C-05 _BID_SCHEDULE_STUTTGART_EROSION_CONTROL_NAT_RES_.xlsx
XLSX spreadsheet 4 MB Posted
- Solicitation number
- W912GB-13-R-0022
About this file
Bid Schedule Stuttgart Erosion Control Natural Resources Contract
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| STUTTGART BID SCHEDULE |
| SUMMARY OF CONTRACTOR'S PROPOSAL |
| CONTRACTOR: |
| POC (NAME, PHONE, EMAIL): |
| EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES BASE CONTRACT | |
| Currency: Euro | |
| SUMMARY OF ESTIMATED FEE | |
| DESCRIPTION OF SERVICES | COST BREAKDOWN |
| Euro (€) |
| STUTTGART | STUTTGART Price Table Line Items Total |
| BASE YEAR | |
| Option Year 1 | |
| Option Year 2 | |
| Option Year 3 | |
| Option Year 4 | |
| BASE YEAR and 4 option years TOTAL in EUROS |
STUTTGART - BASE YEAR
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES BASE CONTRACT
| BASE YEAR | ||||
| Price Table Line Item | UNIT | ESTIMATED QUANTITY | UNIT PRICE | AMOUNT (EURO) |
| Price Table Line Item 0001: Leveling of Terrain | SM | 1000 | ||
| Price Table Line Item 0002: Harrow to Roughen Terrain | SM | 1000 | ||
| Price Table Line Item 0003: Tiller to Loosen Terrain | ||||
| Price Table Line Item 0003 AA: loosen and till soil (classes 1 through 3) up to a depth of 100 cm. | SM | 1000 | ||
| Price Table Line Item 0003 AB: loosen and till soil (classes 1 through 3) up to a depth of 10 cm. | SM | 1000 | ||
| Price Table Line Item 0004. Refuse Clearing | ||||
| Price Table Line Item 0004 AA: Refuse Clearing up to a 5 ton dump truck capacity with disposal < 10 km. | EA | 100 | ||
| Price Table Line Item 0004 AB: Refuse Clearing up to a 5 ton dump truck capacity with disposal >10 AND < 25 km. | EA | 120 | ||
| Price Table Line Item 0005: Seeding | ||||
| Price Table Line Item 0005 AA: Seeding with RSM 7.2.1/RSM 7.1.1 for Hohenfels | NA | |||
| Price Table Line Item 0005AB: Seeding with Aerial Seed Mix for Hohenfels | NA | |||
| Price Table Line Item 0005 AC: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0005 AD: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0006. Erosion Control Mats | SM | 600 | ||
| Price Table Line Item 0007. Install Rocks | ||||
| Price Table Line Item 0007 AA: Install rocks, within 10 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AB: Install rocks, within 17.5 kilometers | CZ | 400 | ||
| Price Table Line Item 0007 AC: Install rocks, within 25 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AD: Install rocks, within 45 kilometers | CZ | 50 | ||
| Price Table Line Item 0007 AE: Install rocks, Contractor supplied and delivered | CZ | 50 | ||
| Price Table Line Item 0008: Install Stones | ||||
| Price Table Line Item 0008 AA: Install Contractor Supplied Stones by Hand | CZ | 100 | ||
| Price Table Line Item 0008 AB: Install Contractor Supplied Stones Mechanically | CZ | 100 | ||
| Price Table Line Item 0008 AC: Supply Stones (Bearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AD: Supply Stone (Wearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AE: Supply Stones (Bearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0008 AF: Supply Stone (Wearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0009. Torrent Structures | ||||
| Price Table Line Item 0009 AA: Torrent Structure, 9-meter length, 1 meter high | MT | 4 | ||
| Price Table Line Item 0009 AB: Torrent Structure, 1 meter high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0009 AC: Torrent Structure, 9 meter length, 2 meter high | MT | 4 | ||
| Price Table Line Item 0009 AD: Torrent Structure, 2 meters high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0010: Pump | ||||
| Price Table Line Item 0010 AA: Pump Water, 3 - 6 liters/sec, 5 - 7 meter head | DY | 5 | ||
| Price Table Line Item 0010 AB: Pump Water, 10 liters/sec, 5 - 7 meter head | DY | 30 | ||
| Price Table Line Item 0010 AC: Pump Slurry | CZ | 100 | ||
| Price Table Line Item 0011: Cleaning of Trenches | SM | 200 | ||
| Price Table Line Item 0012: Excavator for both non-wetland and wetland areas | ||||
| Price Table Line Item 0012AA: Excavator for Non-wetland Areas (1 DAY) | DY | 15 | ||
| Price Table Line Item 0012AB: Excavator for Non-wetland Areas (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AC: Wetland Tracked Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AD: Wetland Tracked Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AE: Small Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AF: Small Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AG: Medium Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AH: Medium Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AI: Large Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AJ: Large Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0013: Pipe Flushing truck | DY | 5 | ||
| Price Table Line Item 0014: Lifting Platform | DY | 3 | ||
| Price Table Line Item 0015 Mulchers | ||||
| Price Table Line Item 0015 AA: Small Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AB: Small Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AC: Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AD: Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AE: High Performance Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AF: High Performance Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0016 Dozer | ||||
| Price Table Line Item 0016 AA: 60-69HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AB: 60-69HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AC: 70-79HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AD: 70-79HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AE: 80-89HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AF: 80-89HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AG: 90-100HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AH: 90-100HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0017 Crane | ||||
| Price Table Line Item 0017 AA: 5,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AB: 5,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AC: 8,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AD: 8,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AE: 18,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AF: 18,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AG: 30,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AH: 30,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0018 Cherry Picker (Articulating Boom Lift) | ||||
| Price Table Line Item 0018 AA: 1-10m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AB: 1-10m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0018 AC: 11-20m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AD: 11-20m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0019 Truck, Stake Bed | ||||
| Price Table Line Item 0019 AA: Truck, Stake Bed 12’-16’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AB: Truck, Stake Bed 12’-16’ (1 week) | WK | 5 | ||
| Price Table Line Item 0019 AC: Truck, Stake Bed 20’-24’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AD: Truck, Stake Bed 20’-24’ (1 week) | WK | 5 | ||
| Price Table Line Item 0020 Conveyor Belt | ||||
| Price Table Line Item 0020 AA: Conveyor belt (1 day) | DY | 20 | ||
| Price Table Line Item 0020 AB: Conveyor Belt (1 week) | WK | 5 | ||
| Price Table Line Item 0021 Backhoe | ||||
| Price Table Line Item 0021 AA Kubota L35. (1 DAY) | DY | 20 | ||
| Price Table Line Item 0021 AB Kubota L35. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AC 580 Standard Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AD 580 Standard Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AE 590 Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AF 590 Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0022 Dump Truck | ||||
| Price Table Line Item 0022 AA: Dump Truck (1 day) | DY | 20 | ||
| Price Table Line Item 0022 AB: Dump Truck (1 week) | WK | 5 | ||
| Price Table Line Item 0023 Tractor PTO and Brush Clearing Attachments | ||||
| Price Table Line Item 0023 AA: Small Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AB: Small Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AC: Medium Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AD: Medium Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AE: Large Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AF: Large Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AG: Small Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AH: Small Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AI: Medium Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AJ: Medium Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AK: Large Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AL: Large Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0024 Push Mower | ||||
| Price Table Line Item 0024 AA: Push Mower (1 day) | DY | 20 | ||
| Price Table Line Item 0024 AB: Push Mower (1 week) | WK | 5 | ||
| Price Table Line Item 0025 Amphibious weed Cutter | ||||
| Price Table Line Item 0025 AA: Amphibious Weed Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0025 AB: Amphibious Weed Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0026 Walking Excavator | ||||
| Price Table Line Item 0026 AA: Walking Excavator (1 day) | DY | 20 | ||
| Price Table Line Item 0026 AB: Walking Excavator (1 week) | WK | 5 | ||
| Price Table Line Item 0027 Survey Work | ||||
| Price Table Line Item 0027 AA: Survey Work | DY | 20 | ||
| Price Table Line Item 0027 AB: Survey Basin Capacity | EA | 5 | ||
| Price Table Line Item 0028 Tree/Shrub Clearing | SM | 100 | ||
| Price Table Line Item 0029 Clearing of Clogged Pipes | ||||
| Price Table Line Item 0029 AA: Clearing of Clogged Pipes, pipe length 15 meters, 200-mm diameter | EA | 5 | ||
| Price Table Line Item 0029 AB: Clearing of Clogged Pipes, 200 mm diameter, for each additional meter length | MT | 20 | ||
| Price Table Line Item 0029 AC: Clearing of Clogged Pipes, pipe length 15 meters, 300-mm diameter | EA | 5 | ||
| Price Table Line Item 0029 AD: Clearing of Clogged Pipes, 300 mm diameter, for each additional meter length | MT | 20 | ||
| Price Table Line Item 0030: Sludge Excavation | CZ | 100 | ||
| Price Table Line Item 0031: On-site Topsoil Collection | CZ | 250 | ||
| Price Table Line Item 0032: Leveling/Pre-profiling of Embankment Areas | SM | 300 | ||
| Price Table Line Item 0033: Soil Excavation (Class 1 - 7) | ||||
| Price Table Line Item 0033 AA. Excavate topsoil or soil class 1 DIN 18300 | CZ | 250 | ||
| Price Table Line Item 0033 AB. Excavate soil classes 3, 4, 5, or 6 DIN 18300 ... excavation pit is less than 200 m³. | CZ | 50 | ||
| Price Table Line Item 0033 AC. Excavate soil classes 3, 4, 5, or 6 DIN 18300 … excavation pit exceeds 200 m³. | CZ | 150 | ||
| Price Table Line Item 0033 AD. Excavate soil class 2 DIN 18300 ... excavation pit is less than 200 m³. | CZ | 25 | ||
| Price Table Line Item 0033 AE. Excavate soil class 2 DIN 18300 ... excavation pit exceeds 200 m³. | CZ | 100 | ||
| Price Table Line Item 0034: Soil Installation | ||||
| Price Table Line Item 0034 AA: Contractor supplied, Certified Clean Soil Class 2 to 4 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0034 AB: Contractor supplied, Certified Clean Soil Class 5 to 6 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0034 AC: Contractor supplied, Certified Clean Soil Class 7 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0035: Contractor Supplied, Certified Clean Topsoil | SM | 200 | ||
| Price Table Line Item 0036: Mineral Sealing Layer | ||||
| Price Table Line Item 0036 AA: 5% Clay Sealing Layer | TO | 30 | ||
| Price Table Line Item 0036 AB: 2% Clay Sealing Layer | TO | 30 | ||
| Price Table Line Item 0036 AC: Stone-Free Clay/Loam Layer | TO | 30 | ||
| Price Table Line Item 0037: Pipeline Installation | ||||
| Price Table Line Item 0037 AA: Pipeline Installation, DN 200 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AB: Additional Pipeline Installation, DN 200 | MT | 12 | ||
| Price Table Line Item 0037 AC: Pipeline Installation, DN 300 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AD: Additional Pipeline Installation, DN 300 | MT | 12 | ||
| Price Table Line Item 0037 AE: Pipeline Installation, DN 600 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AF: Additional Pipeline Installation, DN 600 | MT | 12 | ||
| Price Table Line Item 0038: Slope Head Installation | ||||
| Price Table Line Item 0038 AA: Slope Head Installation, DN 200 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0038 AB: Slope Head Installation, DN 300 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0038 AC: Slope Head Installation, DN 600 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0039: Reinforced Concrete Pipe | ||||
| Price Table Line Item 0039 AA: reinforced concrete pipes DN 300 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AB: reinforced concrete pipes DN 400 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AC: reinforced concrete pipes DN 600 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AD: reinforced concrete pipes DN 800 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AE: reinforced concrete pipes DN 1000 (DIN 4035) | MT | 30 | ||
| Price Table Line Item 0041: Embankment Head Ends | ||||
| Price Table Line Item 0041 AA: Embankment head ends DN 300 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AB: Embankment head ends DN 400 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AC: Embankment head ends DN 600 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AD: Embankment head ends DN 800 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AE: Embankment head ends DN 1000 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0042: Concrete | ||||
| Price Table Line Item 0042 AA: Stone in Concrete (Overflow Channels) | CZ | 100 | ||
| Price Table Line Item 0042 AB: Stone in Concrete (End of Pipeline) | CZ | 100 | ||
| Price Table Line Item 0042 AC: Provide Reinforced Concrete Work | CZ | 100 | ||
| Price Table Line Item 0042 AD: Provide Reinforced Concrete Joints | MT | 10 | ||
| Price Table Line Item 0043: Fleece Material (Road Construction) | SM | 150 | ||
| Price Table Line Item 0044: Concrete Shaft Ring Installation | EA | 2 | ||
| Price Table Line Item 0045: Concrete Removal/ Demolition | ||||
| Price Table Line Item 0045 AA: Concrete Pipeline Removal | EA | 30 | ||
| Price Table Line Item 0045 AB: Additional Pipeline Removal | MT | 15 | ||
| Price Table Line Item 0045 AC: Shaft Ring Removal | EA | 2 | ||
| Price Table Line Item 0045 AD: Concrete Demolition | CZ | 2 | ||
| Price Table Line Item 0046: Replace Concrete Shaft Rings | EA | 2 | ||
| Price Table Line Item 0047: Polyethylene (PE) Pipes | ||||
| Price Table Line Item 0047 AA: PE Pipes DN 300 | MT | 20 | ||
| Price Table Line Item 0047 AB: PE Pipes DN 200 | MT | 20 | ||
| Price Table Line Item 0047 AC: PE Pipes DN 400 | MT | 20 | ||
| Price Table Line Item 0048: Metal Shield separator | EA | 10 | ||
| Price Table Line Item 0049: Concrete Cut-Off Device | ||||
| Price Table Line Item 0049AA: Concrete Structure | EA | 10 | ||
| Price Table Line Item 0049AB: Gate Valve | EA | 5 | ||
| Price Table Line Item 0050: Cut-Off Devices | ||||
| Price Table Line Item 0050 AA: Cut-Off Device | EA | 5 | ||
| Price Table Line Item 0050 AB: Cut-Off Device Piping DN 200 | MT | 60 | ||
| Price Table Line Item 0050 AC: Cut-Off Device Additional Piping DN 200 | MT | 30 | ||
| Price Table Line Item 0050 AD: Cut-Off Device Piping DN 300 | MT | 30 | ||
| Price Table Line Item 0050 AE: Cut-Off Device Additional Piping DN 300 | MT | 15 | ||
| Price Table Line Item 0051: Level Control (“Monch”) Construction | EA | 5 | ||
| Price Table Line Item 0052: Light-Duty Guardrail Installation | ||||
| Price Table Line Item 0052 AA: Guardrails | MT | 50 | ||
| Price Table Line Item 0052 AB: Guardrail Ends | MT | 10 | ||
| Price Table Line Item 0053: Heavy-Duty Guardrail Installation | ||||
| Price Table Line Item 0053 AA: Guardrails | MT | 5 | ||
| Price Table Line Item 0053 AB: Guardrail Ends | MT | 10 | ||
| Price Table Line Item 0054: Asphalt Concrete | ||||
| Price Table Line Item 0054 AA: Asphalt Concrete, machine Installed. (SM) | SM | 400 | ||
| Price Table Line Item 0054 AB: Asphalt Concrete, manually Installed. (SM) | SM | 100 | ||
| Price Table Line Item 0055: Bituminous Base Course | ||||
| Price Table Line Item 0055 AA: Bituminous Base Course, Machine Installed. (SM) | SM | 400 | ||
| Price Table Line Item 0055 AA: Bituminous Base Course, Manually Installed. (SM) | SM | 100 | ||
| Price Table Line Item 0056: Aerial Seeding | ||||
| Price Table Line Item 0056 AA: Aerial Seeding; Plane per Hour: | ||||
| Price Table Line Item 0056 AB: Aerial Seeding; Helicopter per Hour: | ||||
| Price Table Line Item 0056 AC: Aerial Seeding, Ground Marking | ||||
| Price Table Line Item 0057: Dust Control | SM | 1000 | ||
| Price Table Line Item 0058 UXO Avoidance Using Magnetometer Sweep (per day) | DY | 20 | ||
| Price Table Line Item 0059: Supply Wooden Stakes (100) | LS | 5 | ||
| Price Table Line Item 0060. Install Wooden Stakes (100) | LS | 5 | ||
| Price Table Line Item 0061 Natural Resources: Open Meadow Maintenance ( with mulch machine) | SM | 150000 | ||
| Price Table Line Item 0062 Natural Resources: Vegetation Clearing (by hand) | SM | 10000 | ||
| Price Table Line Item 0063 Natural Resources: Vegetation Clearing (by hand) on Steep Rocks/Cliffs | SM | 10000 | ||
| Price Table Line Item 0064 Natural Resources: Invasive Species Control/Eradication - Mechanical treatment (hand-held equipment) | SM | 15000 | ||
| Price Table Line Item 0065 Invasive Species Control/Eradication – Chemical treatment | SM | 5000 | ||
| Price Table Line Item 0066 Bat Protection Measures – Species Protection Measures | ||||
| Price Table Line Item0066 AA: Installation of bat boxes | EA | 250 | ||
| Price Table Line Item0066 AB: Installation of a flat bat box with built-in wooden rear panel | EA | 100 | ||
| Price Table Line Item0066 AC: Installation of Bat Cave | EA | 150 | ||
| Price Table Line Item0066 AD: Installation of bat boxes with a triple front wall | EA | 100 | ||
| Price Table Line Item0066 AE: Installation of bat boxes with a gap | EA | 100 | ||
| Price Table Line Item0066 AF: Installation of a “large” bat cave | EA | 100 | ||
| Price Table Line Item0066 AG: Installation of a wooden façade bat box with a bitumen lining | EA | 100 | ||
| Price Table Line Item 0067 Installation of bat doors | EA | 3 | ||
| Price Table Line Item 0068 Limestone mortar | KG | 200 | ||
| Price Table Line Item 0069 Bird Protection Measures | ||||
| Price Table Line Item 0069 AA Installation of new Nesting Platform (osprey or sea eagle) | EA | 3 | ||
| Price Table Line Item 0069 AB Installation of new Nesting Platform (stork) | EA | 2 | ||
| Price Table Line Item 0069 AC Maintenance of Nesting Platform (osprey or sea eagle). | EA | 5 | ||
| Price Table Line Item 0069 AD Maintenance of Nesting Platform (stork). | EA | 5 | ||
| Price Table Line Item 0070 Installation of Bird Boxes | ||||
| Price Table Line Item 0070 AA Installation of boxes for smaller owls (Tengmalm’s owl (Aegolius funereus), Eurasian pygmy owl (Glaucidium passerinum), etc.). | EA | 50 | ||
| Price Table Line Item 0070 AB Installation of boxes for species in the Paridae family (Parus caeruleus, Parus cristatus, etc.). | EA | 100 | ||
| Price Table Line Item 0070 AC Installation of boxes for dippers (Cinclus cinclus) and wagtails (Motacilla spp.) | EA | 50 | ||
| Price Table Line Item 0070 AD Installation of boxes for birds such as the black redstart (Phoenicurus ochruros) and grey spotted flycatcher (Muscicapa striata) | EA | 75 | ||
| Price Table Line Item 0070 AE Installation of boxes for starlings (Sturnus vulgaris) | EA | 50 | ||
| Price Table Line Item 0070 AF Installation of boxes for species that nest in recesses or cavities. | EA | 100 | ||
| Price Table Line Item 0070 AG Installation of an open-fronted nest box. | EA | 50 | ||
| Price Table Line Item 0071 Amphibian Protection Measures | ||||
| Price Table Line Item 071 AA Installation of 50 meters of protective fence | EA | 5 | ||
| Price Table Line Item 0071 AB Installation of 100 meters of protective fence | EA | 5 | ||
| Price Table Line Item 0072 Historic Fruit Tree Preservation | ||||
| Price Table Line Item 0072 AA Planting of historic fruit trees. | EA | 75 | ||
| Price Table Line Item 0072 AB Installation of a Protection Fence. | LM | 1000 | ||
| Price Table Line Item 0072 AC Protection Fence (Individual Tree). | EA | 30 | ||
| Price Table Line Item 0073: Personnel | ||||
| Price Table Line Item 0073 AA Project Manager | HR | 100 | ||
| Price Table Line Item 0073 AB Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Senior) | HR | 200 | ||
| Price Table Line Item 0073 AC Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Mid-level) | HR | 200 | ||
| Price Table Line Item 0073 AD Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Junior) | HR | 200 | ||
| Price Table Line Item 0073 AE Environmental, Civil Engineer (Senior) | HR | 200 | ||
| Price Table Line Item 0073 AF Environmental, Civil Engineer (Mid Level) | HR | 200 | ||
| Price Table Line Item 0073 AG Environmental, Civil Engineer (Junior) | HR | 200 | ||
| Price Table Line Item 0073 AH Engineer Technician (Senior) | HR | 50 | ||
| Price Table Line Item 0073 AI Engineer Technician (Junior) | HR | 100 | ||
| Price Table Line Item 0073 AJ Skilled Laborer | HR | 50 | ||
| Price Table Line Item 0073 AK Typist (Clerical) | HR | 20 | ||
| Price Table Line Item 0073 AL Certified Surveyor Crew | HR | 50 | ||
| Price Table Line Item 0073 AM GIS Systems Manager | HR | 100 | ||
| Price Table Line Item 0073 AN GIS/CADD Operator | HR | 60 | ||
| Price Table Line Item 0073 AO Landscape Conservationist | HR | 60 | ||
| Price Table Line Item 0074: Field Density Test | EA | 20 | ||
| Price Table Line Item 0075: Compaction Test Proctor Test | EA | 5 | ||
| Price Table Line Item 0076: Laboratory Analyses | ||||
| Price Table Line Item 0076 AA: Benzene, Toluene, Ethyl Benzene, and Xylenes and Aromatic Hydrocarbons | EA | 15 | ||
| Price Table Line Item 0076 AB: Petroleum, Oil, and Lubricants | EA | 15 | ||
| Price Table Line Item 0076AC: Chlorinated Hydrocarbons | EA | 10 | ||
| Price Table Line Item 0076 AD: Poly-cyclic Aromatic Hydrocarbons | EA | 5 | ||
| Price Table Line Item 0076 AE: Calcium Chloride | EA | 5 | ||
| Price Table Line Item 0076 AF: Other Laboratory Analyses | EA | TBD | ||
| Price Table Line Item 0077: Contract Start-up | LS | 1 | ||
| Price Table Line Item 0078: Other Costs | EA | TBD |
STUTTGART - OPT YR 1
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES BASE CONTRACT
| BASE YEAR | ||||
| Price Table Line Item | UNIT | ESTIMATED QUANTITY | UNIT PRICE | AMOUNT (EURO) |
| Price Table Line Item 0001: Leveling of Terrain | SM | 1000 | ||
| Price Table Line Item 0002: Harrow to Roughen Terrain | SM | 1000 | ||
| Price Table Line Item 0003: Tiller to Loosen Terrain | ||||
| Price Table Line Item 0003 AA: loosen and till soil (classes 1 through 3) up to a depth of 100 cm. | SM | 1000 | ||
| Price Table Line Item 0003 AB: loosen and till soil (classes 1 through 3) up to a depth of 10 cm. | SM | 1000 | ||
| Price Table Line Item 0004. Refuse Clearing | ||||
| Price Table Line Item 0004 AA: Refuse Clearing up to a 5 ton dump truck capacity with disposal < 10 km. | EA | 100 | ||
| Price Table Line Item 0004 AB: Refuse Clearing up to a 5 ton dump truck capacity with disposal >10 AND < 25 km. | EA | 120 | ||
| Price Table Line Item 0005: Seeding | ||||
| Price Table Line Item 0005 AA: Seeding with RSM 7.2.1/RSM 7.1.1 for Hohenfels | NA | |||
| Price Table Line Item 0005AB: Seeding with Aerial Seed Mix for Hohenfels | NA | |||
| Price Table Line Item 0005 AC: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0005 AD: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0006. Erosion Control Mats | SM | 600 | ||
| Price Table Line Item 0007. Install Rocks | ||||
| Price Table Line Item 0007 AA: Install rocks, within 10 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AB: Install rocks, within 17.5 kilometers | CZ | 400 | ||
| Price Table Line Item 0007 AC: Install rocks, within 25 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AD: Install rocks, within 45 kilometers | CZ | 50 | ||
| Price Table Line Item 0007 AE: Install rocks, Contractor supplied and delivered | CZ | 50 | ||
| Price Table Line Item 0008: Install Stones | ||||
| Price Table Line Item 0008 AA: Install Contractor Supplied Stones by Hand | CZ | 100 | ||
| Price Table Line Item 0008 AB: Install Contractor Supplied Stones Mechanically | CZ | 100 | ||
| Price Table Line Item 0008 AC: Supply Stones (Bearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AD: Supply Stone (Wearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AE: Supply Stones (Bearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0008 AF: Supply Stone (Wearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0009. Torrent Structures | ||||
| Price Table Line Item 0009 AA: Torrent Structure, 9-meter length, 1 meter high | MT | 4 | ||
| Price Table Line Item 0009 AB: Torrent Structure, 1 meter high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0009 AC: Torrent Structure, 9 meter length, 2 meter high | MT | 4 | ||
| Price Table Line Item 0009 AD: Torrent Structure, 2 meters high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0010: Pump | ||||
| Price Table Line Item 0010 AA: Pump Water, 3 - 6 liters/sec, 5 - 7 meter head | DY | 5 | ||
| Price Table Line Item 0010 AB: Pump Water, 10 liters/sec, 5 - 7 meter head | DY | 30 | ||
| Price Table Line Item 0010 AC: Pump Slurry | CZ | 100 | ||
| Price Table Line Item 0011: Cleaning of Trenches | SM | 200 | ||
| Price Table Line Item 0012: Excavator for both non-wetland and wetland areas | ||||
| Price Table Line Item 0012AA: Excavator for Non-wetland Areas (1 DAY) | DY | 15 | ||
| Price Table Line Item 0012AB: Excavator for Non-wetland Areas (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AC: Wetland Tracked Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AD: Wetland Tracked Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AE: Small Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AF: Small Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AG: Medium Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AH: Medium Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AI: Large Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AJ: Large Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0013: Pipe Flushing truck | DY | 5 | ||
| Price Table Line Item 0014: Lifting Platform | DY | 3 | ||
| Price Table Line Item 0015 Mulchers | ||||
| Price Table Line Item 0015 AA: Small Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AB: Small Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AC: Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AD: Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AE: High Performance Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AF: High Performance Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0016 Dozer | ||||
| Price Table Line Item 0016 AA: 60-69HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AB: 60-69HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AC: 70-79HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AD: 70-79HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AE: 80-89HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AF: 80-89HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AG: 90-100HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AH: 90-100HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0017 Crane | ||||
| Price Table Line Item 0017 AA: 5,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AB: 5,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AC: 8,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AD: 8,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AE: 18,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AF: 18,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AG: 30,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AH: 30,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0018 Cherry Picker (Articulating Boom Lift) | ||||
| Price Table Line Item 0018 AA: 1-10m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AB: 1-10m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0018 AC: 11-20m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AD: 11-20m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0019 Truck, Stake Bed | ||||
| Price Table Line Item 0019 AA: Truck, Stake Bed 12’-16’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AB: Truck, Stake Bed 12’-16’ (1 week) | WK | 5 | ||
| Price Table Line Item 0019 AC: Truck, Stake Bed 20’-24’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AD: Truck, Stake Bed 20’-24’ (1 week) | WK | 5 | ||
| Price Table Line Item 0020 Conveyor Belt | ||||
| Price Table Line Item 0020 AA: Conveyor belt (1 day) | DY | 20 | ||
| Price Table Line Item 0020 AB: Conveyor Belt (1 week) | WK | 5 | ||
| Price Table Line Item 0021 Backhoe | ||||
| Price Table Line Item 0021 AA Kubota L35. (1 DAY) | DY | 20 | ||
| Price Table Line Item 0021 AB Kubota L35. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AC 580 Standard Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AD 580 Standard Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AE 590 Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AF 590 Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0022 Dump Truck | ||||
| Price Table Line Item 0022 AA: Dump Truck (1 day) | DY | 20 | ||
| Price Table Line Item 0022 AB: Dump Truck (1 week) | WK | 5 | ||
| Price Table Line Item 0023 Tractor PTO and Brush Clearing Attachments | ||||
| Price Table Line Item 0023 AA: Small Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AB: Small Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AC: Medium Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AD: Medium Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AE: Large Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AF: Large Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AG: Small Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AH: Small Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AI: Medium Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AJ: Medium Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AK: Large Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AL: Large Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0024 Push Mower | ||||
| Price Table Line Item 0024 AA: Push Mower (1 day) | DY | 20 | ||
| Price Table Line Item 0024 AB: Push Mower (1 week) | WK | 5 | ||
| Price Table Line Item 0025 Amphibious weed Cutter | ||||
| Price Table Line Item 0025 AA: Amphibious Weed Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0025 AB: Amphibious Weed Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0026 Walking Excavator | ||||
| Price Table Line Item 0026 AA: Walking Excavator (1 day) | DY | 20 | ||
| Price Table Line Item 0026 AB: Walking Excavator (1 week) | WK | 5 | ||
| Price Table Line Item 0027 Survey Work | ||||
| Price Table Line Item 0027 AA: Survey Work | DY | 20 | ||
| Price Table Line Item 0027 AB: Survey Basin Capacity | EA | 5 | ||
| Price Table Line Item 0028 Tree/Shrub Clearing | SM | 100 | ||
| Price Table Line Item 0029 Clearing of Clogged Pipes | ||||
| Price Table Line Item 0029 AA: Clearing of Clogged Pipes, pipe length 15 meters, 200-mm diameter | EA | 5 | ||
| Price Table Line Item 0029 AB: Clearing of Clogged Pipes, 200 mm diameter, for each additional meter length | MT | 20 | ||
| Price Table Line Item 0029 AC: Clearing of Clogged Pipes, pipe length 15 meters, 300-mm diameter | EA | 5 | ||
| Price Table Line Item 0029 AD: Clearing of Clogged Pipes, 300 mm diameter, for each additional meter length | MT | 20 | ||
| Price Table Line Item 0030: Sludge Excavation | CZ | 100 | ||
| Price Table Line Item 0031: On-site Topsoil Collection | CZ | 250 | ||
| Price Table Line Item 0032: Leveling/Pre-profiling of Embankment Areas | SM | 300 | ||
| Price Table Line Item 0033: Soil Excavation (Class 1 - 7) | ||||
| Price Table Line Item 0033 AA. Excavate topsoil or soil class 1 DIN 18300 | CZ | 250 | ||
| Price Table Line Item 0033 AB. Excavate soil classes 3, 4, 5, or 6 DIN 18300 ... excavation pit is less than 200 m³. | CZ | 50 | ||
| Price Table Line Item 0033 AC. Excavate soil classes 3, 4, 5, or 6 DIN 18300 … excavation pit exceeds 200 m³. | CZ | 150 | ||
| Price Table Line Item 0033 AD. Excavate soil class 2 DIN 18300 ... excavation pit is less than 200 m³. | CZ | 25 | ||
| Price Table Line Item 0033 AE. Excavate soil class 2 DIN 18300 ... excavation pit exceeds 200 m³. | CZ | 100 | ||
| Price Table Line Item 0034: Soil Installation | ||||
| Price Table Line Item 0034 AA: Contractor supplied, Certified Clean Soil Class 2 to 4 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0034 AB: Contractor supplied, Certified Clean Soil Class 5 to 6 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0034 AC: Contractor supplied, Certified Clean Soil Class 7 (DIN 18300) | CZ | 100 | ||
| Price Table Line Item 0035: Contractor Supplied, Certified Clean Topsoil | SM | 200 | ||
| Price Table Line Item 0036: Mineral Sealing Layer | ||||
| Price Table Line Item 0036 AA: 5% Clay Sealing Layer | TO | 30 | ||
| Price Table Line Item 0036 AB: 2% Clay Sealing Layer | TO | 30 | ||
| Price Table Line Item 0036 AC: Stone-Free Clay/Loam Layer | TO | 30 | ||
| Price Table Line Item 0037: Pipeline Installation | ||||
| Price Table Line Item 0037 AA: Pipeline Installation, DN 200 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AB: Additional Pipeline Installation, DN 200 | MT | 12 | ||
| Price Table Line Item 0037 AC: Pipeline Installation, DN 300 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AD: Additional Pipeline Installation, DN 300 | MT | 12 | ||
| Price Table Line Item 0037 AE: Pipeline Installation, DN 600 (IAW DIN 4032) | EA | 25 | ||
| Price Table Line Item 0037 AF: Additional Pipeline Installation, DN 600 | MT | 12 | ||
| Price Table Line Item 0038: Slope Head Installation | ||||
| Price Table Line Item 0038 AA: Slope Head Installation, DN 200 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0038 AB: Slope Head Installation, DN 300 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0038 AC: Slope Head Installation, DN 600 (IAW DIN 4032) | EA | 2 | ||
| Price Table Line Item 0039: Reinforced Concrete Pipe | ||||
| Price Table Line Item 0039 AA: reinforced concrete pipes DN 300 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AB: reinforced concrete pipes DN 400 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AC: reinforced concrete pipes DN 600 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AD: reinforced concrete pipes DN 800 (DIN 4035) | MT | 20 | ||
| Price Table Line Item 0039 AE: reinforced concrete pipes DN 1000 (DIN 4035) | MT | 30 | ||
| Price Table Line Item 0041: Embankment Head Ends | ||||
| Price Table Line Item 0041 AA: Embankment head ends DN 300 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AB: Embankment head ends DN 400 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AC: Embankment head ends DN 600 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AD: Embankment head ends DN 800 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0041 AE: Embankment head ends DN 1000 (DIN 4035) | EA | 2 | ||
| Price Table Line Item 0042: Concrete | ||||
| Price Table Line Item 0042 AA: Stone in Concrete (Overflow Channels) | CZ | 100 | ||
| Price Table Line Item 0042 AB: Stone in Concrete (End of Pipeline) | CZ | 100 | ||
| Price Table Line Item 0042 AC: Provide Reinforced Concrete Work | CZ | 100 | ||
| Price Table Line Item 0042 AD: Provide Reinforced Concrete Joints | MT | 10 | ||
| Price Table Line Item 0043: Fleece Material (Road Construction) | SM | 150 | ||
| Price Table Line Item 0044: Concrete Shaft Ring Installation | EA | 2 | ||
| Price Table Line Item 0045: Concrete Removal/ Demolition | ||||
| Price Table Line Item 0045 AA: Concrete Pipeline Removal | EA | 30 | ||
| Price Table Line Item 0045 AB: Additional Pipeline Removal | MT | 15 | ||
| Price Table Line Item 0045 AC: Shaft Ring Removal | EA | 2 | ||
| Price Table Line Item 0045 AD: Concrete Demolition | CZ | 2 | ||
| Price Table Line Item 0046: Replace Concrete Shaft Rings | EA | 2 | ||
| Price Table Line Item 0047: Polyethylene (PE) Pipes | ||||
| Price Table Line Item 0047 AA: PE Pipes DN 300 | MT | 20 | ||
| Price Table Line Item 0047 AB: PE Pipes DN 200 | MT | 20 | ||
| Price Table Line Item 0047 AC: PE Pipes DN 400 | MT | 20 | ||
| Price Table Line Item 0048: Metal Shield separator | EA | 10 | ||
| Price Table Line Item 0049: Concrete Cut-Off Device | ||||
| Price Table Line Item 0049AA: Concrete Structure | EA | 10 | ||
| Price Table Line Item 0049AB: Gate Valve | EA | 5 | ||
| Price Table Line Item 0050: Cut-Off Devices | ||||
| Price Table Line Item 0050 AA: Cut-Off Device | EA | 5 | ||
| Price Table Line Item 0050 AB: Cut-Off Device Piping DN 200 | MT | 60 | ||
| Price Table Line Item 0050 AC: Cut-Off Device Additional Piping DN 200 | MT | 30 | ||
| Price Table Line Item 0050 AD: Cut-Off Device Piping DN 300 | MT | 30 | ||
| Price Table Line Item 0050 AE: Cut-Off Device Additional Piping DN 300 | MT | 15 | ||
| Price Table Line Item 0051: Level Control (“Monch”) Construction | EA | 5 | ||
| Price Table Line Item 0052: Light-Duty Guardrail Installation | ||||
| Price Table Line Item 0052 AA: Guardrails | MT | 50 | ||
| Price Table Line Item 0052 AB: Guardrail Ends | MT | 10 | ||
| Price Table Line Item 0053: Heavy-Duty Guardrail Installation | ||||
| Price Table Line Item 0053 AA: Guardrails | MT | 5 | ||
| Price Table Line Item 0053 AB: Guardrail Ends | MT | 10 | ||
| Price Table Line Item 0054: Asphalt Concrete | ||||
| Price Table Line Item 0054 AA: Asphalt Concrete, machine Installed. (SM) | SM | 400 | ||
| Price Table Line Item 0054 AB: Asphalt Concrete, manually Installed. (SM) | SM | 100 | ||
| Price Table Line Item 0055: Bituminous Base Course | ||||
| Price Table Line Item 0055 AA: Bituminous Base Course, Machine Installed. (SM) | SM | 400 | ||
| Price Table Line Item 0055 AA: Bituminous Base Course, Manually Installed. (SM) | SM | 100 | ||
| Price Table Line Item 0056: Aerial Seeding | ||||
| Price Table Line Item 0056 AA: Aerial Seeding; Plane per Hour: | ||||
| Price Table Line Item 0056 AB: Aerial Seeding; Helicopter per Hour: | ||||
| Price Table Line Item 0056 AC: Aerial Seeding, Ground Marking | ||||
| Price Table Line Item 0057: Dust Control | SM | 1000 | ||
| Price Table Line Item 0058 UXO Avoidance Using Magnetometer Sweep (per day) | DY | 20 | ||
| Price Table Line Item 0059: Supply Wooden Stakes (100) | LS | 5 | ||
| Price Table Line Item 0060. Install Wooden Stakes (100) | LS | 5 | ||
| Price Table Line Item 0061 Natural Resources: Open Meadow Maintenance ( with mulch machine) | SM | 150000 | ||
| Price Table Line Item 0062 Natural Resources: Vegetation Clearing (by hand) | SM | 10000 | ||
| Price Table Line Item 0063 Natural Resources: Vegetation Clearing (by hand) on Steep Rocks/Cliffs | SM | 10000 | ||
| Price Table Line Item 0064 Natural Resources: Invasive Species Control/Eradication - Mechanical treatment (hand-held equipment) | SM | 15000 | ||
| Price Table Line Item 0065 Invasive Species Control/Eradication – Chemical treatment | SM | 5000 | ||
| Price Table Line Item 0066 Bat Protection Measures – Species Protection Measures | ||||
| Price Table Line Item 0066 AA: Installation of bat boxes | EA | 250 | ||
| Price Table Line Item 0066 AB: Installation of a flat bat box with built-in wooden rear panel | EA | 100 | ||
| Price Table Line Item 0066 AC: Installation of Bat Cave | EA | 150 | ||
| Price Table Line Item 0066 AD: Installation of bat boxes with a triple front wall | EA | 100 | ||
| Price Table Line Item 0066 AE: Installation of bat boxes with a gap | EA | 100 | ||
| Price Table Line Item 0066 AF: Installation of a “large” bat cave | EA | 100 | ||
| Price Table Line Item 0066 AG: Installation of a wooden façade bat box with a bitumen lining | EA | 100 | ||
| Price Table Line Item 0067 Installation of bat doors | EA | 3 | ||
| Price Table Line Item 0068 Limestone mortar | KG | 200 | ||
| Price Table Line Item 0069 Bird Protection Measures | ||||
| Price Table Line Item 0069 AA Installation of new Nesting Platform (osprey or sea eagle) | EA | 3 | ||
| Price Table Line Item 0069 AB Installation of new Nesting Platform (stork) | EA | 2 | ||
| Price Table Line Item 0069 AC Maintenance of Nesting Platform (osprey or sea eagle). | EA | 5 | ||
| Price Table Line Item 0069 AD Maintenance of Nesting Platform (stork). | EA | 5 | ||
| Price Table Line Item 0070 Installation of Bird Boxes | ||||
| Price Table Line Item 0070 AA Installation of boxes for smaller owls (Tengmalm’s owl (Aegolius funereus), Eurasian pygmy owl (Glaucidium passerinum), etc.). | EA | 50 | ||
| Price Table Line Item 0070 AB Installation of boxes for species in the Paridae family (Parus caeruleus, Parus cristatus, etc.). | EA | 100 | ||
| Price Table Line Item 0070 AC Installation of boxes for dippers (Cinclus cinclus) and wagtails (Motacilla spp.) | EA | 50 | ||
| Price Table Line Item 0070 AD Installation of boxes for birds such as the black redstart (Phoenicurus ochruros) and grey spotted flycatcher (Muscicapa striata) | EA | 75 | ||
| Price Table Line Item 0070 AE Installation of boxes for starlings (Sturnus vulgaris) | EA | 50 | ||
| Price Table Line Item 0070 AF Installation of boxes for species that nest in recesses or cavities. | EA | 100 | ||
| Price Table Line Item 0070 AG Installation of an open-fronted nest box. | EA | 50 | ||
| Price Table Line Item 0071 Amphibian Protection Measures | ||||
| Price Table Line Item 071 AA Installation of 50 meters of protective fence | EA | 5 | ||
| Price Table Line Item 0071 AB Installation of 100 meters of protective fence | EA | 5 | ||
| Price Table Line Item 0072 Historic Fruit Tree Preservation | ||||
| Price Table Line Item 0072 AA Planting of historic fruit trees. | EA | 75 | ||
| Price Table Line Item 0072 AB Installation of a Protection Fence. | LM | 1000 | ||
| Price Table Line Item 0072 AC Protection Fence (Individual Tree). | EA | 30 | ||
| Price Table Line Item 0073: Personnel | ||||
| Price Table Line Item 0073 AA Project Manager | HR | 100 | ||
| Price Table Line Item 0073 AB Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Senior) | HR | 200 | ||
| Price Table Line Item 0073 AC Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Mid-level) | HR | 200 | ||
| Price Table Line Item 0073 AD Chemist, Geologist, Biologist, Hydrologist, Environmental Scientist (Junior) | HR | 200 | ||
| Price Table Line Item 0073 AE Environmental, Civil Engineer (Senior) | HR | 200 | ||
| Price Table Line Item 0073 AF Environmental, Civil Engineer (Mid Level) | HR | 200 | ||
| Price Table Line Item 0073 AG Environmental, Civil Engineer (Junior) | HR | 200 | ||
| Price Table Line Item 0073 AH Engineer Technician (Senior) | HR | 50 | ||
| Price Table Line Item 0073 AI Engineer Technician (Junior) | HR | 100 | ||
| Price Table Line Item 0073 AJ Skilled Laborer | HR | 50 | ||
| Price Table Line Item 0073 AK Typist (Clerical) | HR | 20 | ||
| Price Table Line Item 0073 AL Certified Surveyor Crew | HR | 50 | ||
| Price Table Line Item 0073 AM GIS Systems Manager | HR | 100 | ||
| Price Table Line Item 0073 AN GIS/CADD Operator | HR | 60 | ||
| Price Table Line Item 0073 AO Landscape Conservationist | HR | 60 | ||
| Price Table Line Item 0074: Field Density Test | EA | 20 | ||
| Price Table Line Item 0075: Compaction Test Proctor Test | EA | 5 | ||
| Price Table Line Item 0076: Laboratory Analyses | ||||
| Price Table Line Item 0076 AA: Benzene, Toluene, Ethyl Benzene, and Xylenes and Aromatic Hydrocarbons | EA | 15 | ||
| Price Table Line Item 0076 AB: Petroleum, Oil, and Lubricants | EA | 15 | ||
| Price Table Line Item 0076AC: Chlorinated Hydrocarbons | EA | 10 | ||
| Price Table Line Item 0076 AD: Poly-cyclic Aromatic Hydrocarbons | EA | 5 | ||
| Price Table Line Item 0076 AE: Calcium Chloride | EA | 5 | ||
| Price Table Line Item 0076 AF: Other Laboratory Analyses | EA | TBD | ||
| Price Table Line Item 0077: Contract Start-up | LS | 1 | ||
| Price Table Line Item 0078: Other Costs | EA | TBD |
STUTTGART - OPT YR 2
EROSION PREVENTION/DUST CONTROL AND NATURAL RESOURCE PROTECTION SERVICES BASE CONTRACT
| BASE YEAR | ||||
| Price Table Line Item | UNIT | ESTIMATED QUANTITY | UNIT PRICE | AMOUNT (EURO) |
| Price Table Line Item 0001: Leveling of Terrain | SM | 1000 | ||
| Price Table Line Item 0002: Harrow to Roughen Terrain | SM | 1000 | ||
| Price Table Line Item 0003: Tiller to Loosen Terrain | ||||
| Price Table Line Item 0003 AA: loosen and till soil (classes 1 through 3) up to a depth of 100 cm. | SM | 1000 | ||
| Price Table Line Item 0003 AB: loosen and till soil (classes 1 through 3) up to a depth of 10 cm. | SM | 1000 | ||
| Price Table Line Item 0004. Refuse Clearing | ||||
| Price Table Line Item 0004 AA: Refuse Clearing up to a 5 ton dump truck capacity with disposal < 10 km. | EA | 100 | ||
| Price Table Line Item 0004 AB: Refuse Clearing up to a 5 ton dump truck capacity with disposal >10 AND < 25 km. | EA | 120 | ||
| Price Table Line Item 0005: Seeding | ||||
| Price Table Line Item 0005 AA: Seeding with RSM 7.2.1/RSM 7.1.1 for Hohenfels | NA | |||
| Price Table Line Item 0005AB: Seeding with Aerial Seed Mix for Hohenfels | NA | |||
| Price Table Line Item 0005 AC: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0005 AD: Seeding with Seed Mix for Grafenwoehr | NA | |||
| Price Table Line Item 0006. Erosion Control Mats | SM | 600 | ||
| Price Table Line Item 0007. Install Rocks | ||||
| Price Table Line Item 0007 AA: Install rocks, within 10 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AB: Install rocks, within 17.5 kilometers | CZ | 400 | ||
| Price Table Line Item 0007 AC: Install rocks, within 25 kilometers | CZ | 300 | ||
| Price Table Line Item 0007 AD: Install rocks, within 45 kilometers | CZ | 50 | ||
| Price Table Line Item 0007 AE: Install rocks, Contractor supplied and delivered | CZ | 50 | ||
| Price Table Line Item 0008: Install Stones | ||||
| Price Table Line Item 0008 AA: Install Contractor Supplied Stones by Hand | CZ | 100 | ||
| Price Table Line Item 0008 AB: Install Contractor Supplied Stones Mechanically | CZ | 100 | ||
| Price Table Line Item 0008 AC: Supply Stones (Bearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AD: Supply Stone (Wearing Course), Basalt | CZ | 100 | ||
| Price Table Line Item 0008 AE: Supply Stones (Bearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0008 AF: Supply Stone (Wearing Course), Dolomite | CZ | 100 | ||
| Price Table Line Item 0009. Torrent Structures | ||||
| Price Table Line Item 0009 AA: Torrent Structure, 9-meter length, 1 meter high | MT | 4 | ||
| Price Table Line Item 0009 AB: Torrent Structure, 1 meter high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0009 AC: Torrent Structure, 9 meter length, 2 meter high | MT | 4 | ||
| Price Table Line Item 0009 AD: Torrent Structure, 2 meters high, additional 1 meter length | MT | 8 | ||
| Price Table Line Item 0010: Pump | ||||
| Price Table Line Item 0010 AA: Pump Water, 3 - 6 liters/sec, 5 - 7 meter head | DY | 5 | ||
| Price Table Line Item 0010 AB: Pump Water, 10 liters/sec, 5 - 7 meter head | DY | 30 | ||
| Price Table Line Item 0010 AC: Pump Slurry | CZ | 100 | ||
| Price Table Line Item 0011: Cleaning of Trenches | SM | 200 | ||
| Price Table Line Item 0012: Excavator for both non-wetland and wetland areas | ||||
| Price Table Line Item 0012AA: Excavator for Non-wetland Areas (1 DAY) | DY | 15 | ||
| Price Table Line Item 0012AB: Excavator for Non-wetland Areas (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AC: Wetland Tracked Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AD: Wetland Tracked Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AE: Small Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AF: Small Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AG: Medium Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AH: Medium Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0012 AI: Large Mini-Excavator (1 day) | DY | 15 | ||
| Price Table Line Item 0012 AJ: Large Mini-Excavator (1 week) | WK | 2 | ||
| Price Table Line Item 0013: Pipe Flushing truck | DY | 5 | ||
| Price Table Line Item 0014: Lifting Platform | DY | 3 | ||
| Price Table Line Item 0015 Mulchers | ||||
| Price Table Line Item 0015 AA: Small Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AB: Small Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AC: Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AD: Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0015 AE: High Performance Forestry Mulcher (1 day) | DY | 20 | ||
| Price Table Line Item 0015 AF: High Performance Forestry Mulcher (1 week) | WK | 5 | ||
| Price Table Line Item 0016 Dozer | ||||
| Price Table Line Item 0016 AA: 60-69HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AB: 60-69HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AC: 70-79HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AD: 70-79HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AE: 80-89HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AF: 80-89HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0016 AG: 90-100HP DOZER (1 day) | DY | 20 | ||
| Price Table Line Item 0016 AH: 90-100HP DOZER (1 week) | WK | 5 | ||
| Price Table Line Item 0017 Crane | ||||
| Price Table Line Item 0017 AA: 5,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AB: 5,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AC: 8,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AD: 8,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AE: 18,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AF: 18,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0017 AG: 30,000LB Industrial Crane (1 day) | DY | 20 | ||
| Price Table Line Item 0017 AH: 30,000LB Industrial Crane (1 week) | WK | 5 | ||
| Price Table Line Item 0018 Cherry Picker (Articulating Boom Lift) | ||||
| Price Table Line Item 0018 AA: 1-10m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AB: 1-10m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0018 AC: 11-20m Articulating Boom Lift (1 day) | DY | 20 | ||
| Price Table Line Item 0018 AD: 11-20m Articulating Boom Lift (1 week) | WK | 5 | ||
| Price Table Line Item 0019 Truck, Stake Bed | ||||
| Price Table Line Item 0019 AA: Truck, Stake Bed 12’-16’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AB: Truck, Stake Bed 12’-16’ (1 week) | WK | 5 | ||
| Price Table Line Item 0019 AC: Truck, Stake Bed 20’-24’ (1 day) | DY | 20 | ||
| Price Table Line Item 0019 AD: Truck, Stake Bed 20’-24’ (1 week) | WK | 5 | ||
| Price Table Line Item 0020 Conveyor Belt | ||||
| Price Table Line Item 0020 AA: Conveyor belt (1 day) | DY | 20 | ||
| Price Table Line Item 0020 AB: Conveyor Belt (1 week) | WK | 5 | ||
| Price Table Line Item 0021 Backhoe | ||||
| Price Table Line Item 0021 AA Kubota L35. (1 DAY) | DY | 20 | ||
| Price Table Line Item 0021 AB Kubota L35. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AC 580 Standard Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AD 580 Standard Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0021 AE 590 Backhoe. (1 Day) | DY | 20 | ||
| Price Table Line Item 0021 AF 590 Backhoe. (1 Week) | WK | 5 | ||
| Price Table Line Item 0022 Dump Truck | ||||
| Price Table Line Item 0022 AA: Dump Truck (1 day) | DY | 20 | ||
| Price Table Line Item 0022 AB: Dump Truck (1 week) | WK | 5 | ||
| Price Table Line Item 0023 Tractor PTO and Brush Clearing Attachments | ||||
| Price Table Line Item 0023 AA: Small Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AB: Small Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AC: Medium Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AD: Medium Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AE: Large Single-Spindle Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AF: Large Single-Spindle Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AG: Small Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AH: Small Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AI: Medium Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AJ: Medium Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0023 AK: Large Single-Spindle SQUEALER Rotary Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0023 AL: Large Single-Spindle SQUEALER Rotary Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0024 Push Mower | ||||
| Price Table Line Item 0024 AA: Push Mower (1 day) | DY | 20 | ||
| Price Table Line Item 0024 AB: Push Mower (1 week) | WK | 5 | ||
| Price Table Line Item 0025 Amphibious weed Cutter | ||||
| Price Table Line Item 0025 AA: Amphibious Weed Cutter (1 day) | DY | 20 | ||
| Price Table Line Item 0025 AB: Amphibious Weed Cutter (1 week) | WK | 5 | ||
| Price Table Line Item 0026 Walking Excavator | ||||
| Price Table Line Item 0026 AA: Walking Excavator (1 day) | DY | 20 | ||
| Price Table Line Item 0026 AB: Walking Excavator (1 week) | WK | 5 | ||
| Price Table Line Item 0027 Survey Work | ||||
| Price Table Line Item 0027 AA: Survey Work | DY | 20 | ||
| Price Table Line Item 0027 AB: Survey Basin Capacity | EA | 5 | ||
| Price Table Line Item 0028 Tree/Shrub Clearing | SM | 100 | ||
| Price Table Line Item 0029 Clearing of Clogged Pipes |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .