obtain a straight and true mortar joint.
3.3.1.1.2 Door and Window Frame Joints
On the exposed interior side of exterior frames, joints between frames and abutting masonry walls shall be raked to a depth of 3/8 inch. On the exterior side of exterior frames, joints between frames and abutting masonry walls shall be raked to a depth of 3/8 inch.
Section 04 20 00 Page 10
3.3.1.1.3 Joint Widths
a. Construct brick masonry with mortar joint widths equal to the difference between the specified and nominal dimensions of the unit, within tolerances permitted by TMS MSJC.
b. Maintain mortar joint widths within tolerances permitted by TMS MSJC
3.3.1.2 Cutting and Fitting
Use full units of the proper size wherever possible, in lieu of cut units.
Locate cut units where they would have the least impact on the architectural aesthetic goals of the facility. Perform cutting and fitting, including that required to accommodate the work of others, by masonry mechanics using power masonry saws. Concrete masonry units may be wet or dry cut. Before being placed in the work, dry wet-cut units to the same surface-dry appearance as uncut units being laid in the wall. Provide cut edges that are clean, true and sharp.
a. Carefully make openings in the masonry so that wall plates, cover plates or escutcheons required by the installation will completely conceal the openings and will have bottoms parallel with the masonry bed joints. Provide reinforced masonry lintels above openings over 12 inches wide for pipes, ducts, cable trays, and other wall penetrations, unless steel sleeves are used.
b. Do not reduce masonry units in size by more than one-third in height and one-half in length. Do not locate cut products at ends of walls, corners, and other openings.
3.3.1.3 Unfinished Work
Rack back unfinished work for joining with new work. Toothing may be resorted to only when specifically approved by the Contracting Officer.
Remove loose mortar and thoroughly clean the exposed joints before laying new work.
3.3.1.4 Clay Masonry Expansion Joints
Provide clay masonry expansion joints as indicated. Construct by filling with a compressible foam pad. Ensure that no mortar or other noncompressible materials are within the joint. Install backer rod and sealant in accordance with Section 07 92 00 JOINT SEALANTS.
3.3.1.5 Control Joints
Provide control joints in concrete masonry as indicated. Construct by raking out mortar within the head joint in accordance with the details shown on the Drawings. Form a continuous vertical joint at control joint locations, including through bond beams, by utilizing half blocks in alternating courses on each side of the joint. Interrupt the control joint key in courses containing continuous bond beam reinforcement.
Where mortar was placed in the joint, rake both faces of the control joints to a depth of 3/4 inch. Install backer rod and sealant on both faces in accordance with Section 07 92 00 JOINT SEALANTS.
Section 04 20 00 Page 11
3.3.2 Clay or Shale Brick Masonry
3.3.2.1 Brick Placement
Blend all brick at the jobsite from several cubes to produce a uniform appearance when installed. An observable "banding" or "layering" of colors or textures caused by improperly mixed brick is unacceptable. Lay brick facing with the better face exposed. Lay brick in running bond with each course bonded at corners, unless otherwise indicated. Lay molded brick with the frog side down. Do not lay brick that is cored, recessed, or has other deformations in a manner that allows those deformations to be exposed to view; lay 100 percent solid units in these areas. Completely fill head and bed joints of solid units with mortar. Lay hollow units with mortar joints as specified for concrete masonry units. [Lay fire brick by dipping each brick in a soft mixture of fire clay and water and then rubbing the brick into place with joints as thin as practicable or provide refractory mortar with joints not more than 3/8 inch thick.]
Place exterior face of salvaged bricks towards the exterior.
3.3.2.2 Wetting of Units
Wetting of clay, shale brick, or hollow brick units having an initial rate of absorption of more than 1 gram per minute per square inch of bed surface shall be in conformance with ASTM C67. Ensure that each unit is nearly saturated when wetted but surface dry when laid.
Test clay or shale brick daily on the job, prior to laying, as follows:
Using a wax pencil, draw a circle the size of a quarter on five randomly selected bricks. Apply 20 drops of water with a medicine dropper to the surface within the circle on each brick. If the average time that the water is completely absorbed in the five bricks is less than 1-1/2 minutes, wet bricks represented by the five bricks tested.
3.3.2.3 Brick Sills
Lay brick on edge, slope not less than 3/4 inch downward to the outside, and project not less than 1/2 inch beyond the face of the wall to form a wash and drip. Fill all joints solidly with mortar and tool.
3.3.2.4 Reinforced Brick Walls
Provide two wythes of brick separated by a [_____] inch wide continuous space filled with [grout] [bricks "floated" in grout] and reinforced as indicated. Bevel mortar beds away from grout space to prevent projection into grout space when bricks are shoved in place. Deeply furrowed bed joints will not be permitted. Lay exterior wythe of brick to the height of each grout pour in advance of interior wythe. Clean grout space and set reinforcing before laying interior wythe. Provide metal ties to prevent spreading of the wythes and to maintain vertical alignment of walls. Place reinforcement and grout in accordance with paragraph BAR REINFORCEMENT INSTALLATION and paragraph PLACING GROUT in this Section.
3.3.2.5 Chimneys
Construct chimneys of brick with clay flue linings of the sizes indicated.
Extend flue linings from 12 inches below the smoke inlet to 4 inches above
Section 04 20 00 Page 12 the chimney cap. Place thimbles as indicated, flush with inside of or up to one inch into the flue lining. Set linings in fire clay mortar or refractory mortar and fill and smooth the joints on the inside. Set each section of flue lining before surrounding brickwork reaches top of flue lining section below. Build brickwork around lining, and [fill the space] [leave a one inch airspace] between lining and brickwork [with grout].
[Seal top of airspace before installing chimney cap.] Do not cut linings after they are installed in chimney. Unless indicated otherwise, provide a chimney cap of air-entrained concrete. Slope cap to a minimum edge thickness of 2 inches and reinforce with two rings of No. 3 gage galvanized steel wire.
3.3.2.6 Partitions
a. Construct partitions continuous from floor to underside of floor or roof deck where shown. Fill openings in firewalls around joists and other structural members as indicated or approved. Where suspended ceilings on both sides of partitions are indicated, the partitions other than those shown to be continuous may be stopped approximately 4 inches above the ceiling level. Construct an isolation joint in the intersection between partitions and structural or exterior walls.
b. Tie interior partitions having 4 inch nominal thickness units to intersecting partitions of 4 inch units, 5 inches into partitions of 6 inch units, and 7 inches into partitions of 8 inch or thicker units.
Cells within vertical plane of ties shall be filled solid with grout for full height of partition or solid masonry units may be used. Tie interior partitions over 4 inches thick together with joint reinforcement. Provide joint reinforcement with prefabricated pieces at corners and intersections of partitions.
c. Double-Faced Bases or Partitions: Construct double-faced clay unit bases and partitions of two-unit construction. Bond units by overlapping from opposite faces of the wall, 2 inches for 6 inch thick partitions and 4 inches for 8 inch thick or greater. A single wythe prefaced concrete masonry base or partition may be made with double faced units.
3.3.3 Anchored Veneer Construction
a. Construct exterior masonry wythes to the thickness indicated on the drawings. Provide a minimum [_____] inch air space behind the masonry veneer. Provide means to ensure that the cavity space and flashings are kept clean of mortar droppings and other loose debris. Maintain chases and raked-out joints free from mortar and debris.
b. Place masonry [in running bond pattern.] [in stacked bond pattern.]
[Place longitudinal reinforcement, consisting of at least one continuous hot-dip galvanized W 1.7 (9gauge) steel wire, in the veneer wythe when laid in stack bond.]
c. For veneer over stud framing, do not install veneer until the exterior sheathing, moisture barrier, veneer anchors and flashing have been installed on the backing. Take extreme care to avoid damage to the moisture barrier and flashing during construction of the masonry veneer. Repair or replace portions of the moisture barrier and
Section 04 20 00 Page 13 flashing that are damaged prior to completion of the veneer. Provide a continuous cavity as indicated.
d. For veneer with a masonry backup wythe, lay up both the inner and the outer wythes together except when adjustable joint reinforcement assemblies are approved for use. When both wythes are not brought up together, install through-wall flashings with the exterior wythe, securing the top edge of the flashing with a termination bar and sealant, or protect flashings that are installed with the interior wythe from damage until they are fully enclosed in the wall.
e. Provide anchors (ties) to connect the veneer to its backing in sufficient quantity to comply with the following requirements: maximum wall area per anchor {tie) of [_____], and maximum vertical spacing of [_____], and maximum horizontal spacing of [_____]. Provide additional anchors around openings larger than 16 inch in either direction. Space anchors around perimeter of opening at a maximum of [3 feet][24 inches] on center. Place anchors within 12 inches of openings. Anchors with drips are not permitted.
f. With solid units, embed anchors in mortar joint and extend into the veneer a minimum of 1-1/2 inch, with at least 5/8 inch mortar cover to the outside face.
g. With hollow units, embed anchors in mortar or grout and extend into the veneer a minimum of 1-1/2 inch, with at least 5/8 inch mortar or grout cover to outside face.
3.3.4 ANCHORAGE
3.3.4.1 Anchorage to Concrete
Anchorage of masonry to the face of concrete columns, beams, or walls shall be with dovetail anchors spaced not over 16 inches on centers vertically and 24 inches on center horizontally.
3.3.5 Sills and Copings
Set sills and copings in a full bed of mortar with faces plumb and true.
Slope sills and copings to drain water. Mechanically anchor copings and sills longer than 4 feet as indicated.
3.4 INSTALLATION
3.4.1 Flashing and Weeps
Install through-wall flashing at obstructions in the cavity and where indicated on Drawings. Ensure continuity of the flashing at laps and inside and outside corners by splicing in a manner approved by the flashing manufacturer. Ensure that the top edge of the flashing is sealed by attaching a termination bar and applying compatible sealant at the top edge of the termination bar. Terminate the horizontal leg of the flashing terminating the fabric flashing 1/2 inch short of the outside face of masonry and adhering the flashing to a sheet metal drip edge. Provide sealant below the drip edge of through-wall flashing.
Section 04 20 00 Page 14
Wherever through-wall flashing occurs, provide weep holes to drain flashing to exterior at acceptable locations as indicated. Provide weeps of open head joints with weep ventilators. Locate weeps not more than 24 inches on centers in mortar joints of the exterior wythe directly on the horizontal leg of through-wall flashing over foundations, bond beams, and any other horizontal interruptions of the cavity. Place weep holes perfectly horizontal or slightly canted downward to encourage water drainage outward and not inward. Other methods may be used for providing weeps when spacing is reduced to 16 inches on center and approved by the Contracting Officer.
Maintain weeps free of mortar and other obstructions.
3.5 APPLICATION
3.5.1 Insulation
Insulate cavity walls (multi-wythe noncomposite masonry walls), where shown, by installing board-type insulation on the cavity side of the inner wythe.
Apply board type insulation directly to the masonry or thru-wall flashing with adhesive. Neatly fit insulation between obstructions without impaling insulation on ties or anchors. Apply insulation in parallel courses with vertical joints breaking midway over the course below and in moderate contact with adjoining units without forcing. Cut to fit neatly against adjoining surfaces. Tape or seal the joints between the boards.
3.5.2 Interface with Other Products
3.5.2.1 Built-In Items
Fill spaces around built-in items with mortar. Point openings around flush-mount electrical outlet boxes in wet locations with mortar. Embed anchors, ties, wall plugs, accessories, flashing, pipe sleeves and other items required to be built-in as the masonry work progresses. Fully embed anchors, ties and joint reinforcement in the mortar. Fill cells receiving anchor bolts and cells of the first course below bearing plates with grout, unless otherwise indicated.
3.5.2.2 Door and Window Frame Joints
On the exposed interior and exterior sides of exterior frames, rake joints between frames and abutting masonry walls to a depth of 3/8 inch.
3.5.3 Tolerances
Lay masonry plumb, true to line, with courses level within the tolerances of TMS MSJC, Article 3.3 F.
3.6 FIELD QUALITY CONTROL
3.6.1 Tests
3.6.1.1 Field Testing of Mortar
Perform mortar testing at the following frequency: [__1___] time per [__1 day installation___]. For each required mortar test, provide a minimum of three mortar samples. Perform initial mortar testing prior to construction for comparison purposes during construction.
Section 04 20 00 Page 15
Prepare and test mortar samples for mortar aggregate ratio in accordance with ASTM C780 Appendix A4.
[3.6.1.2 Clay Brick Efflorescence Test
Test clay brick that will be exposed to weathering for efflorescence in accordance with ASTM C67. Schedule tests far enough in advance of starting masonry work to permit retesting if necessary. Units meeting the definition of "effloresced" are subject to rejection.
][]3.6.2 Special Inspection
Perform special inspections and testing in accordance with Section 01 45 35
SPECIAL INSPECTIONS.
3.7 POINTING AND CLEANING
After mortar joints have attained their initial set, but prior to hardening, completely remove mortar and grout daubs and splashings from masonry-unit surfaces that will be exposed or painted. Before completion of the work, rake out defects in joints of masonry to be exposed or painted, fill with mortar, and tool to match existing joints. Immediately after grout work is completed, remove scum and stains that have percolated through the masonry work using a low pressure stream of water and a stiff bristled brush. Do not clean masonry surfaces, other than removing excess surface mortar, until mortar in joints has hardened. Leave masonry surfaces clean, free of mortar daubs, dirt, stain, and discoloration, including scum from cleaning operations, and with tight mortar joints throughout. Do not use metal tools and metal brushes for cleaning.
3.7.1 Clay Brick Surfaces
Clean exposed clay brick masonry surfaces to obtain surfaces free of stain, dirt, mortar and grout daubs, efflorescence, and discoloration or scum from cleaning operations. Perform cleaning in accordance with the approved cleaning procedure demonstrated on the mockup.
After cleaning, examine the sample panel of similar material for discoloration or stain as a result of cleaning. If the sample panel is discolored or stained, change the method of cleaning to ensure that the masonry surfaces in the structure will not be adversely affected. Water-soak exposed masonry surfaces and then clean with a proprietary masonry cleaning agent specifically recommended for the color and texture by the clay brick manufacturer and manufacturer of the cleaning product. Apply the solution with stiff fiber brushes, followed immediately by thorough rinsing with clean water. Use proprietary cleaning agents in conformance with the cleaning product manufacturer's printed recommendations. Remove efflorescence in conformance with the brick manufacturer's recommendations.
3.8 CLOSE-OUT TAKE-BACK PROGRAM
Collect information from manufacturer for take-back program options. Set aside masonry units, full and partial to be returned to manufacturer for recycling into new product. When such a service is not available, seek local recyclers to reclaim the materials. Submit documentation that includes contact information, summary of procedures, and the limitations and
Section 04 20 00 Page 16 conditions applicable to the project. Indicate manufacturer's commitment to reclaim materials for recycling and/or reuse.
3.9 PROTECTION
Protect facing materials against staining. Cover top of walls with nonstaining waterproof covering or membrane to protect from moisture intrusion when work is not in progress. Continue covering the top of the unfinished walls until the wall is waterproofed with a complete roof or parapet system. Extend covering a minimum of 2 feet down on each side of the wall and hold securely in place. Before starting or resuming work, clean top surface of masonry in place of loose mortar and foreign material.
-- End of Section --