Amendment_to_instructions_to_offerors_section.docx

DOCX document 12 KB Posted

Attached to
Replace Roofs at Buildings 36 & 2022
Solicitation number
W912JB-18-R-9004
Issued by

About this file

The attached document describes changes made to the instructions to offerors.

View the file

Other files

File Type Posted
W912JB-18-R-9004-0002.pdf PDF
W912JB-18-R-9004-0004.pdf PDF
Second_Site_Visit_Attendence_Sheet_Bldg_36_and_2022.docx DOCX document
2nd_Site_Visit_minutes_Bldg_36_and_2022_roof.docx DOCX document
Revised_Evaluation_Factors-001.docx DOCX document
W912JB-18-R-9004-0003.pdf PDF
Updated_Wage_Determination_(MI105).pdf PDF
W912JB-18-R-9004-001.pdf PDF
RFI-005.docx DOCX document
RFI-004.docx DOCX document
RFI-003.docx DOCX document
RFI-002.pdf PDF
Bldg_36_and_2022_Drawings.pdf PDF
RFI-001.docx DOCX document
Building_36_and_2022_Site_Visit_Minutes.pdf PDF
36_and_2022_site_visit_sign_in_sheet.docx DOCX document
Building_36_Pics.pdf PDF
Bldg._2022_Pics.pdf PDF
W912JB-18-R-9004.pdf PDF
3._TDVG182579_Repair_Roofs_at_Bldgs._36_and_2022_100__Specs.pdf PDF
3._SOW_TDVG182579.doc DOC document
2._TDVG182579_AF_Form_66_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
Alpena_Base_Access_requirements.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB-18-R-9004-0001

Amendment to Instructions to offerors section

The following revision is being made to the instructions to offerors section:

5.3 Provide a construction schedule with a period of performance (POP) not to exceed 60 days after NTP, with all “Fast Tracking” areas clearly identified if proposed. The schedule shall be task oriented, capturing all Statement of Work (SOW) requirements and indicate dates by which milestones are to be achieved. The offeror shall use either the GANNT chart or an equivalent critical path scheduling approach and the schedules shall be graphically represented. The offeror shall also submit a brief written rationale (not to exceed 2 pages, typed with no smaller than 10pt font) explaining how the schedule will be achieved.

Evaluation Factors The Best Value offer will be determined on the basis of the lowest priced proposal meeting the acceptability standards for non-priced evaluation factors.

Non-Priced Evaluation Factors listed below were evaluated on an acceptable /unacceptable basis:

• Technical

• Past Performance

TECHNICAL

The Technical Evaluation consists of one factor: Construction Schedule.

Provide a construction schedule with a period of performance (POP) not to exceed 60 days after NTP, with all “Fast-Tracking” areas clearly identified if proposed. The schedule shall be task oriented, capturing all Statement of Work (SOW) requirements and indicate dates by which milestones are to be achieved. The offeror shall use a either the GANTT chart or an equivalent critical path scheduling approach and the schedules shall be graphically represented. The offeror shall also submit a brief written rationale (not to exceed 2 pages, typed with no smaller than 10pt font) explaining how the schedule will be achieved.

Acceptability will be based on the offeror’s demonstration of execution of the construction schedule Outlining completion within the desired POP. The schedule shall capture all SOW requirements, execution timelines, And critical path items. The written rationale shall describe coordination of work activities, phasing if applicable, And demonstrate an overview of how the project will be completed on time.