C-05 _13-R-0022_Solicitation_Released _SF33 _25_JUN_2013.pdf
PDF 1 MB Posted
- Solicitation number
- W912GB-13-R-0022
About this file
W912GB-13-R-0022 Solicitation SF33
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G-15 _Amendment_0002 _Released _13-R-0022 _25_July_2013.pdf | ||
| G-15 _Amendment_0001 _Released _13-R-0022 _17_July_2013.pdf | ||
| C-05 _BID_SCHEDULE_STUTTGART_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet | |
| C-05 _Attachment_1_ExperienceOverviewSheet.docx | DOCX document | |
| C-05 _figures_to_be_attached_to_Section_C.pdf | ||
| C-05 _BID_SCHEDULE_GRAFENWOEHR_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet | |
| C-05 _Attachment_3_PastPerformanceClientForm.docx | DOCX document | |
| C-05 _Attachment_2_ExperienceInformationSheet.docx | DOCX document | |
| C-05 _BID_SCHEDULE_HOHFENFELS_EROSION_CONTROL_NAT_RES_.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 24 Jul 2013
X
A X B X C
D
EX
X G F 108 - 121
122 - 140 X H 141 - 147
Sarah.Downs@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 147
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912GB 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Wiesbaden, Germany conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SARAH DOWNS 011-49-611-9744-2624
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 14
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
15 - 75 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
77 - 78
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 79 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 80 - 92 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
93 - 107
PART II - CONTRACT CLAUSES
CONTRACTING DIVISION
US ARMY CORP OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
MATOCTEMPLATE
5. DATE ISSUED
25 Jun 2013
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912GB-13-R-0022
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1,700,000 Job Erosion Control/Natural Resource,Germany
FFP
BASE YEAR
The Contractor shall provide all personnel, materials, and equipment for
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE
PROTECTION SERVICES within the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well.
The contract performance period is for one (1) one-year Base Period and four (4) one year options.
Firm-Fixed-Price (FFP) Task Orders (TOs) will be issued against the contract and work will be performed in accordance with (IAW) Section B, Supplies or Services and Prices and Section C - Specification/Work Statement.
All labor rates will be in accordance with the awarded contract and include direct/indirect costs associated with performing the contract.
The individual TO minimum ordering amount is $ 2,500. The maximum amount of the contract shall not exceed $8,500,000.00 for each US Garrison, which is the maximum capacity for the Base Period and Four One-Year Options.
Base year minimum guarantee shall be funded with the first Task Order award.
The minimum guarantee shall be $10,000 for the entire contract which includes the Base and Four (4) one-year Options.
FOB: Destination
PURCHASE REQUEST NUMBER: MATOCTEMPLATE
NET AMT
0002 1 Job Contract Management Rpt
FFP
BASE YEAR
Contractor Manpower Reporting (CMR) Base year time for fulfilling the CMR requirement when or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs).
See Section B for Contractor Manpower reporting information and refer to Section H Clause 52.000-4102.
1001 1,700,000 Job OPTION Erosion Control/Natural Resource,Germany
FFP
FIRST OPTION YEAR
The Contractor shall provide all personnel, materials, and equipment for
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE
PROTECTION SERVICES within the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well.
The contract performance period is for one (1) one-year Base Period and four (4) one year options.
Firm-Fixed-Price (FFP) Task Orders (TOs) will be issued against the contract and work will be performed in accordance with (IAW) Section B, Supplies or Services and Prices and Section C - Specification/Work Statement.
All labor rates will be in accordance with the awarded contract and include direct/indirect costs associated with performing the contract.
The individual TO minimum ordering amount is $ 2,500. The maximum amount of the contract shall not exceed $8,500,000.00 for each US Garrison, which is the maximum capacity for the Base Period and Four One-Year Options.
1002 1 Job OPTION Contract Management Rpt
FFP
FIRST OPTION YEAR
Contractor Manpower Reporting (CMR) Base year time for fulfilling the CMR requirement when or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs).
See Section B for Contractor Manpower reporting information and refer to
2001 1,700,000 Job OPTION Erosion Control/Natural Resource,Germany
FFP
SECOND OPTION YEAR
The Contractor shall provide all personnel, materials, and equipment for
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE
PROTECTION SERVICES within the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well.
The contract performance period is for one (1) one-year Base Period and four (4) one year options.
Firm-Fixed-Price (FFP) Task Orders (TOs) will be issued against the contract and work will be performed in accordance with (IAW) Section B, Supplies or Services and Prices and Section C - Specification/Work Statement.
All labor rates will be in accordance with the awarded contract and include direct/indirect costs associated with performing the contract.
The individual TO minimum ordering amount is $ 2,500. The maximum amount of the contract shall not exceed $8,500,000.00 for each US Garrison, which is the
2002 1 Job OPTION Contract Management Rpt
FFP
SECOND OPTION YEAR
Contractor Manpower Reporting (CMR) Base year time for fulfilling the CMR requirement when or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs).
See Section B for Contractor Manpower reporting information and refer to
3001 1,700,000 Job OPTION Erosion Control/Natural Resource,Germany
FFP
THIRD OPTION YEAR
The Contractor shall provide all personnel, materials, and equipment for
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE
PROTECTION SERVICES within the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well.
The contract performance period is for one (1) one-year Base Period and four (4) one year options.
Firm-Fixed-Price (FFP) Task Orders (TOs) will be issued against the contract and work will be performed in accordance with (IAW) Section B, Supplies or Services and Prices and Section C - Specification/Work Statement.
All labor rates will be in accordance with the awarded contract and include direct/indirect costs associated with performing the contract.
The individual TO minimum ordering amount is $ 2,500. The maximum amount of
3002 1 Job OPTION Contract Management Rpt
FFP
THIRD OPTION YEAR
Contractor Manpower Reporting (CMR) Base year time for fulfilling the CMR requirement when or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs).
See Section B for Contractor Manpower reporting information and refer to
4001 1,700,000 Job OPTION Erosion Control/Natural Resource,Germany
FFP
FOURTH OPTION YEAR
The Contractor shall provide all personnel, materials, and equipment for
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE
PROTECTION SERVICES within the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well.
The contract performance period is for one (1) one-year Base Period and four (4) one year options.
Firm-Fixed-Price (FFP) Task Orders (TOs) will be issued against the contract and work will be performed in accordance with (IAW) Section B, Supplies or Services and Prices and Section C - Specification/Work Statement.
All labor rates will be in accordance with the awarded contract and include direct/indirect costs associated with performing the contract.
The individual TO minimum ordering amount is $ 2,500. The maximum amount of
4002 1 Job OPTION Contract Management Rpt
FFP
FOURTH OPTION YEAR
Contractor Manpower Reporting (CMR) Base year time for fulfilling the CMR requirement when or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs).
See Section B for Contractor Manpower reporting information and refer to
CLIN STRUCTURE
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY
AND
CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN MINIMUM MINIMUM MAXIMUM MAXIMUM
QUANTITY AMOUNT QUANTITY AMOUNT
0001 $ $
0002 $ $
1001 $ $
1002 $ $
2001 $ $
2002 $ $
3001 $ $
3002 $ $
4001 $ $
4002 $ $
SECTION B
SECTION B
SUPPLIES OR SERVICE AND PRICES/COSTS
Erosion Prevention/Dust Control and Natural Resource Protection Services
Purpose and Scope
The objective of the contract is to provide a Firm Fixed Priced (FPP), Indefinite Delivery, Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOCs) to provide support for reducing/preventing erosion and controlling dust and the protection of natural resources at the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well. This solicitation will cover multiple contract awards with a total capacity of $8.5M for each US Garrison up to $25.5M total ($8.5M times three). The $8.5M capacity shall be evenly divided between the successful awardees (up to a maximum of three) for that particular Garrison. Up to three IDIQ Erosion Prevention/Dust Control and Natural resource Protection Contracts will be issued at each Garrison under this solicitation, USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart. These FFP, IDIQ, MATOCs for services will be awarded on a full and open competitive basis.
Note that although the primary focus of this contract is at USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, the Contractor may be required to perform similar work, with a maximum of 15% of work, at other U.S. installations elsewhere within Germany. The work will primarily focus on US Army Europe (USAREUR) installations within Germany, but could extend to any other facilities (US or non-US) located throughout Germany.
The Contract(s) awarded as a result of this solicitation shall be awarded on the basis of best overall value to the Government using a trade-off process, weighing both technical approach and price. The detailed scope and locations for the work will be specified under individual task orders.
This solicitation will cover multiple contract awards (up to three for each Garrison) with a total capacity of US $8,500,000.00, for each US Garrison: USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart. There is no limit in the number of Task Order(s) that may be executed.
The contract will end upon reaching the total term of five (5) years or upon reaching the total capacity or an option period is not exercised. Each awardee of a contract for each Garrison shall have a fair opportunity for task orders. All contracts in each Garrison shall be funded by the $8,500,000.00, contract maximum, which, shall not be exceeded. There will be no more than three (3) contract awards per Garrison: USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart.
Period of Service
Day one of the contract shall be the Contracting Officer signature date. The ordering period for the contract will automatically end up on the completion of the base period, if the option period is not exercised. Task Orders may be issued up to the date of contract expiration. Modifications to individual task orders may be issued after the expiration of the contract ordering period.
The contract will include a base period (one year) and four (1) one-year option periods, for a total contract performance period of five years. If ordering capacity is fully utilized for any period before the one-year time limit, the Government may decide to exercise the next option period and adjust the contract performance dates. The maximum overall cumulative value of all work awarded under the contract resulting from this solicitation will be $8,500,000.00 for five
(5) years, over the life of the contract. The task order minimum limit is $2,500.00 and the $1,000,000.00 each. Approximately $1,700,000.00 will be utilized per year for the base and each of the four option years per Garrison. Other than this, there is no limit to the number and size of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations. The Government reserves the right to divert the Contractor to work on TOs of higher priority. In such cases, time extensions will be granted for completion of TOs that have been delayed because of Government directions.
The awarded contracts shall have a total guarantee minimum amount of $10,000.00 for the entire contract. The guaranteed minimum may be met with the obligation of a task order meeting or exceeding the guarantee amount and shall be de-obligated when the obligation occurs.
Ordering Procedures for Task Orders
As each project is identified for execution under this contract, a Request for Proposal (RFP) will be issued to the Contractor. Each RFP letter will contain the project title, project location, list of major tasks to be accomplished, schedule for negotiations, and the name of the Government Negotiator. As attachments to the RFP the Government will provide, as necessary, proposal format information and applicable project background information. Scopes will vary in detail and clarity but will provide an adequate description of the actual services required to allow suitable negotiations. Typically the individual Task Orders will provide the Contractor the start of work, location, description of work, and time of execution. When applicable, the quantities of a particular item that is required will be stated and a map/sketch showing the work locations will be included.
All submissions shall be in English unless otherwise requested. The Price Table shown in Section B of this contract will be used as a basis for developing cost proposals, negotiating and coming to a agreed upon cost of the required work under a Task Order. A detailed explanation of the efforts that are to be included in most of the line items is given in Section C.5 of this Scope of Work. The remaining line items should be self-explanatory.
As required under the Task Order, the Contractor must receive approval from the Contracting Officer or the COR on all site specific plans (i.e., HASP, Work Plans, QA/QC Plans, etc.) prior to initiating any on-site activity.
It is the Contractor’s responsibility to obtain base access from Base Commanders in accordance with AE Regulation 190-16, Installation Access Control, dated 5 December 2002. Failure to obtain base access may result in termination of the Contract.
The Government reserves the right to issue additional solicitations and award additional contracts within the region covered by this solicitation. In addition, this contract may be combined with other Government contracts for the purpose of better competition. In this event, other contractors, in accordance with the terms of their contracts, may compete for Task Orders with the Contractor selected under this solicitation.
Section C - Descriptions and Specifications
STATEMENT OF WORK
Section C - Descriptions and Specifications
STATEMENT OF WORK
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES
CONTRACT
TABLE OF CONTENTS
C-1.0 GENERAL
C-1.1Contract Definition C-1.2 Total Amount of Contract C-1.3Guarantee C-1.4 Introduction C-2.0 TASK ORDERS (TOs) C-2.1 Preparation of Work Plans for Erosion Control Work C-2.2 Protecting/Repairing Eroded Areas C-2.3 Repairing/Constructing Check Dams/Retention Basins/Dams C-2.4 Install Simple Wooden Structures C-2.5 Cleaning Water Courses C-2.6 Repair/Placement of Pipelines C-2.7 Aerial Seeding C-2.8 Trafficable Crossings C-2.9 Dust Control C-2.10 Maneuver Trails C-2.11 Access Roads C-2.12 Repair of Sinkholes C-2.13 Brush Clearing/Tree Pruning for Threatened and Endangered Species Maintenance C-2.14 Natural Resource Management Actions
C-2.15 UXO Avoidance Using Magnetrometer Sweep C-2.16 Tank Roads Repair C-2.17 Natural Resource Management Actions
C-3.0 TASK ORDER EXECUTION
C-3.1 Request for Proposal (RFP) C-3.2 Task Order Scopes of Work C-3.3 Task Order Requirements C-3.4 Performance Standards
C-4.0 GENERAL REQUIREMENTS
C-4.1 Point of Contact C-4.2 Public Disclosures C-4.3 Laws, Regulations and Standards C-4.4 US Government Furnished Equipment, Materials, and Personnel C-4.5 Passes/Identification C-4.6 Exercising of Options C-4.7 Management Plan C-4.8 Cooperation with Other Contractors C-4.9 Ammunition C-4.10 Special Conditions C-4.11 Submittals C-4.12 Certificates of Compliance C-4.13 Quality Control
C-4.14 Soil for Earthen Check Dams C-5.0 Price Table Line Item
Section C – Description/Specifications/Work Statement
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES
JUNE 2013
GENERAL
This Section C sets forth the general requirements for the performance of the various services required under this contract.
C-1.1 Contract Definition:
The objective of the contract is to provide a Firm-Fixed-Priced (FFP), Indefinite-Delivery/Indefinite-Quantity (IDIQ), Multiple Award Task Order Contracts (MATOCs) to provide support for reducing/preventing erosion and controlling dust and the protection of natural resources at the following US Garrisons (USAGs): USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but will include other training areas as well. This solicitation will cover multiple contract awards with a total capacity of $8.5M for each US Garrison up to $25.5M total ($8.5M multiplied by three (3)). The $8.5M capacity shall be competitively divided between the successful awardees for each Garrison. Up to three (3) IDIQ Erosion Prevention/Dust Control and Natural Resource Protection contracts will be issued at each Garrison covered as a under this solicitation. These FFP, IDIQ, MATOCs for services will be awarded on a full and open competitive basis.
Note that although the primary focus of this contract is at USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, the Contractor may be required to perform similar work, with a maximum of 15% of work, at other U.S.
installations elsewhere within Germany. The work will primarily focus on US Army Europe (USAREUR) installations within Germany, but could extend to any other facilities (US or non-US) located throughout Germany.
The contract(s) awarded as a result of this solicitation shall be awarded on the basis of best overall value to the Government using a trade-off process, weighing both technical approach and price.
C.1.2 Total Amount of Contract: This solicitation will cover multiple contract awards (up to three (3) for each Garrison) with a total capacity of US $8,500,000.00, for each US Garrison: USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart. There is no limit in the number of Task Order(s) that may be executed. The contracts end upon reaching the total term of five (5) years or upon reaching the total capacity or when the options are not exercised. The total capacity for each Garrison of US $8,500,000.00, shall be competitively awarded between the successful awardees for that particular Garrison. There will be no more than three (3) contract awards per US Garrison: USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart.
C.1.3 Guarantee: The awarded contracts shall have a total guarantee minimum amount of US $10,000.00 for the Base period. There are no minimum guarantees for option years that are exercised by the Government. The guaranteed minimum may be met with the obligation of a Task Order meeting or exceeding the guarantee amount and shall be de-obligated when the obligation occurs.
C.1.4 Introduction.
This contract provides support for reducing/preventing erosion, controlling dust, and protecting natural resources within the following US Garrisons: USAG Grafenwoehr, USAG Hohenfels, and USAG Stuttgart, but also to include other training areas as well. Work includes the servicing of existing and construction of new check dams and other erosion control structures and any additional erosion protection measures required. The ongoing erosion control work is required in areas (1) in or immediately adjacent to watercourses; (2) of overland flow from rainfall or snowmelt; and (3) where maneuver actions have exacerbated erosion problems. Dust control, vegetation maintenance and removal, and aerial seeding are also required within the training areas and can be performed under this contract.
Landscape Preservation - The Contractor shall give attention to the effect of contract operations upon the landscape, shall take care to maintain natural surroundings, and shall conduct the work in compliance with the following requirements: a. The Contractor shall take sufficient precautions to prevent pollution with fuels, oils or other harmful materials; and b. The Contractor shall clean up all garbage left at the worksite. Subcontractor Approval - The contractor may use rental equipment and/or subcontractors. The Government shall approve the use of any subcontractors. The contractor shall provide the Government with the make, model, manufacturer, date and operator's qualifications for substitute equipment and operators.
C-1.5 Scope of Work In order to control erosion within U.S. military facilities and/or to reduce the adverse effects of these erosive actions the military continuously performs erosion control measures throughout the training areas. In addition to general ongoing repair work, the military constructs features such as trafficable crossings, check dams, roadways and/or other erosion control measures along water courses. Approximately 150 check dams can be found in the training areas. Each year, ongoing maintenance is performed on these structures in order to assure their continued proper functioning. Beyond the upkeep of the existing erosion control structures, erosion problems along watercourses and other areas that erode as a result of adverse weather conditions and/or troop movement need to be re-stabilized on a periodic basis. Additionally, structures such as culverts and maneuver roads may need to be repaired when there are associated erosion problems.
These actions assist with carrying out a program of planning for, and the development of, maintenance, and coordination of natural resources related services. This includes fauna habitat improvements or modification, range (or training area) rehabilitation where necessary for support of protected species, and generally supporting the execution of the Integrated Natural Resources Management Plan (INRMP). This also includes prevention and control of invasive species in accordance with the INRMP and EO 13112, Invasive Species/ DoDI 4715.03 and
4150.07 . Specific actions include the detection and response to eradicate or control populations of invasive species along with monitoring the results. More specifically, natural resources management actions include, but are not limited to, mapping of the occurrence of invasive species, repairing infrastructure that provides access to buildings housing threatened or endangered species, improving access to bat roosts, camera/monitoring systems , maintenance and installation of bird and bat nesting boxes, maintenance of historic orchards, collection of scions from historic fruit trees, and documentation of management actions. Any plan or project not directly connected with or necessary for the management of German designated areas of the European net “Natura 200,” but likely to have a significant effect thereon, either individually or in combination with other plans or projects, shall be subject to appropriate assessment of its implication for the site in view of the site’s conservation objectives.
The Contractor shall furnish all personnel, materials, and services required to reduce erosion through the repair, maintenance, improvement or construction of control structures or protection of deteriorating terrain within areas used by the U.S. military in Germany. These services will be requested through individual Task Orders (TOs) issued under this contract. To accomplish these goals the Contractor shall provide a wide range of services including, but not limited to:
a. Preparation of work plans for erosion control work
b. Protecting/preventing/repairing eroded (or potentially eroding) areas
c. Repairing/constructing check dams, retention basins, and dams
d. Installing simple wooden control structures
e. Cleaning water courses
f. Repair/placement of pipelines
f. Aerial and ground seeding
g. Construction of trafficable crossings
h. Dust control measures
i. Repair of maneuver trails, access and maintenance roads, and tank roads
j. Repair of sinkholes
k. Brush clearing/tree pruning for Threatened and Endangered Species (TES) maintenance and to meet training requirements
l. Constructing and maintaining roads and trails for training purposes.
m. Engineer designs, plans, and studies for land rehabilitation and maintenance in technical English and
German.
n. Land and Watershed Management (including vegetation clearing, tree pruning, and invasive species removal)
o. GIS – mapping, database management and database development
TASK ORDERS (TOs)
The Contractor provides proposal pricing based off Price Table described herein. Other tasks not specifically listed herein, but nonetheless related to the overall intent of the Contract and tasks described herein, shall be negotiated on a per Task Order Basis. The Contractor shall receive notice that the Government intends to award a Task Order through a Request for Proposal. The Contractor will have, at a minimum two (2) weeks notification prior to any equipment mobilization.
Unless otherwise directed by the Contracting Officer, each Task Order will be competitively bid between each successful offer for the USAG where the work will be performed. The Contractor shall submit a proposal based on the pricing submitted in the Price Table. It is important to note that the Price Table, submitted by each Contractor and accepted by the Government via Contract award, represents the maximum amount that each Contractor can bid for that particular task. If it so chooses, the Contractor may submit a price for a particular task that is less than the amount listed for the particular task in the Price Table. The Government will review each proposal submitted and determine which proposal is the best overall value for the Government based on a lowest price, technically acceptable basis.
The following types of TOs have been identified for possible execution under this contract:
C-2.1 Preparation of Work Plans for Erosion Control Work Under an individual TO, the Contractor may be asked to develop a work plan. This work may include, but is not limited to, performance of a check dam and/or retention basin survey (determining the need for check dams/retention basins), design of check dams and/or retention basins, torrent structures, placement of pipelines, or any other erosion control measures deemed appropriate. The TO will specify work plan requirements, including the identification of sites to be evaluated, distribution of the document, format, etc.
C-2.2 Protecting/Repairing Eroded Areas Under an individual TO the Contractor may be required to correct or improve problem areas in the training areas where erosion has occurred or where there is danger that this could occur in the future. Actions that could be requested include re-contouring terrain through the movement of soil in or adjacent to the site or the addition of material supplied from off-site; compacting these areas; placing topsoil; and/or seeding. In areas where it has been determined that protection measures are required or where the existing measures have failed, the Contractor may also be required to install and secure erosion control mats, place quarry rock, or perform other erosion control measures deemed appropriate. Some repair of maneuver trails, service roads, and/or tank roads may be required in order to redirect vehicular traffic away from areas that are subject to erosion.
C-2.3 Repairing/Constructing Check Dams/Retention Basins/Dams Based on information obtained from the check dams, retention basins and/or dams survey (or from dam inspections) the Contractor may be requested to correct the identified deficiencies. This work could include erosion repair; re-contouring and strengthening areas where settlement has occurred; replacement of broken end culverts at check dam, retention basin, and/or dam structures; clearing clogged drainage pipes; removal of vegetation (small trees etc.); refilling holes created by small animals, training exercises, or any other repair work deemed appropriate.
Shall the need be identified, new check dams, retention basin, and/or dams could be constructed under this contract.
In this instance, soils investigations, physical testing and any design analysis required for this structure would typically be performed under a separate contract. Line items from this contract would then be used to construct the check dam, retention basin, and/or dams. Examples of typical check dams are included as Figures 1A and 1B.
C-2.4 Install Simple Wooden Structures To restrict the flow of water the Contractor may be requested to install wooden control structures such as torrent structures. Example diagrams of torrent structures are attached as Figures 2A and 2B.
C-2.5 Cleaning Watercourses Work required of a Contractor under an individual TO could include the removal of sediment, debris, small trees, etc., along water courses (typically within 10-year high water limits) in order to assure the unimpeded flow of water.
C-2.6 Repair/Placement of Pipelines Short stretches of pipeline may need to be replaced or installed in order to direct water in a manner that will reduce erosive forces. This could include installation of pipelines under roadways. Typically, feasibility studies would not be included in this contract. This contract will only be used to install the desired structures.
C-2.7 Aerial Seeding In instances where large areas need to be seeded this may be accomplished through aerial seeding with a aircraft.
Specific details regarding aerial seeding are included in Appendix A. Work required of an individual contractor would include the use of a plane to perform aerial seeding, to be priced on a per hour basis (flight time only), with a minimum of 3 hours usage per task to include flight time to and from a local airport.
C-2.8 Trafficable Crossings Trafficable crossings are constructed to provide accessible vehicular crossings of low areas, typically valleys.
C-2.9 Dust Control The Contractor shall apply dust control in areas specified under an individual T.O. The application of dust control chemicals is performed to reduce the raising of dust along roads, thereby reducing potential for decreased visibility of military vehicles.
C-2.10 Maneuver Trails This contract may be used to construct maneuver trails. Maneuver trails are typically 3-5m in width, topped with limestone gravel and considered, if not temporary, certainly ephemeral in that when no longer required, they are no longer maintained. Maneuver trails are constructed to control the movement of traffic to reduce erosion within the training area.
C-2.11 Access Roads This contract may be used to construct access roads. Access roads are typically 5-9m in width.
C-2.12 Repair of Sinkholes This contract may be used to repair sinkholes. Repair of sinkholes is performed to eliminate safety hazards.
Sinkholes may develop during heavy rain events or for other reasons. Repair work may include, but is not limited to:
Replacement of failing standpipe(s) of a check dam Repair of eroded ditch(s) Removing vegetation Creating slopes Creating Berms Repair of gullies Removal of soil Backfilling Placement of rock dams Construction of a ditch Sludge removal
C-2.13 Brush Clearing/Tree Pruning for Threatened and Endangered Species (TES) Maintenance This contract may be used to provide selective management of certain plant species to aid in erosion control and soldier safety. Certain invasive plants either out-compete or inhibit the growth of native herbaceous plants that are beneficial in helping to control soil erosion. Other invasive plants may pose severe safety threats to those using the training area and must be removed in a timely basis.
C-2.14 Survey Work
This contract may be used to perform vertical control surveying work and topographical surveys. Vertical control surveys are performed to ensure that construction or repair work on culverts and torrent control structures are at the correct height and that water flow upstream and downstream of these structures is satisfactory. Topographic surveys may be performed at existing check dams to evaluate the retention capacity of those structures for further analysis.
C-2.15 UXO Avoidance Using Magnetometer Sweep. This contract may be used to perform unexploded ordinances (UXO) avoidance using a magnetometer sweep. This includes labor for the equipment operator, all mobilization and demobilizations costs, and use of UXO avoidance equipment. The equipment shall have a minimum depth sensitivity of 3 meters for all soil types.
C-2.16 Land Rehabilitation and Maintenance (LRAM). LRAM is a preventive and corrective land rehabilitation and maintenance program that reduces the long-term impacts of training and testing on installation lands. LRAM primary function is to maintain land to ensure its accessibility, capacity and capability to support the training mission. It mitigates mission and training and testing effects by combining preventive and corrective land rehabilitation, repair, and/or maintenance Best Management Practices to reduce the impacts of training and testing on an installation. It includes training area redesign and/or reconfiguration to meet training requirements and must always be completed in coordination with the local Integrated Training Area Management (ITAM) program.
C-2.17 Tank Roads Repair. Tank roads are the main roads used for transporting all mission-related vehicles to and from the training area. Proper maintenance and repair of tank roads is essential for ensuring that U.S. Army units are able to transport heavy equipment to and from position areas, maneuver trails, and shooting ranges. Tank roads typically must be 10-20 m wide and shall be graveled or paved and may be hardened with asphalt.
C-2.18 – Natural Resources Management Actions. These actions assist with carrying out a program of planning for, and the development of, maintenance, and coordination of natural resources related services. This includes fauna habitat improvements or modification, range (or training area) rehabilitation where necessary for support of protected species, and generally supporting the execution of the Integrated Natural Resources Management Plan (INRMP). This also includes prevention and control of invasive species in accordance with the INRMP and EO 13112, Invasive Species/ DoDI 4715.03 and 4150.07 . Specific actions include the detection and response to eradicate or control populations of invasive species along with monitoring the results. More specifically, natural resources management actions include, but are not limited to:
Using a global positioning system (GPS) with sub-meter accuracy, conduct mapping of the occurrence of invasive species. This effort shall also provide geographical representations of invasive species control efforts that may be tracked over time as part of an overall invasive species monitoring program. The Contractor shall follow the most current Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE). The latest data management requirements within the Department of Defense dictate that geospatial data included in projects deliverables is standardized to insure compatibility with GIS and CADD systems. This includes data used for both military operations and public works. All geospatial data submitted as part of a U.S. government contract must be compatible with the SDSFIE, formerly known as the Tri-Service Spatial Data Standards, as well as all applicable Federal Geographic Data Committee (FGDC) standards.
SDSFIE terminology shall correspond to ESRI terminology using the following format:
Entity Set = geodatabase --- eg.<buildings.gdb> Feature Data Set = ‘feature data set’ (ESRI)-----------------eg.<buildings> Feature Class Name = ‘feature class’ (ESRI)------------eg.<structure_existing_site>
There may be circumstances in which SDSFIE and/or FGDC compliance cannot be maintained. In such circumstances, proposed deviations from the standard must be communicated by the contractor and reviewed by the government.
Several protected bat species inhabit buildings in historic villages in training areas. In order to maintain the buildings as suitable habitat for bats minor improvements or repairs to the buildings are required. This effort includes providing improved or maintaining access for personnel by installing or repairing infrastructure that provides access to the building. This may include such items as a removable ladder and platform, steps into the building, or doors. Also, gaps in wooden window frames shall be sealed and owl ingress prevention devices shall be maintained or installed.
Access to and from a cellar locations is required to maintain bat roost habitat. Efforts include, but are not limited to: stone-in-concrete repairs of existing walls and loose stones at entrance areas to the bat roosts, using a mini excavator that is able to access the cellars (e.g., able to move over rough terrain) along with the use of a conveyor belt to transport debris out of the target cellar, after access is acquired, the existing cellar location will be repaired, if required, by repairing masonry work with existing original stone material (“Bruchsteine”) and removing loose material and fixing/renewing failing or missing joints.
Improving access to bat roosts for bats by cleaning existing trenches using equipment or cleaning by hand.
This effort also includes profiling the existing ditch/depression so that water is directed from the cellar sites to ensure dry conditions of cellar floor.
Various types of camera/monitoring systems are used to monitor TES species and their habitats. As described within an individual Task Order, specified monitoring equipment will be procured by the Contractor and installed at designated location(s). Examples include, but are not limited to; remotely controlled video cameras, scouting/trail/game cameras, the associated power supplies and data storage devices. Additionally, this equipment shall be maintained as described within an individual Task Order.
This effort may include maintaining the camera devices, the solar panels, the battery banks, the wiring associated with the system and any other electronic equipment and associated mounting or housing for the system. Downloading and providing data to the appropriate point of contact designated within the individual Task Order may also be required.
As described within an individual Task Order, bird and bat nesting boxes will be inspected for appropriate maintenance actions. Appropriate maintenance actions includes cleaning out and, if required, repairing the boxes. Some boxes will not be repairable and will require replacement. Separate Price Table Line Items will be utilized to replace and install boxes. At each box site, the number of and species of animal using that box will be recorded.
Maintenance of historic orchards is required to maintain specific varieties of fruit trees. Within individual
Task Order, specified orchards will require the following efforts: mowing of open areas within the orchards to reduce grasses and weeds; pruning of individual trees (may be designated within the Task Order to prune in manner to obtain viable tree scions) and watering stressed or newly planted trees.
Collection of scions from historic fruit trees is required to maintain certain historic fruit tree varieties.
Older aged trees are pruned in manner to encourage viable scions for future collections. The scions from these trees will be removed by a senior biologist (botanist preferred). Before scions are collected, the senior biologist shall coordinate the selection of which trees will have scions removed with the appropriate personnel at the garrison environmental office. After the scions are collected they will prepare the scions for transport and storage and then provided to the tree nursery.
Documentation of management actions taken using a GPS and providing digital maps and a report of all work completed along with recommendations of work to be completed in the future as a result of the present management actions (employing adaptive management). The Contractor shall follow the most current Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE). The latest data management requirements within the Department of Defense dictate that geospatial data included in projects deliverables is standardized to insure compatibility with GIS and CADD systems. This includes data used for both military operations and public works. All geospatial data submitted as part of a U.S.
government contract must be compatible with the SDSFIE, formerly known as the Tri-Service Spatial Data Standards, as well as all applicable Federal Geographic Data Committee (FGDC) standards.
SDSFIE terminology shall correspond to ESRI terminology using the following format:
Entity Set = geodatabase --- eg.<buildings.gdb> Feature Data Set = ‘feature data set’ (ESRI)-----------------eg.<buildings>
Feature Class Name = ‘feature class’ (ESRI)------------eg.<structure_existing_site>
There may be circumstances in which SDSFIE and/or FGDC compliance cannot be maintained. In such circumstances, proposed deviations from the standard must be communicated by the contractor and reviewed by the government.
TASK ORDER EXECUTION
C-3.1 Request for Proposal (RFP) As each project is identified for execution under this contract, the Contractor will be notified by an RFP letter. Each RFP letter will contain the project title, project location, scope of work, and schedule for submittal of Contractor’s proposal for that TO.
C-3.2 Task Order Scopes of Work An RFP under this contract will include a site or project specific scope of work. Scopes will vary in detail but will provide an adequate description of the actual services required to allow suitable negotiations. Typically the individual TO will provide the Contractor with the location, description of work, and schedule of execution. When applicable, the quantities of a particular item that is required will be stated. As attachments to the scope, the Government will provide, as necessary, a map showing the location of the required work, access route to that work, any drawing details which further clarify the work effort and any additional applicable project background information.
C-3.3 Task Order Requirements Additional specific requirements will be identified with the RFP and the related site-specific scope of work. Some of the more common requirements are discussed below:
Time Schedule: The Contractor shall be required to commence work required by a TO within the time specified on that TO. The Contractor shall perform the work and complete the entire project not later than the completion time specified in the TO. Any order issued during the effective period of this contract and not completed within that time period (i.e., prior to expiration of the base or option year of the contract) shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the effective period of the contract.
Approvals: As required under the TO, the Contractor shall receive approval from the Contracting Officer or Contracting Officer’s Representative (COR) on all site specific plans (such as work plans) prior to initiating any on-site activity and prior to any new/next phase of planned or scheduled work.
Cost Proposals: The Price Table in this contract will be used as a basis for developing cost proposals, negotiating and coming to an agreed-upon cost for the required work under a TO.
Notifications: The Contractor is reminded that neither he nor any of his sub-contractors are to accept direction or to proceed with any activity that is outside the scope of any particular TO without the written authority of the Contracting Officer. Upon completion of a TO, the Contractor shall notify the Contracting Officer or COR.
Limitations: TOs are limited to $1,000,000 each with a maximum total contract limit of $8,500,000.
Approximately $1,700,000 will be utilized per year for the base and each of the four option years, totaling five years performance. Other than this, there is no limit to the number and size of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations. If, due to the scheduling needs, the Contractor has multiple TOs underway simultaneously; the Contractor shall complete all orders within the schedule allowed. The Government reserves the right to divert the Contractor to work on TOs of higher priority. In such cases, time extensions will be granted for completion of TOs that have been delayed because of Government actions.
C-3.4 Performance Standards Performance standards will be identified for each TO and shall be specific to the type of work being executed under that TO.
GENERAL REQUIREMENTS.
C-4.1 Point of Contact The Government will name a point of contact (POC) at the award of a TO. The Contractor shall supply a single point of contact for this contract upon award of the base contract.
C-4.2 Public Disclosures The Contractor shall make no public announcements or disclosures to a third party,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .