Revised_Evaluation_Factors-001.docx

DOCX document 12 KB Posted

Attached to
Replace Roofs at Buildings 36 & 2022
Solicitation number
W912JB-18-R-9004
Issued by

About this file

Revised evaluation factors for schedule submission requirements.

View the file

Other files

File Type Posted
W912JB-18-R-9004-0002.pdf PDF
W912JB-18-R-9004-0004.pdf PDF
Second_Site_Visit_Attendence_Sheet_Bldg_36_and_2022.docx DOCX document
2nd_Site_Visit_minutes_Bldg_36_and_2022_roof.docx DOCX document
W912JB-18-R-9004-0003.pdf PDF
Updated_Wage_Determination_(MI105).pdf PDF
W912JB-18-R-9004-001.pdf PDF
RFI-005.docx DOCX document
Amendment_to_instructions_to_offerors_section.docx DOCX document
RFI-004.docx DOCX document
RFI-003.docx DOCX document
RFI-002.pdf PDF
Bldg_36_and_2022_Drawings.pdf PDF
RFI-001.docx DOCX document
Building_36_and_2022_Site_Visit_Minutes.pdf PDF
36_and_2022_site_visit_sign_in_sheet.docx DOCX document
Building_36_Pics.pdf PDF
Bldg._2022_Pics.pdf PDF
W912JB-18-R-9004.pdf PDF
3._TDVG182579_Repair_Roofs_at_Bldgs._36_and_2022_100__Specs.pdf PDF
3._SOW_TDVG182579.doc DOC document
2._TDVG182579_AF_Form_66_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
Alpena_Base_Access_requirements.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB-18-R-9004-003

Evaluation Factor amendment

The below revision is being made to the Technical Evaluation factor: schedule

The Technical Evaluation consists of one factor: Construction Schedule.

Provide a construction schedule with a period of performance (POP) not to exceed 60 days after NTP. The schedule shall be task oriented, capturing all Statement of Work (SOW) requirements and indicate dates by which milestones are to be achieved. The offeror shall use a either a GANTT chart or an equivalent critical path scheduling approach. Equivalents shall include start dates, end dates and duration for each task and demonstrate the order in which tasks will be completed.

Acceptability will be based on the offeror’s demonstration of execution of the construction schedule outlining completion within the desired POP. The schedule shall capture all SOW requirements, execution timelines, and critical path items.

RATING
DESCRIPTION
Acceptable
Proposal clearly meets the minimum requirements of the solicitation
Unacceptable
Proposal does not clearly meets the minimum requirements of the solicitation