G-15 _Amendment_0002 _Released _13-R-0022 _25_July_2013.pdf
PDF 20 KB Posted
- Solicitation number
- W912GB-13-R-0022
About this file
W912GB-13-R-0022 Amendment 0002 Released 25JUL2013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G-15 _Amendment_0001 _Released _13-R-0022 _17_July_2013.pdf | ||
| C-05 _BID_SCHEDULE_STUTTGART_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet | |
| C-05 _Attachment_1_ExperienceOverviewSheet.docx | DOCX document | |
| C-05 _figures_to_be_attached_to_Section_C.pdf | ||
| C-05 _BID_SCHEDULE_GRAFENWOEHR_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet | |
| C-05 _13-R-0022_Solicitation_Released _SF33 _25_JUN_2013.pdf | ||
| C-05 _Attachment_3_PastPerformanceClientForm.docx | DOCX document | |
| C-05 _Attachment_2_ExperienceInformationSheet.docx | DOCX document | |
| C-05 _BID_SCHEDULE_HOHFENFELS_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATOCTEMPLATE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: Erosion Prevention / Dust Control and Natural Resource Protection Services Multiple Aw ard Task Order Contract (MATOC) The purpose of Amendment 0002 is to provide the Government's response to questions submitted by interested parties.
Note: Amendment 0001 extended the proposal due date to Monday, 05 August 2013, 1500 hours Central European Time (CET).
All other terms and conditions remain unchanged.
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-13-R-0022
X 9B. DATED (SEE ITEM 11)
25-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2013
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB-13-R-0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
AMENDMENT 0002
W912GB-13-R-0022 Erosion Prevention / Dust Control and Natural Resource Protection Services, Germany MATOC Questions and Answers
1. Question: In Pre-Proposal conference was mentioned that we should submit three separate Volume 2 Price Proposals, if submitting for all three geographic locations. In Amendment 0001 page 70 is stated “This volume shall include separate tabs with the Price Table and specify each geographic location as applicable.” What is required for Volume 2, three separate Binders for each location or one binder including all locations?
Answer: As stated at the pre-proposal conference each Excel Price Table has a few line items that are different for each geographical location. Therefore, if your firm plans to propose to more than one geographical location, then the Offeror must submit a Price Table for each location. Regarding your concern about Volume 2, three (3) separate tabs for each price schedule within one (1) binder will be sufficient.
2. Question: Offers should submit a completed Section B. Do we have to fill out the page 2- 11 (Item
No 0001- 4002) with the totals and the CMR also?
Answer: Yes, Offerors are required to complete Section B, pages 2 – 11.
3. Question: In Pre-Proposal conference was mentioned that we should submit one Volume 1
Technical Proposal with the locations mentioned, if submitting for all three geographic locations.
In Amendment 0001 in the Answer of Question 4 is stated: “If your firm plans to submit technical proposals for each of the three (3) geographical locations, the content of the proposal can be the same;
however, you need to specify which geographical location is being proposed. Therefore, your firm can submit the same technical proposal for all three (3) geographical locations, but you must specify which location is being proposed.”
Do we have to submit one Volume 1 Technical Proposal with the locations mentioned, if submitting for all three geographic locations or do we need a separate Volume 1 Technical Proposal for each geographic location?
W912GB-13-R-0022
Answer: If your firm plans to propose the same projects for each geographical location, then one Volume I Technical Proposal with all geographical locations mentioned would be sufficient. If your firm plans to propose different projects for each geographical location then your firm must separate each geographical proposal into a separate tab within one (1) binder.
NOTE: No more questions can be submitted after Tuesday, 23 July 2013 at 1500 hours Central European Time (CET).
(End of Summary of Changes)
File details come from the government source that posted it. Updated .