ATTACHMENT 2
Erosion Prevention, Dust Control, and Natural Resource Protection.
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed; work at US military installations within Germany is more relevant: ___________________________________
2. The day, month, and year work was completed; work must not be earlier than 2007: _______________
3. The final cost of this project, shall be between €75,000 and €300,000 (Projects that fall within the stated range are considered more relevant than those that do not): €_________________________
4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work performed for projects in at least one of the following categories, but work in more than one category may receive a higher rating:
a. Wildlife and plant habitat improvements and follow-up monitoring (includes remote monitoring of species (using camera/monitoring systems)
b. Maintenance of historic orchards (includes maintaining or encouraging specific varieties/species)
c. Engineer design, studies, and plans for land rehabilitation and maintenance
d. Construction and/or repair of erosion control structures (including check dams, culverts, drainage stabilization, and sink holes)
e. Road and Trail Repair and/or Construction
f. Land and Watershed Management (including vegetation clearing and invasive species removal)
(Continue typing if required to provide more information)
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.